武新宇, 程春田, 申建建, 等.大规模水电站群短期优化调度方法(Ⅲ):多电网调峰问题[J].水利学报, 2011, 43(1):31-42.Wu Xinyu, Cheng Chuntian, Shen Jianjian, et al.Short-term optimal operation methods of large-scale hydropower plants(Ⅲ):Solution method of peak load regulation for multi power grid[J].Journal of Hydraulic Engineering, 2011, 43(1):31-42(in Chinese).
[2]
何光宇, 王稹, 裴哲义, 等.三峡电力系统调峰问题的研究[J].电网技术, 2003, 27(10):12-16.He Guangyu, Wang Zheng, Pei Zheyi, et al.Peak-load dispatching of three gorges power system[J].Power System Technology, 2003, 27(10):12-16(in Chinese).
[3]
赵洁, 刘涤尘, 雷庆生, 等.核电机组参与电网调峰及与抽水蓄能电站联合运行研究[J].中国电机工程学报, 2011, 31(7):1-6.Zhao Jie, Liu Tichen, Lei Qingsheng, et al.Analysis of nuclear power plant participating in peak load regulation of power grid and combined operation with pumped storage power plant[J].Proceedings of the CSEE, 2011, 31(7):1-6(in Chinese).
[4]
韩冬, 蔡兴国.综合环境保护及峰谷电价的水火电短期优化调度[J].电网技术, 2009, 33(14):78-83.Hang Dong, Cai Xingguo.Short-term scheduling of hydrothermal power system considering environmental protection and time-of-use price[J].Power System Technology, 2009, 33(14):78-83(in Chinese).
[5]
谭忠富, 陈广娟, 乞建勋, 等.基于电力资源优化配置的发电侧峰谷分时电价研究[J].电网技术, 2008, 32(7):61-65.Tan Zhongfu, Chen Guangjuan, Qi Jianxun, et al.Research on time-of-use price at generation side based on optimal configuration of power resources[J].Power System Technology, 2008, 32(7):61-65(in Chinese).
[6]
李红叶, 陈森林.中国可再生能源发电发展战略探讨[J].中国农村水利水电, 2011, (3):131-135.Li Hongye, Chen Senlin.Strategy on China's renewable energy development[J].China Rural Water and Hydropower, 2011, (3):131-135(in Chinese).
[7]
胡朝阳, 王亮, 郭强.华东电网大规模风电调度运行的研究[J].华东电力, 2010, 38(6):785-788.Hu Chaoyang, Wang Liang, Guo Qiang.Study on dispatching operation of large -scale wind power of east china grid[J].East China Electric Power, 2010, 38(6):785-788(in Chinese).
[8]
张宁, 周天睿, 段长刚, 等.大规模风电场接入对电力系统调峰的影响[J].电网技术, 2010, 34(1):152-158.Zhang Ning, Zhou Tianrui, Duan Changgang, et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology, 2010, 34(1):152-158(in Chinese).
[9]
Catalão J P S, Mariano S J P S, Mendes V M F, et al.Scheduling of head-sensitive cascaded hydro systems:a nonlinear approach[J].IEEE Transactions on Power System, 2009, 24(1):337-346.
[10]
Liang R H, Ke M H, Chen Y T.Coevolutionary algorithm based on lagrangian method for hydrothermal generation scheduling[J].IEEE Transactions on Power Systems, 2009, 24(2):499-507.
[11]
Ni E N, Guan X H, Li R H.Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs[J].IEEE Transactions on Power Systems, 1999, 14(3), 1127-1132.
[12]
Salem A A.hydrothermal scheduling by augmented lagrangian consideration of transmission constraints and pumped-storage units[J].IEEE Transactions on Power Systems, 2001, 16(4):750-756.
[13]
王永强, 周建中, 莫莉, 等.基于机组综合状态评价策略的大型水电站精细化日发电计划编制方法[J].电网技术, 2012, 36(7):94-99.Wang Yongqiang, Zhou Jianzhong, Mo Li, et al.Precise scheduling method for daily generation plan of large-scale hydropower station based on comprehensive state evaluation strategy for generating units[J].Power System Technology, 2012, 36(7):94-99(in Chinese).
[14]
刘静, 罗先觉.处理梯级水电站复杂约束的短期水火电系统环境经济优化调度[J].中国电机工程学报, 2012, 32(14):27-35.Liu Jing, Luo Xianjue.Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station[J].Proceedings of the CSEE, 2012, 32(14):27-35(in Chinese).
[15]
范明天, 张祖平, 杨少勇, 等.具有抽水蓄能电厂的多区域电网日经济调度研究[J].电网技术, 2000, 24(8):57-61.Fan Mingtian, Zhang Zuping, Yang Shaoyong, et al.Economic dispatch of multi-regional power network involving pump storage plants[J].Power System Technology, 2000, 24(8):57-61(in Chinese).
[16]
王现勋, 梅亚东, 段文辉, 等.抽水蓄能电站运行优化模型[J].水电自动化与大坝检测, 2008, 32(2):1-3.Wang Xianxun, Mei Yadong, Duan Wenhui, et al.Optimal operation models of pumped storage power station [J].Hydropower Automation and Dam Monitoring, 2008, 32(2):1-3(in Chinese).
[17]
刘拥军, 王亮, 王强, 等.华东电网抽水蓄能电站电能计划安排方式优化算法[J].电力系统自动化, 2009, 33(3):104-107.Liu Yongjun, Wang Liang, Wang Qiang, et al.An optimization algorithm for determining pumped storage power stations energy schedule in the East China Grid [J].Automation of Electric Power Systems, 2009, 33(3):104-107(in Chinese).
[18]
裴哲义, 伍永刚, 纪昌明, 等.跨区域水电站群优化调度初步研究[J].电力系统自动化, 2010, 34(24):23-27.Pei Zheyi, Wu Yonggang, Ji Changming, et al.Preliminary study on optimal dispatch of cross -regional hydropower station group[J].Automation of Electric Power Systems, 2010, 34(24):23-27(in Chinese).
[19]
温鹏, 万永华.联合电力系统中直调电厂子系统电力的经济分配研究[J].电力系统自动化, 1999, 23(23):41-44.Wen Peng, Wan Yonghua.Research on economic distribution of directly dispatched power systems in Interconnected power system[J].Automation of Electric Power Systems, 1999, 23(23):41-44(in Chinese).
[20]
Cheng Chuntian, Shen Jianjian, Wu Xinyu.Short-term scheduling for large-scale cascaded hydropower system with multi-vibration zones of high head[J].Journal of Water Resources Planning and Management-ASCE, 2012, 138(3):257-267.
[21]
蔡建章, 蔡华祥, 洪贵平.电力电量平衡算法研究与应用[J].云南电力技术, 1994(3):8-11.Cai Jianzhang, Cai Huaxiang, Hong Guiping.Application and study on electric power and energy balance [J].Yunnan Electric Power, 1994(3):8-11(in Chinese).