NAWY E G.Prestressed Concrete:A Fundamental Approach[M].Englewood Cliffs:Prentice Hall,2006.
[2]
牛 斌,杨梦蛟,马 林.预应力混凝土宽箱梁剪力滞效应试验研究[J].中国铁道科学,2004,25(2):25-30. NIU Bin,YANG Meng-jiao,MA Lin.Shear Lag Effect Test and Study of PC Wide Box Beam[J].China Railway Science,2004,25(2):25-30.
[3]
余天庆,宁柳明.悬臂预应力箱梁的剪力滞效应有限元分析[J].湖北工业大学学报,2010,25(2):86-88. YU Tian-qing,NING Liu-ming.Finite Element Analysis of Shear Lag Effect in PC Box-girder[J].Journal of Hubei University of Technology,2010,25(2):86-88.
[4]
王荣霞,金克喜,王 玲.体外预应力筋加固不同初始状态箱梁受力性能的试验研究[J].土木工程学报,2010,43(增):224-229. WANG Rong-xia,JIN Ke-xi,WANG Ling.Experimental Analysis on Mechanical Property of Externally Prestressed Box Beams Based on Different Original Status[J].China Civil Engineering Journal,2010,43(S):224-229.
[5]
CHANG S T.Prestress Influence on Shear-lag Effect in Continuous Box-girder Bridge[J].Journal of Structural Engineering,1992,118(11):3113-3121.
[6]
ZHOU Shi-jun.Shear Lag Analysis in Prestressed Concrete Box Girders[J].Journal of Bridge Engineering,2011,16(4):500-512.
[7]
蔺鹏臻,周世军.基于剪切变形规律的箱梁剪力滞效应研究[J].铁道学报,2011,33(4):100-104. LIN Peng-zhen,ZHOU Shi-jun.Analysis on Shear-lag Effect of Box Girders Based on Flange-slab Shear Deformation Law[J].Journal of the China Railway Society,2011,33(4):100-104.
[8]
郭金琼,房贞政,郑 振.箱型梁设计理论[M].2版.北京:人民交通出版社,2008. GUO Jin-qiong,FANG Zhen-zheng,ZHENG Zhen.Design Theory for Box Girder[M].2nd ed.Beijing:China Communications Press,2008.
[9]
罗旗帜,吴幼明,刘光栋.变高度薄壁箱梁的剪力滞[J].铁道学报,2003,25(5):81-87. LUO Qi-zhi,WU You-ming,LIU Guang-dong.Shear Lag of Thin-wall Box Girder with Varying Depths[J].Journal of the China Railway Society,2003,25(5):81-87.