冉晓洪,苗世洪,刘阳升,等.考虑风光荷联合作用下的电力系统经济调度建模[J].中国电机工程学报,2014,34(16):2552-2560.Ran Xiaohong,Miao Shihong,Liu Yangsheng,et al.Modeling of economic dispatch of power system considering joint effect of wind power,solar energy and load[J].Proceedings of the CSEE,2014,34(16):2552-2560(in Chinese).
[2]
孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(04):41-47.Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(04):41-47(in Chinese).
[3]
邱威,张建华,刘念,等.计及运行风险的多目标发电优化调度[J].中国电机工程学报,2012,32(22):64-72.Qiu Wei,Zhang Jianhua,Liu Nian,et al.Multi-objective optimal generation dispatch with consideration of operation risk[J].Proceedings of the CSEE,2012,32(22):64-72(in Chinese).
[4]
文云峰,江宇飞,沈策,等.多阶段整合的风险调度模型及算法研究[J].中国电机工程学报,2014,34(01):153-167.Wen Yunfeng,Jiang Yufei,Shen Ce,et al.Research on the model and algorithm of multistage coordinated risk-based dispatch[J].Proceedings of the CSEE,2014,34(01):153-167(in Chinese).
[5]
孙强,张义斌,韩冬,等.多因素、多维度的智能电网风险评估[J].电网技术,2012,36(09):51-55.Sun Qiang,Zhang Yibin,Han Dong,et al.Multifactorial and multidimensional risk evaluation of smart grid[J].Power System Technology,2012,36(09):51-55(in Chinese).
[6]
周玮,孙辉,顾宏,等.计及风险备用约束的含风电场电力系统动态经济调度[J].中国电机工程学报,2012,32(01):47-55.Zhou Wei,Sun Hui,Gu Hong,et al.Dynamic economic dispatch of wind integrated power systems based on risk reserve constraints[J].Proceedings of the CSEE,2012,32(01):47-55(in Chinese).
[7]
刘德伟,郭剑波,黄越辉,等.基于风电功率概率预测和运行风险约束的含风电场电力系统动态经济调度[J].中国电机工程学报,2013,33(16):9-15.Liu Dewei,Guo Jianbo,Huang Yuehui,et al.Dynamic economic dispatch of wind integrated power system based on wind power probabilistic forecasting and operation risk constraints[J].Proceedings of the CSEE,2013,33(16):9-15(in Chinese).
[8]
Varaiya P P,Wu F F,Bialek J W.Smart operation of smart grid:risk-limiting dispatch[J].Proceedings of the IEEE,2011,99(1):40-57.
[9]
Entriken R,Varaiya P,Wu F,et al.Risk limiting dispatch[C]//IEEE Power and Energy Society General Meeting.San Diego,CA:IEEE,2012:1-5.
[10]
Georgiev D,Janecek E.Risk limiting dispatch with optimal curtailing in active distribution networks[C]// European Control Conference (ECC).Zurich,2013:3046-3052.
[11]
Hasuike T,Katagiri H.Risk management for fuzzy random mst problem based on conditional value-at-risk [C]//International Conference on Information Science and Applications (ICISA).Jeju Island,2011:1-8.
[12]
Uryasev S.Conditional value-at-risk:optimization algorithms and applications[C]//IEEE/IAFE/INFORMS Conference on Computational Intelligence for Financial Engineering.New York,NY,2000:49-57.
[13]
Chen Z L,Powell W B.Convergent cutting-plane and partial-sampling algorithm for multistage stochastic liner programs with recourse[J].Journal of Optimization Theory and Applications,1999,3(102):497-524.
[14]
Pereira M V F.Pinto L M V G.Multi-stage stochastic optimization applied to energy planning[J].Mathematical Programming,1991,(52):359-375.
[15]
周任军,姚龙华,童小娇,等.采用条件风险方法的含风电系统安全经济调度[J].中国电机工程学报,2012,32(01):56-63.Zhou Renjun,Yao Longhua,Tong Xiaojiao,et al.Security economic dispatch in wind power integrated systems using a conditional risk method[J].Proceedings of the CSEE,2012,32(01):56-63(in Chinese).
[16]
雷雪姣,潘士娟,管晓宏,等.考虑传输安全裕度的电力系统发电经济调度[J].中国电机工程学报,2014,34(31):5651-5658.Lei Xuejiao,Pan Shijuan,Guan Xiaohong,et al.Transmission safety margin constrained unit commitment in power systems[J].Proceedings of the CSEE,2014,34(31):5651-5658(in Chinese).
[17]
Thim C K,Nourani M,Choong Y V.Value-at-risk and conditional value-at-risk estimation:a comparative study of risk performance for selected malaysian sectoral indices[J].International Conference on Statistics in Science,Business and Engineering (ICSSBE).2012:1-5.
[18]
Hetzer J,Yu D C,Bhattarai K.An economic dispatch model incorporating wind power[J].IEEE Transactions on Energy Conversion,2008,23(2):601-611.
[19]
肖运启,王昆朋,贺贯举,等.基于趋势预测的大型风电机组运行状态模糊综合评价[J].中国电机工程学报,2014,34(13):2132-2139.Xiao Yunqi,Wang Kunpeng,He Guanju,et al.Fuzzy comprehensive evaluation for operating condition of large-scale wind turbines based on trend predication[J].Proceedings of the CSEE,2014,34(13):2132-2139(in Chinese).
[20]
孙欣,吕跃春,高军,等.电网经济性与安全性的精益化协调方法[J].电网技术,2009,33(11):12-17.Sun Xin,Lü Yuechun,Gao Jun,et al.Power grid economy and security coordination lean method[J].Power System Technology,2009,33(11):12-17(in Chinese).
[21]
杨胜春,刘建涛,姚建国,等.多时间尺度协调的柔性负荷互动响应调度模型与策略[J].中国电机工程学报,2014,34(22),3664-3673.Yang Shengchun,Liu Jiantao,Yao Jianguo,et al.Model and strategy for multi-time scale coordinated flexible load interactive scheduling[J].Proceedings of the CSEE,2014,34(22),3664-3673(in Chinese).