宋 杰.千岛湖大桥主要技术特点和创新[J].桥梁建设, 2007(2):58-61. SONG Jie.Major Technical Features and Innovation of Qiandao Lake Bridge[J].Bridge Construction,2007 (2):58-61.
[2]
李 跃, 古 松, 卜一之, 等.新光大桥三角刚架施工过程模型试验及有限元分析[J].公路交通科技, 2008, 25(2):94-100. LI Yue,GU Song,BU Yi-zhi,et al.Model Test and FEM Analysis on Triangle Frame of Xinguang Bridge[J].Journal of Highway and Transportation Research and Development,2008,25(2):94-100.
[3]
翟晓亮, 刘 喆, 冯云成.新月形拱-连续梁组合体系桥优化分析[J].公路交通科技, 2015, 32(3):68-74. ZHAI Xiao-liang,LIU Zhe,FENG Yun-cheng.Analysis of Optimizing Crescent Arch and Continuous Girder Combination Bridge[J].Journal of Highway and Transportation Research and Development,2015,32 (3):68-74.
[4]
勾红叶.大跨度预应力混凝土V形刚构拱组合桥受力行为研究[D].成都:西南交通大学, 2010. GOU Hong-ye.Study on the Mechanical Behaviors of Long-span Prestressed Concrete V-shape Rigid Frame Composite Arch Bridge [D].Chengdu:Southwest Jiaotong University,2010.
[5]
黄小伟,王 浩,李爱群, 等.中承式异形钢管混凝土拱桥动力特性分析[J].建筑科学与工程学报,2012,29(1):87-93. HUANG Xiao-wei,WANG Hao,LI Ai-qun,et al.Analysis on Dynamic Characteristics of Half-through Special-shaped CFST Arch Bridge[J].Journal of Architecture and Civil Engineering,2012,29(1):87-93.
[6]
孔 敏.倾斜型预压式钢-混凝土结合段受力性能研究[D].西安:长安大学, 2011. KONG Min.Study on Mechanical Performance of the Tilt-preloading Type Steel-concrete Combining Section[J].Xi'an:Chang'an University, 2011.
[7]
李国亮, 刘 钊.V形刚构桥施工中倒三角区域支架的拆除时机分析[J].公路交通科技, 2005, 22(8):95-101. LI Guo-liang,LIU Zhao.Study on the Demolishment Sequence of Scaffolds for the Inverted-triangle Area of the Rigid-frame Bridges with V-piers[J].Journal of Highway and Transportation Research and Development,2005,22(8):95-101.
[8]
闫子才, 黄 新, 张 敏.南京集庆门大桥V形墩刚构施工技术[J].桥梁建设, 2003(6):55-57,73. YAN Zi-cai,HUANG Xin,ZHANG Min.Construction Techniques for V-shape Pier Rigid-frame Structure of Jiqingmen Bridge in Nanjing[J].Bridge Construction,2003(6):55-57,73.
[9]
潘寿东.连续刚构桥V型墩“平衡支架法”施工技术研究[J].石家庄铁道学院学报, 2005, 18(4):100-104. PAN Shou-dong.Construction Technology of V-shaped Pier for Continuous Rigid Bridge with Balanced Trestle Method[J].Journal of Shijiazhuang Railway Institute,2005,18(4):100-104.
[10]
刘宝龙.水中大体积V型墩斜腿组合式支撑体系下施工技术研究[J].铁道工程学报, 2011(3):52-57. LIU Bao-long.Research on Construction Technology of Massive V-shape Pier in Water Under Slant-leg Combined Supporting[J].Journal of Railway Engineering Society,2011(3):52-57.
[11]
张义和.横桥向不等高V形墩施工关键技术研究[D].杭州:浙江工业大学, 2013. ZHANG Yi-he.Study on the Construction Technique of Transverse V-shaped Pier with Columns of Unequal Height [D].Hangzhou: Zhejiang University of Technology,2013.
[12]
罗甲生, 赵灿辉, 古 松, 等.连续刚架-拱桥三角刚架模型试验研究[J].桥梁建设, 2008(1):26-29. LUO Jia-sheng,ZHAO Can-hui,GU Song,et al.Model Test Study of Triangle Frame of a Continuous Rigid-framed Arch Bridge[J].Bridge Construction,2008 (1):26-29.
[13]
勾红叶, 蒲黔辉, 施 洲.大跨度V形刚构拱组合桥V形墩梁节点模型试验研究[J].土木工程学报, 2010, 43(3):99-105. GOU Hong-ye,PU Qian-hui,SHI Zhou.Model Test for the V-shape Pier-girder Joint of Long-span V-shape Rigid Frame Composite Arch Bridges[J].China Civil Engineering Journal,2010,43(3):99-105.
[14]
张国庆.V形墩连续梁桥墩顶拉板病害仿真分析及对策[J].桥梁建设, 2006(1):76-78. ZHANG Guo-qing.Simulation Analysis of and Countermeasures Against Deteriorations of Tensioning Plates Atop V-shape Piers of a Continuous Girder Bridge[J].Bridge Construction,2006(1):76-78.
[15]
LIN T Y,BURNS N H.Design of Prestressed Concrete Structures[M].3rd ed.New York: John Wiley & Sons,1981.
[16]
BORESI A P,SCHMIDT R J.Advanced Mechanics of Materials [M].6th ed.New York: John Wiley & Sons,2003.
[17]
包世华, 张铜生.高层建筑结构设计和计算[M].北京:清华大学出版社, 2007. BAO Shi-hua,ZHANG Tong-sheng.Design and Analysis of Tall-building Structure[M].Beijing: Tsinghua University Press,2007.