陈皓勇,王锡凡.机组组合问题的优化方法综述[J].电力系统自动化,1999,23(4):51-56.Chen Haoyong,Wang Xifan.A survey of optimization- based methods for unit commitment[J].Automation of Electric Power Systems,1999,23(4):51-56(in Chinese).
[2]
夏清,钟海旺,康重庆.安全约束机组组合理论与应用的发展和展望[J].中国电机工程学报,2013,33(16):94-103.Xia Qing,Zhong Haiwang,Kang Chongqing.Review and prospects of the security constrained unit commitment theory and applications[J].Proceedings of the CSEE,2013,33(16):94-103(in Chinese).
[3]
汪洋,夏清,康重庆.机组组合算法中起作用整数变量的辨识方法[J].中国电机工程学报,2010,30(13):46-52.Wang Yang,Xia Qing,Kang Chongqing.Identification of the active integer variables in security constrained unit commitment[J].Proceedings of the CSEE,2010,30(13):46-52(in Chinese).
[4]
韦化,龙丹丽,黎静华.求解大规模机组组合问题的策略迭代近似动态规划[J].中国电机工程学报,2014,34(25):4420-4429.Wei Hua,Long Danli,Li Jinghua.Policy iteration- approximate dynamic programming for large scale unit commitment problems[J].Proceedings of the CSEE,2014,34(25):4420-4429(in Chinese).
[5]
Senjyu T,Shimabukuro K,Uezato K,et al.A fast technique for unit commitment problem by extended priority list[J].IEEE Transactions on Power Systems,2003,18(2) :882-888.
[6]
黎静华,韦化,夏小琴.求解机组组合问题的改进模式搜索算法[J].中国电机工程学报,2011,31(28):33-41.Li Jinghua,Wei Hua,Xia Xiaoqin.Improved general pattern search filter algorithm for unit commitment problems[J].Proceedings of the CSEE,2011,31(28):33-41(in Chinese).
[7]
白晓民,于尔铿.用动态规划法进行电力系统机组组合最优化[J].电机工程学报,1984,4(1):11-19.Bai Xiaomin,Yu Erkeng.Optimization for unit commitment of electric power system by dynamic programming[J].Journal of Electrical Engineering,1984,4(1):11-19(in Chinese).
[8]
Ongsakul W,Petcharaks N.Unit commitment by enhanced adaptive Lagrangian relaxation[J].IEEE Transactions on Power Systems,2004,19(1):620-628.
[9]
杨朋朋,韩学山.基于改进拉格朗日乘子修正方法的逆序排序机组组合[J].电网技术,2006,30(9):40-45.Yang Pengpeng,Han Xueshan.Unit decommitment based on improved Lagrangian multiplier modification method[J].Power System Technology,2006,30(9):40-45(in Chinese).
[10]
Habibollahzadeh H,Bubenko J A.Application of decomposition techniques to short-term operation planning of hydrothermal power system[J].IEEE Transactions on Power Systems,1986,1(1):41-47.
[11]
Cohen A I,Yoshimura M.A branch-and-bound algorithm for unit commitment[J].IEEE Transactions on Power Apparatus and Systems,1983,PAS-102(2):444-451.
[12]
全然,韦化,简金宝.求解大规模机组组合问题的二阶锥规划方法[J].中国电机工程学报,2010,30(25):101-107.Quan Ran,Wei Hua,Jian Jinbao.Solution of large scale unit commitment by second-order cone programming [J].Proceedings of the CSEE,2010,30(25):101-107(in Chinese).
[13]
杨林峰,简金宝,郑海艳,等.求解机组组合问题的次超立方紧混合整数规划广义割平面法[J].中国电机工程学报,2013,33(1):99-108.Yang Linfeng,Jian Jinbao,Zheng Haiyan,et al.A sub hyper-cube tight mixed integer programming extended cutting plane method for unit commitment[J].Proceedings of the CSEE,2013,33(1):99-108(in Chinese).
[14]
Han D L,Jian J B,Yang L F.Outer approximation and outer-inner approximation approaches for unit commitment problem[J].IEEE Transactions on Power Systems,2014,29(2):505-513.
[15]
Kazarlis S A,Bakirtzis A G,Petridis V.A genetic algorithm solution to the unit commitment problem [J].IEEE Transactions on Power Systems,1996,11(1):83-92.
[16]
孙力勇,张焰,蒋传文.基于矩阵实数编码遗传算法求解大规模机组组合问题[J].中国电机工程学报,2006,26(2):82-87.Sun Liyong,Zhang Yan,Jiang Chuanwen.A solution to the unit commitment problem based on matrix real-coded genetic algorithm[J].Proceedings of the CSEE,2006,26(2):82-87(in Chinese).
[17]
胡家声,郭创新,曹一家.一种适合于电力系统机组组合问题的混合粒子群优化算法[J].中国电机工程学报,2004,24(4):24-28.Hu Jiasheng,Guo Chuangxin,Cao Yijia.A hybrid particle swarm optimization method for unit commitment problem[J].Proceedings of the CSEE,2004,24(4):24-28(in Chinese).
[18]
王喆,余贻鑫,张弘鹏.社会演化算法在机组组合中的应用[J].中国电机工程学报,2004,24(4):12-17.Wang Zhe,Yu Yixin,Zhang Hongpeng.Social evolutionary programming based unit commitment [J].Proceedings of the CSEE,2004,24(4):12-17(in Chinese).
[19]
Juste K A,Kita H,Tanaka E,et al.An evolutionary programming solution to the unit commitment problem [J].IEEE Transactions on Power Systems,1999,14(4):1452-1459.
[20]
Mantawy A H,Abdel-Magid Y L,Selim S Z.Integrating genetic algorithms,tabu search,and simulated annealing for the unit commitment problem[J].IEEE Transactions on Power Systems,1999,14(3):829-836.
[21]
Ouyang Z,Shahidehpour S M.A hybrid artificial neural network-dynamic programming approach to unit commitment[J].IEEE Transactions on Power Systems,1992,7(1):236-242.
[22]
Long G L.Grover algorithm with zero theoretical failure rate[J].Physical Review A,2001,64(2):022307.
Grover L K.Quantum mechanics helps in searching for a needle in a haystack[J].Physical Review Letters,1997,79(2):325-327.
[25]
Baritompa W P,Bulger D W,Wood G R.Grover’s quantum algorithm applied to global optimization [J].SIAM Journal on Optimization,2005,15(4):1170-1184.
[26]
Han K H,Kim J H.Quantum-inspired evolutionary algorithm for a class of combinatorial optimization [J].IEEE Transactions on Evolutionary Computation,2002,6(6):580-593.
[27]
Naguleswaran S,Langford B W.Quantum search in stochastic planning[C]//Proc. SPIE 5864,Noise and Information in Nanoelectronics,Sensors,and Standards III.Austin,TX:SPIE,2005:34-45.
[28]
Dong D Y,Chen C L,Li H X,et al.Quantum reinforcement learning[J].IEEE Transactions on Systems,Man,and Cybernetics,Part B:Cybernetics,2008,38(5):1207-1220.
[29]
Lau T W,Chung C Y,Wong K P,et al.Quantum-inspired evolutionary algorithm approach for unit commitment [J].IEEE Transactions on Power Systems,2009,24(3):1503-1512.
[30]
Jeong Y W,Park J B,Jang S H,et al.A new quantum- inspired binary PSO:application to unit commitment problems for power systems[J].IEEE Transactions on Power Systems,2010,25(3):1486-1495.
[31]
吴小珊,张步涵,袁小明,等.求解含风电场的电力系统机组组合问题的改进量子离散粒子群优化方法[J].中国电机工程学报,2013,33(4):45-52.Wu Xiaoshan,Zhang Buhan,Yuan Xiaoming,et al.Solutions to unit commitment problems in power systems with wind farms using advanced quantum- inspired binary PSO[J].Proceedings of the CSEE,2013,33(4):45-52(in Chinese).
[32]
张化光,张欣,罗艳红,等.自适应动态规划综述[J].自动化学报,2013,39(4):303-311.Zhang Huaguang,Zhang Xin,Luo Yanhong,et al.An overview of research on adaptive dynamic programming [J].Acta Automatica Sinica,2013,39(4):303-311(in Chinese).
[33]
Powell W B.Approximate dynamic programming:solving the curses of dimensionality[M].2nd ed.New York:John Wiley and Sons,2011:111-166.
[34]
赵子臣,相年德,夏清,等.应用启发式与逐步动态规划法进行机组最优组合[J].清华大学学报:自然科学版,1997,37(1):57-60.Zhao Zichen,Xiang Niande,Xia Qing,et al.Hybrid heuristic-progressive optimality approach to unit commitment[J].Journal of Tsinghua University:Sci & Tech,1997,37(1):57-60(in Chinese).
[35]
Guan X H,Guo S G,Zhai Q Z.The conditions for obtaining feasible solutions to security-constrained unit commitment problems[J].IEEE Transactions on Power Systems,2005,20(4):1746-1756.
[36]
雷雪姣,潘士娟,管晓宏,等.考虑传输安全裕度的电力系统发电经济调度[J].中国电机工程学报,2014,34(31):5651-5658.Lei Xuejiao,Pan Shijuan,Guan Xiaohong,et al.Transmission safety margin constrained unit commitment in power systems[J].Proceedings of the CSEE,2014,34(31):5651-5658(in Chinese).
[37]
郭三刚,张琳,曹吉利,等.基于线性规划的电力系统经济分配新方法[J].工程数学学报,2010,27(1):65-77.Guo Sangang,Zhang Lin,Cao Jili,et al.New methods for economic dispatch in power systems based on linear programs[J].Chinese Journal of Engineering Mathematics,2010,27(1):65-77(in Chinese).
[38]
韩学山,柳焯.考虑机组爬坡速度和网络安全约束的经济调度解耦算法[J].电力系统自动化,2002,26(13):32-37.Han Xueshan,Liu Zhuo.Decoupled economic dispatch including unit ramp rate and network security constraints [J].Automation of Electric Power Systems,2002,26(13):32-37(in Chinese).
[39]
韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16.Han Xueshan,Liu Zhuo.Optimal unit commitment considering unit’s ramp-rate limits[J].Power Systems Technology,1994,18(6):11-16(in Chinese).