World Wind Energy Association.The world wind energy association 2011 report[R].Havana, Cuba:World Wind Energy Association, 2012.
[2]
Falaghi H, Ramezani M, Singh C, et al.Probabilistic assessment of TTC in power systems including wind power generation[J].IEEE Systems Journal, 2012, 6(1):181-190.
[3]
王成山, 王兴刚, 孙玮.含大型风电场的电力系统概率最大输电能力快速计算[J].中国电机工程学报, 2008, 28(10):56-62.Wang Chengshan, Wang Xinggang, Sun Wei.Fast calculation and analysis of probabilistic total transfer capability in power system including large-scale wind farms[J].Proceedings of the CSEE, 2008, 28(10):56-62(in Chinese).
[4]
周明, 冉瑞江, 李庚银.风电并网系统可用输电能力的评估[J].中国电机工程学报, 2010, 30(22):14-21.Zhou Ming, Ran Ruijiang, Li Gengyin.Assessment on available transfer capability of wind farm incorporated system[J].Proceedings of the CSEE, 2010, 30(22):14-21(in Chinese).
[5]
North American Electric Reliability Council.Available transfer capability definitions and determination:framework for determining available transfer capabilities of the interconnected transmission networks for a commercially viable electricity market[R].New Jersey:North American Electric Reliability Council, 1996.
[6]
Feng Xia, Meliopoulos A P S.A methodology for probabilistic simultaneous transfer capability analysis[J]. IEEE Transactions on Power Systems, 1996, 11(3):1269-1278.
[7]
崔雅莉, 别朝红, 王锡凡.输电系统可用输电能力的概率模型及计算[J].电力系统自动化, 2003, 27(14):36-40.Cui Yali, Bie Zhaohong, Wang Xifan.Study on probabilistic models and algorithms ofavailable transfer capability[J].Automation of Electric Power Systems, 2003, 27(14):36-40 (in Chinese).
[8]
Leite Da Silva A M, Costa J G C, Manso L A F, et al.Transmission capacity:availability, maximum transfer and reliability[J].IEEE Transactions on Power Systems, 2002, 17(3):843-849.
[9]
Khaburi M A, Haghifam M R.A probabilistic modeling based approach for total transfer capability enhancement using FACTS devices[J].International Journal of Electrical Power & Energy Systems, 2010, 32(1):12-16.
[10]
王成山, 王兴刚.考虑静态电压稳定约束并计及负荷和发电机出力不确定性因素的概率最大输电能力快速计算[J].中国电机工程学报, 2006, 26(16):46-51.Wang Chengshan, Wang Xinggang.Fast calculation of probabilistic total transfer capability considering static voltage stability constraints and the uncertainties of load and generator output[J].Proceedings of the CSEE, 2006, 26(16):46-51(in Chinese).
[11]
李庚银, 高亚静, 周明.可用输电能力评估的序贯蒙特卡罗仿真法[J].中国电机工程学报, 2008, 28(25):74-79.Li Gengyin, GaoYajing, Zhou Ming.Sequential Monte Carlo simulation approach for assessment of available transfer capability[J].Proceedings of the CSEE, 2008, 28(25):74-79(in Chinese).
[12]
Audomvongseree K, Yokoyama A.Consideration of an appropriate TTC by probabilistic approach[J].IEEE Transactions on Power Systems, 2004, 19(1):375-383.
[13]
Rodrigues A B, Da Silva M G.Chronological simulation for transmission reliability margin evaluation with time varying loads[J].International Journal of Electrical Power & Energy Systems, 2011, 33(4):1054-1061.
[14]
Othman M M, Musirin I.A novel approach to determine transmission reliability margin using parametric bootstrap technique[J].International Journal of Electrical Power & Energy Systems, 2011, 33(10):1666-1674.
[15]
Bin Othman M M, Mohamed A, Hussain A.Determination of transmission reliability margin using parametric bootstrap technique[J].IEEE Transactions on Power Systems, 2008, 23(4):1689-1700.
[16]
Zhang J, Dobson I, Alvarado F L.Quantifying transmission reliability margin[J].International Journal of Electrical Power & Energy Systems, 2004, 26(9):697-702.
[17]
石东源, 罗钢, 陈金富, 等.考虑方向性和风险性的大型互联电网可用输电能力快速计算[J]. 中国电机工程学报, 2012, 32(34):58-66.Shi Dongyuan, Luo Gang, Chen Jinfu, et al.Fast calculation of available transfer capability in bulk interconnected grid considering directions and risks [J].Proceedings of the CSEE, 2012, 32(34):58-66(in Chinese).
[18]
石东源, 蔡德福, 陈金富, 等.计及输入变量相关性的半不变量法概率潮流计算[J].中国电机工程学报, 2012, 32(28):104-113.Shi Dongyuan, Cai Defu, Chen Jinfu, et al.Probabilistic load flow calculation based on cumulant method considering correlation between input variables [J].Proceedings of the CSEE, 2012, 32(28):104-113(in Chinese).
[19]
Hua Wei, Sasaki H, Kubokawa J, et al.An interior point nonlinear programming for optimal power flow problems with a novel data structure[J].IEEE Transactions on Power Systems, 1998, 13(3):870-877.
[20]
Giorsetto P, Utsurogi K F.Development of a new procedure for reliability modeling of wind turbine generators[J].IEEE Transactions on Power Apparatus and Systems, 1983, PAS-102(1):134-143.
[21]
Yu H, Chung C Y, Wong K P, et al.Probabilistic load flow evaluation with hybrid Latin hypercube sampling and Cholesky decomposition[J].IEEE Transactions on Power Systems, 2009, 24(2):661-667.
[22]
李俊芳, 张步涵.基于进化算法改进拉丁超立方抽样的概率潮流计算[J].中国电机工程学报, 2011, 31(25): 90-96.Li Junfang, Zhang Buhan.Probabilistic load flow based on improved Latin hypercube sampling with evolutionary algorithm[J].Proceedings of the CSEE, 2011, 31(25):90-96(in Chinese).
[23]
于晗, 钟志勇, 黄杰波, 等.采用拉丁超立方采样的电力系统概率潮流计算方法[J].电力系统自动化, 2009, 33(21):32-35.Yu Han, Chung Chiyong, Wong Kitpo, et al.A probabilistic load flow calculation method with Latin hypercube sampling[J].Automation of Electric Power Systems, 2009, 33(21):32-35(in Chinese).
[24]
陈雁, 文劲宇, 程时杰.考虑输入变量相关性的概率潮流计算方法[J].中国电机工程学报, 2011, 31(22):80-87.Chen Yan, Wen Jinyu, Cheng Shijie.Probabilistic load flow analysis considering dependencies among input random variables[J].Proceedings of the CSEE, 2011, 31(22):80-87(in Chinese).
[25]
Bezdek J C.Pattern recognition with fuzzy objective function algorithms[M].New York:Plenum Press, 1981:43-93.
[26]
汪峰, 白晓民.基于最优潮流方法的传输容量计算研究[J].中国电机工程学报, 2002, 22(11):35-40.Wang Feng, Bai Xiaomin.OPF based transfer capability calculation[J].Proceedings of the CSEE, 2002, 22(11):35-40(in Chinese).
[27]
Greene S, Dobson I, Alvarado F L.Sensitivity of transfer capability margins with a fast formula[J].IEEE Transactions on Power Systems, 2002, 17(1):34-40.
[28]
Subcommittee P M.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems, 1979, 98(6):2047-2054.