汤涌, 卜广全, 易俊.印度“7.30”、“7.31”大停电事故分析及启示[J].中国电机工程学报, 2012, 32(25):167-174.Tang Yong, Bu Guangquan, Yi Jun.Analysis and lessons of the blackout in Indian power grid on July 30 and 31, 2012[J].Proceedings of the CSEE, 2012, 32(25):167-174(in Chinese).
[2]
陈亦平, 洪军.巴西“11.10”大停电原因分析及对我国南方电网的启示[J].电网技术, 2010, 34(5):77-82.Chen Yiping, Hong Jun.Analysis on causes of blackout occurred in Brazilian power grid on Nov.11, 2009 and lessons drawn from it to China southern power grid[J].Power System Technology, 2010, 34(5):77-82(in Chinese).
[3]
唐斯庆, 张弥, 李建设, 等.海南电网 “9.26”大面积停电事故的分析与总结[J].电力系统自动化, 2006, 30(1):1-7, 16.Tang Siqing, Zhang Mi, Li Jianshe, et al.Review of blackout in Hainan on September 26th:causes and recommendations[J].Automation of Electric Power Systems, 2006, 30(1):1-7, 16(in Chinese).
[4]
Kirschen D S, Volkmann T L.Guiding a power system restoration with an expert system.IEEE Trans. on Power Systems, 1991, 6(2):558-566.
[5]
Liu C C, Liou K L, Chu R F, et al.Generation capability dispatch for bulk power system restoration:A knowledge- based approach[J].IEEE Trans. on Power Systems, 1993, 8(1):316-325.
[6]
周云海, 闵勇, 杨滨.黑启动及其决策支持系统[J].电力系统自动化, 2001, 25(15):43-46.Zhou Yunhai, Min Yong, Yang Bin.Decision support system for black-start[J].Automation of Electric Power Systems, 2001, 25(15):43-46(in Chinese).
[7]
顾雪平, 赵书强, 刘艳, 等.一个实用的电力系统黑启动决策支持系统[J].电网技术, 2004, 28(9):54-57.Gu Xueping, Zhao Shuqiang, Liu Yan, et al.A practical decision support system for power system black start[J].Power System Technology, 2004, 28(9):54-57(in Chinese).
[8]
王洪涛, 刘玉田.电力系统恢复的主从递阶决策模型及其优化算法[J].中国电机工程学报, 2007, 27(1):8-13.Wang Hongtao, Liu Yutian.Leader-follower hierarchical decision model and optimal method for power system restoration[J].Proceedings of the CSEE, 2007, 27(1):8-13(in Chinese).
[9]
顾雪平, 钟慧荣, 贾京华, 等.电力系统扩展黑启动方案的研究[J].中国电机工程学报, 2011, 31(28):25-32.Gu Xueping, Zhong Huirong, Jia Jinghua, et al.Extended black-start schemes of power systems[J].Proceedings of the CSEE, 2011, 31(28):25-32(in Chinese).
[10]
周云海, 闵勇.恢复控制中的系统重构优化算法研究.中国电机工程学报, 2003, 23(4):67-70.Zhou Yunhai, Min Yong.Optimal algorithm for system reconstruction[J].Proceedings of the CSEE, 2003, 23(4):67-70(in Chinese).
[11]
周云海, 刘映尚, 胡翔勇.大停电事故后的系统网架恢复[J].中国电机工程学报, 2008, 28(10):32-36.Zhou Yunhai, Liu Yingshang, Hu Xiangyong.Power system network reconstruction after blackout[J].Proceedings of the CSEE, 2008, 28(10):32-36(in Chinese).
[12]
刘艳, 顾雪平.基于节点重要度评价的骨架网络重构[J].中国电机工程学报, 2007, 27(10):20-27.Liu Yan, Gu Xueping.Node importance assessment based skeleton-network reconfiguration[J].Proceedings of the CSEE, 2007, 27(10):20-27(in Chinese).
[13]
林振智, 文福拴.基于加权复杂网络模型的恢复路径优化方法[J].电力系统自动化, 2009, 33(6):11-15, 103.Lin Zhenzhi, Wen Fushuan.A new optimization method for determining restoration paths based on weighted complex network model[J].Automation of Electric Power Systems, 2009, 33(6):11-15, 103(in Chinese).
[14]
韩忠晖, 顾雪平, 刘艳.考虑机组启动时限的大停电后初期恢复路径优化[J].中国电机工程学报, 2009, 29(4):21-26.Han Zhonghui, Gu Xueping, Liu Yan.Optimization of restoration paths considering unit start-up time requirements at early stage of power system restoration[J].Proceedings of the CSEE, 2009, 29(4):21-26(in Chinese).
[15]
刘强, 石立宝, 倪以信, 等.电力系统恢复控制的网络重构智能优化策略[J].中国电机工程学报, 2009, 29(13):8-15.Liu Qiang, Shi Libao, Ni Yixin, et al.Intelligent optimization strategy of the power grid reconfiguration during power system restoration[J].Proceedings of the CSEE, 2009, 29(13):8-15(in Chinese).
[16]
刘国良, 刘艳, 顾雪平.输电网网架恢复方案关键线路辨识[J].电力系统自动化, 2011, 35(1):23-27.Liu Guoliang, Liu Yan, Gu Xueping.Identification of critical lines in restoration scheme for transmission network[J].Automation of Electric power systems, 2011, 35(1):23-27(in Chinese).
[17]
刘艳, 刘国良, 顾雪平.输电网架恢复方案线路投运风险评估[J].电力系统自动化, 2011, 35(13):12-16.Liu Yan, Liu Guoliang, Gu Xueping.Line risk assessment in transmission network restoration schemes[J].Automation of Electric power systems, 2011, 35(13):12-16(in Chinese).
[18]
张玉琼, 顾雪平.基于随机统计分析的黑启动操作过电压的计算校验[J].电工技术学报, 2005, 20(5):92-97.Zhang Yuqiong, Gu Xueping.Computation and statistical evaluation of operating over-voltages in black-start process of power systems[J].Transactions of China Electrotechnical Society, 2005, 20(5):92-97(in Chinese).
[19]
Zadeh L A.Fuzzy sets[J].Information and Control, 1965(8):338-353.
[20]
Zadeh L A.Fuzzy sets as a basis for a theory of possibility[J].Fuzzy Sets and Systems, 1978, 1(1):3-28.
[21]
Dubois D, Prade H.Fuzzy sets and systems:theory of applications[M].New York:Academic Press, 1980:21-50.
[22]
Shafer G.A mathematical theory of evidence[M].Princeton:Princeton University Press, 1976:35-43.
[23]
Sugeno M.Theory of fuzzy integrals and its applications[D].Tokyo:Tokyo Institute of Technology, 1974.
[24]
孙元章, 程林, 刘海涛.基于实时运行状态的电力系统运行可靠性评估[J].电网技术, 2005, 29(15):6-12.Sun Yuanzhang, Cheng Lin, Liu Haitao.Power system operational reliability evaluation based on real-time operating state[J].Power System Technology, 2005, 29(15):6-12(in Chinese).
[25]
Liu Baoding, Liu Yunkai.Expected value of fuzzy variable and fuzzy expected value models[J].IEEE Transactions on Fuzzy Systems, 2002, 10(4):445-450.
[26]
刘宝碇, 赵瑞清.随机规划与模糊规划[M].北京:清华大学出版社, 1998:37-57.Liu Baoding, Zhao Ruiqing.Stochastic programming and fuzzy programming[M].Beijing:Tsinghua University Press, 1998:37-57(in Chinese).