舒印彪,张文亮.特高压输电若干关键技术研究[J].中国电机工程学报,2007,27(31):1-6.Shu Yinbiao,Zhang Wenliang.Research of key technologies for UHV transmission[J].Proceedings of the CSEE,2007,27(31):1-6(in Chinese).
[2]
陈勇,万启发,谷莉莉,等.关于我国特高压导线和杆塔结构的探讨[J].高电压技术,2004,30(6):38-41.Chen Yong,Wan Qifa,Gu Lili,et al.Discussions on UHV conductors and tower structure in China[J].High Voltage Engineering,2004,30(6):38-41(in Chinese).
[3]
杨磊,吴彤,郝阳,等.V型拉线塔在750kV输电线路工程中的应用[J].电力建设,2012,33(3):45-48.Yang Lei,Wu Tong,Hao Yang,et al.Application of guyed V tower in 750kV transmission lines[J].Electric Power Construction,2012,33(3):45-48(in Chinese).
[4]
郭绍宗.超高压线路拉线铁塔主柱截面形状选择及算法[J].电力建设,1986,7(4):29-36.Guo Shaozong.The algorithm for the UHV transmission guyed tower’s mast section shape[J].Electric Power Construction,1986,7(4):29-36(in Chinese).
[5]
杨经晓.冲击波荷载作用下拉线塔的非线性动力分析[J].计算结构力学及其应用,1991,8(2):139-145.Yang Jingxiao.Nonlinear dynamic analysis of guyed tower subjected to air blast loading[J].Computational Structural Mechanics and Applications,1991,8(2):139-145(in Chinese).
[6]
李志刚,杨林,项力恒,等.750kV输变电示范工程设计特点[J].中国电力,2005,38(12):6-11.Li Zhigang,Yang Lin,Xiang Liheng,et al.Design characteristics of 750kV transmission and transformation pilot project[J].Electric Power,2005,38(12):6-11(in Chinese).
[7]
孔伟,党剑,单良,等.拉线式输电塔初始状态下预应力的分布研究[J].吉林电力,2010,38(5):19-21.Kong Wei,Dang Jian,Shan Liang,et al.Study on initial pre-stresses distribution of guyed transmission tower[J].Jilin Electric Power,2010,38(5):19-21(in Chinese).
甘凤林,李小磊,高黔.拉线初始预应力分布对拉线杆塔受力影响的研究[J].广东电力,2010,23(9):8-10.Gan Fenglin,Li Xiaolei,Gao qian.Study on initial pre-stresses distribution of guyed transmission tower[J].Guangdong Electric Power,2010,23(9):8-10(in Chinese).
[10]
王德贺,杨晓军,李小磊.拉线门型塔中大风工况下拉线预应力变化影响结果的研究[J].黑龙江电力,2010,33(6):438-439.Wang Hede,Yang Xiaojun,Li Xiaolei.Study on the influence of strong-wind working conditions in guyed portal tower on the change of guy prestress[J].Heilongjiang Electric Power,2010,33(6):438-439(in Chinese).
[11]
周新华.高压输电铁塔结构强度分析[D].保定:华北电力大学,2003.Zhou Xinhua.The strength analysis of transmission tower[D].Baoding:North China Electrical Power Univercity,2003(in Chinese).
[12]
杨风利,党会学,杨靖波,等.导线舞动时输电铁塔承载性能及破坏模式分析[J].中国电机工程学报,2013,33(22):135-141.Yang Fengli,Dang Huixue,Yang Jingbo,et al.Analysis on bearing capacities and failure modes of transmission towers with galloping conductors[J].Proceedings of the CSEE,2013,33(22):135-141(in Chinese).
[13]
孔伟,林泽楠,赵飞桃.拉线初应力对抢修塔受力性能的影响[J].水电能源科学,2011,29(9):164-167.Kong Wei,Lin Zenan,Zhao Feitao.Influence of initial stress on mechanical property of maintenance tower[J].Water Resources and Power,2011,29(9):164-167(in Chinese).
[14]
中华人民共和国国家经济贸易委员会.DLT5154-2002架空送电线路杆塔结构设计技术规定[S].北京:中国电力出版社,2005.State Economic and Trade Commission of the People’s Republic of China.DL/T5154—2002 technical regulation of design for tower and pole structures of overhead transmission line[S].Beijing:China Electric Power Press,2005(in Chinese).
[15]
孔伟,朱明伟,付豪.架空输电线路导线在ANSYS中的找形分析[J].东北电力大学学报,2011,31(5/6):64-67.Kong Wei,Zhu Mingwei,Fu Hao.The find-forming of transmission line in ANSYS[J].Journal of Northeast Dianli University,2011,31(5/6):64-67(in Chinese).
[16]
王新敏.ANSYS工程结构数值分析[M].北京:人民交通出版社,2007:467-471.Wang Xinmin.Engineering structure numerical analysis by ANSYS[M].Beijing:China Communications Press,2007:467-471(in Chinese).
[17]
殷有泉.非线性有限元基础[M].北京:北京大学出版社,2007.2-18.Yin Youquan.Nonlinear finite element basis[M].Beijing:Peking University Press,2007.2-18(in Chinese).
[18]
上海市建设和标准委员会.GB 50135-2006,高耸结构设计规范[S].北京:中国建筑工业出版社,2006.Shanghai Construction and Traffic Committee.GB 50135-2006,Code for design of high-rising structures[S].Beijing:China Building Industry Press,2006(in Chinese).
[19]
Standards Committee for Design of Steel Transmission Towers.ASCE 10-97,Design of latticed steel transmission structures[S].New York:American Society of Civil Engineers,2000.
[20]
Ernst H J.Der e-modul von seilen unter beruksichtigung des durchhanges[J].Der Bauingenieur,1965,40(2):52-55.