孙彰林,樊春雷.基于击距法的高速铁路牵引网防雷特性研究[J].铁道工程学报,2012(9),80-83.Sun Zhanglin,Fan Chunlei.Research on Lightning performance of traction network for high-speed railway based on striking distance method[J].Journal of Railway Engineering Society,2012(9),80-83(in Chinese).
[2]
赵紫辉,吴广宁,曹晓斌,等.基于电气几何模型的接触网避雷线架设高度计算方法[J].中国铁道科学,2011,32(6):89-93.Zhao Zihui,Wu Guangning,Cao Xiaobin,et al.EGM based calculation method for the installation height of catenary ground wire[J].China Railway Science,2011,32(6):89-93(in Chinese).
[3]
Arai H,Watanabe I,Motoyama H,et al.Calculation model to evaluate effects of lightning protection measures on railway signalling equipment[C]//2011 International Symposium on Lightning Protection(XI SIPDA).Fortaleza,Brazils:South Brazil Section,Institute of Electrotechnics and Energy,University of São Paulo,3-7 Oct.2011:247-250.
[4]
Kim Y S,Shong K M,Jeon Y J.A study on the site vibration for the breakage analysis of glass insulators on the high-speed railway[J].IEEE Transactions on Power Delivery,2009,24(4):1809-1814.
[5]
Pereira B C,Piantini A.Analysis of the dielectric behavior of distribution insulators under non-standard lightning impulse voltage[J].IEEE Latin America Transactions,2011,9(5):732-739.
[6]
Ancajima A,Carrus A,Cinieri E,et al.Behavior of MV insulators under lightning-induced overvoltages:experimental results and reproduction of volt-time characteristics by disruptive effect models[J].IEEE Transactions on Power Delivery,2010,25(1):221-230.
[7]
国网电力科学研究院.京沪高铁、东南沿海高铁沿线雷电活动规律研究报告[R].武汉:国网电力科学研究院,2012.State Grid Electric Power Research Institute.Study report on lightning activity laws of Beijing-Shanghai high-speed railway and southeastern coastal areas high-speed railway[R].Wu Han:State Grid Electric Power Research Institute,2012(in Chinese).
[8]
张慎.沪宁区间接触网雷害分析及防雷措施改进建议[J].上海铁道科技,2011(4):103-104.Zhang Shen.Analysis on lightning accidents and suggestions for improvement of lightning protection measures of overhead contact system in Shanghai-Nanjing railway[J].Shanghai Railway Science & Technology,2011(4):103-104(in Chinese).
[9]
苏冬冬.京沪高铁接触网防雷问题的探讨[J].上海铁道科技,2011(4):52-53.Su Dongdong.Discussions on lightning protection of overhead contact system in Beijing-Shanghai high-speed railway[J].Shanghai Railway Science & Technology,2011(4):52-53(in Chinese).
[10]
许毅涛.京沪高铁接触网雷击跳闸分析及改造建议[J].电气化铁道,2013(1):32-35.Xu Yitao.Analysis and reform suggestions for catenary lightning trip-out in Beijing-Shanghai high-speed railway[J].Electrified Railway,2013(1):32-35(in Chinese).
边凯,陈维江,王立天,等.高速铁路牵引供电接触网雷电防护[J].中国电机工程学报,2013,33(10):191-199.Bian Kai,Chen Weijiang,Wang Litian,et al.Lightning protection of traction power supply catenary of high-speed railway[J].Proceedings of the CSEE,2013,33(10):191-199(in Chinese).
[13]
周利军,高峰,李瑞芳,等.高速铁路牵引供电系统雷电防护体系[J].高电压技术,2013,39(2):399-406.Zhou Lijun,Gao Feng,Li Ruifang,et al.Lightning protection system of traction power supply system for high-speed railway[J].High Voltage Engineer,2013,39(2):399-406(in Chinese).
[14]
Ning B,Tang T,Dong H R,et al.An introduction to parallel control and management for high-speed railway systems[J].IEEE Transactions on Intelligent Transportation systems,2011,12(4):1473-1483.
[15]
刘明光.铁道电网过电压分析与防护[M].北京:北京交通大学出版社,2009:4-85.Liu Mingguang.Analysis and protection of railway power network overvoltage[M].Beijing:Beijing Jiaotong University Press,2009:4-85(in Chinese).
[16]
郝帅.牵引变电所雷电侵入波保护方案研究[J].电瓷避雷器,2011(2):35-39.Hao Shuai.Research on the protection projects of lightning intruding wave in traction substation[J].Insulators and Surge Arresters,2011(2):35-39(in Chinese).
[17]
曹晓斌,熊万亮,吴广宁,等.接触网引雷范围划分及跳闸率的计算方法[J].高电压技术,2013,39(6):1515-1521.Cao Xiaobin,Xiong Wanliang,Wu Guangning,et al.Lightning scope division and lighting trip-out rate calculation method for overhead catenary system[J].High Voltage Engineer,2013,39(6):1515-1521(in Chinese).
[18]
刘靖,刘明光,屈志坚,等.接触网雷击跳闸率的新算法[J].中国铁道科学,2010,31(2):73-78.Liu Jing,Liu Mingguang,Qu Zhijian,et al.A new algorithm for the lightning outage rate of the catenary[J].China Railway Science,2010,31(2):73-78(in Chinese).
[19]
刘靖,刘明光,屈志坚,等.计算接触网雷击参数的新方法[J].中国铁道科学,2011,32(4):76-81.Liu Jing,Liu Mingguang,Qu Zhijian,et al.A new method for calculating the lightning parameters of catenary[J].China Railway Science,2011,32(4):76-81(in Chinese).
[20]
陈维江,贺恒鑫,钱冠军,等.基于长间隙放电研究雷电屏蔽问题的进展[J].中国电机工程学报,2012,32(10):1-12.Chen Weijiang,He Hengxin,Qian Guanjun,et al.Review of the lightning shielding against direct lightning strokes based on laboratory long air gap discharges[J].Proceedings of the CSEE,2012,32(10):1-12(in Chinese).
[21]
Cooray V,Rakov V,Theethayi N.The lightning striking distance-Revisited[J].Journal of Electrostatics,2007,65(5):296-306.
[22]
马御棠,吴广宁,曹晓斌,等.微地形下输电线路绕击闪络率的计算方法[J].中国电机工程学报,2011,31(22):135-141.Ma Yutang,Wu Guangning,Cao Xiaobin,et al.Calculation of shielding failure flashover rate of transmission line under micro-topography condition[J].Proceedings of the CSEE,2011,31(22):135-141(in Chinese).
[23]
张志劲,司马文霞,蒋兴良,等.超/特高压输电线路雷电绕击防护性能研究[J].中国电机工程学报,2005,25(10):1-6.Zhang Zhijin,Sima Wenxiang,Jiang Xingliang,et al.Study on the lightning protection performance of shielding failure for UHV & EHV transmission lines[J].Proceedings of the CSEE,2005,25(10):1-6(in Chinese).
[24]
郭小霞,樊春雷.高速铁路雷击跳闸率的研究[J].电气化铁道,2011(6):29-31.Guo Xiaoxia,Fan Chunlei.Research on lightning outage rate of high-speed railway[J].Electrified Railway,2011(6):29-31(in Chinese).
[25]
樊春雷,郭小霞,李汉卿.高速铁路暂态模型搭建与仿真分析[J].电气化铁道,2011(5):9-11.Fan Chunlei,Guo Xiaoxia,Li Hanqing.Simulation analysis and transient modeling for high-speed railway[J].Electrified Railway,2011(5):9-11(in Chinese).