Ibraheem, Kumar P, Kothari D, et al.Recent philosophies of automatic generation control strategies in power systems[J].IEEE Transactions on Power Systems, 2005, 20(1):346-357.
[2]
王永强.厂网协调模式下流域梯级电站群短期联合优化调度研究[D].武汉:华中科技大学, 2012.Wang Yongqiang.Research on cascade hydropower station short-term optimal operation under the coordination on power plants and power grid[D].Wuhan:Huazhong University of Science& Technology, 2012(in Chinese).
[3]
郭壮志, 吴杰康, 孔繁镍, 等.梯级水电站水库蓄能利用最大化的长期优化调度[J].中国电机工程学报, 2010, 30(1):20-30.Guo Zhuangzhi, Wu Jiekang, Kong Fannie, et al.Long-term optimization scheduling based on maximal storage energy exploitation of cascaded hydro-plant reservoirs[J].Proceedings of the CSEE, 2010, 30(1):20-30(in Chinese).
[4]
梅亚东.梯级水库优化调度的有后效性动态规划模型及应用[J].水科学进展, 2000, 1(2):194-198.Mei Yadong.Dynamic programming model without Markov in property of cascade reservoirs operation and its application[J].Advance in Water Science, 2000, 1(2):194-198(in Chinese).
[5]
唐海华, 陈森林, 赵宇.三峡梯级电站短期优化调度模型及算法[J].水电能源科学, 2008, 26(3):133-136.Tang Haihua, Chen Senlin, Zhao Yu.Model and algorithm of short-term optimal scheduling of Three Gorges cascaded hydropower stations[J].Water Rescore and Power, 2008, 26(3):133-136(in Chinese).
[6]
刘攀, 郭生练, 张文选, 等.梯级水库群联合优化调度函数研究[J].水科学进展, 2007, 18(6):816-822.Liu Pan, Guo Shenglian, Zhang Wenxuan, et al.Derivation of optimal operating rules for cascade reservoirs[J].Advance in Water Science, 2007, 18(6):816-822(in Chinese).
[7]
刘学海, 练继建, 马超, 等.基于市场竞价的梯级水电站群的实时优化运行研究[J].水利水电技术, 2005, 36(10):53-57.Liu Xuehai, Lian Jijian, Ma Chao, et al.Study on real-time optimized operation of cascade hydropower stations based on market price bidding[J].Water Resources and Hydropower Engineering, 2005, 36(10):53-57(in Chinese).
[8]
张斌.自动发电控制及一次调频控制系统[M].北京:中国电力出版社, 2004:10-60.Zhang Bin.Automatic generation control and primary frequency modulation control system[M].Beijing:China Electric Power Press, 2004:10-60(in Chinese).
[9]
伍永刚.水电厂AGC策略与技术实现[J].水电站机电技术, 2009, 32(3):55-62.Wu Yonggang.Auto generation control strategy and technique implementation of hydropower station[J].Mechanical & Electrical Technique of Hydropower Station, 2009, 32(3):55-62(in Chinese).
[10]
袁飞, 腾贤亮, 张小白, 等.调度主站AGC中水电机组振动区的动态建模与跨越方法[J].电力系统自动化, 2011, 35(1):87-91.Yuan Fei, Teng Xianliang, Zhang Xiaobai, et al.Dynamic modeling and striding methods of vibration zone for hydro-electric units in electric dispatch main station AGC[J].Automation of Electric Power Systems, 2011, 35(1):87-91(in Chinese).
[11]
张小白, 高宗和, 钱玉妹, 等.用AGC实现稳定断面越限的预防和校正控制[J].电网技术, 2005, 29(19):55-59.Zhang Xiaobai, Gao Zonghe, Qian Yumei, et al.Implementation of preventive and remedial control for tie line overload by use of automatic generation control[J].Power System Technology, 2005, 29(19):55-59(in Chinese).
[12]
夏祖治, 斯忠仁.考虑线路安全约束条件的自动发电控制和经济调度控制[J].中国电机工程学报, 1985, 5(1):1-6.Xia Zuzhi, Si Zhongren.Automatic generation and economic dispatch control with security constraints[J].Proceedings of the CSEE, 1985, 5(1):1-6(in Chinese).
[13]
刘建明, 马广文, 王黎, 等.基于物理合同的梯级水电厂日前交易电量优化分配[J].水力发电学报, 2006, 25(4):16-19.Liu Jianming, Ma Guangwen, Wang Li, et al.Day-ahead power generation scheduling of cascade hydropower plants based on contract[J].Journal of Hydroelectric Engineering, 2006, 25(4):16-19(in Chinese).
[14]
张高峰, 权先璋, 陈建国.三峡梯级水电站自动发电控制[J].水电自动化与大坝监测, 2002, 26(2):1-4.Zhang Gaofeng, Quan Xianzhang, Chen Jianguo.Application research on AGC of Three Gorges cascade hydropower station[J].Hydropower Automation and Dam Monitoring, 2002, 26(2):1-4(in Chinese).
[15]
吴正义, 张雪桂, 汪军, 等.清江梯级水电厂AGC的工程实现[J].水电自动化与大坝监测, 2002, 26(2):5-8.Wu Zhengyi, Zhang Xuegui, Wang Jun, et al.Engineer implementation of automatic generation control for the Qingjiang cascade hydropower station[J].Dam Observation and Geotechnical Tests, 2002, 26(2):5-8(in Chinese).
[16]
申建建, 武新宇, 程春田, 等.大规模水电站群短期优化调度方法II:高水头多振动区问题[J].水利学报, 2011, 42(10):1168-1176.Shen Jianjian, Wu Xinyu, Cheng Chuntian, et al.Short-term optimal operation methods of large-scale hydropower plants II:solution method for high-head generating units with multi-vibration zone[J].Journal of Hydraulic Engineering, 2011, 42(10):1168-1176(in Chinese).
[17]
李树山, 廖胜利, 李刚, 等.大规模小水电群一体化发电计划编制方法[J].中国电机工程学报, 2012, 32(13):29-35.Li Shushan, Liao Shengli, Li Gang, et al.Integrated power generation scheduling compilation method for large-scale small hydropower station group[J].Proceedings of the CSEE, 2012, 32(13):29-35(in Chinese).
[18]
李滨, 韦化, 农蔚涛, 等.基于现代内点理论的互联电网控制性能评价标准下的AGC控制策略[J].中国电机工程学报, 2008, 28(25):56-61.Li Bin, Wei Hua, Nong Weitao, et al.AGC control strategy under control performance standard for interconnected power grid based on optimization theory [J].Proceedings of the CSEE, 2008, 28(25):56-61(in Chinese).
[19]
赵旋宇, 李鹏, 汪皓, 等.新型控制性能评价方法及相应的自动发电控制模式[J].中国电机工程学报, 2010, 30(6):93-97.Zhao Xuanyu, Li Peng, Wang Hao, et al.Novel performance assessment method and corresponding AGC control model[J].Proceedings of the CSEE, 2010, 30(6):93-97(in Chinese).
[20]
余涛, 陈亮, 蔡广林.基于CPS统计信息自学习机理的AGC自适应控制[J].中国电机工程学报, 2008, 28(10):82-87.Yu Tao, Chen Liang, Cai Guanglin.CPS statistic information self-learning methodology based adaptive automatic generation control[J].Proceedings of the CSEE, 2008, 28(10):82-87(in Chinese).
[21]
贾德香, 程浩忠, 熊虎岗, 等.考虑控制性能标准的AGC机组经济补偿研究[J].中国电机工程学报, 2007, 27(31):62-66(in Chinese).Jia Dexiang, Cheng Haozhong, Xiong Hugang, et al.Financial compensation of AGC unit considering control performance standard[J].Proceedings of the CSEE, 2007, 27(31):62-66(in Chinese).
[22]
高宗和, 滕贤亮, 涂力群.互联电网AGC分层控制与CPS控制策略[J].电力系统自动化, 2004, 28(1):78-81.Gao Zonghe, Teng Xianliang, Tu Liquni.Hierarchical AGC mode and CPS control strategy for interconnected power systems[J].Automation of Electric Power Systems, 2004, 28(1):78-81(in Chinese).
[23]
王坚, 张坤, 张昆, 等.南方电网现时自动发电控制模式分析[J].南方电网技术, 2010, 4(6):40-44.Wang Jian, Zhang Kun, Zhang Kun, et al.Analysis on the existing automatic generation control mode in china southern power grid[J].Southern Power System Technology, 2010, 4(6):40-44(in Chinese).
[24]
吴红, 王玮, 黄文伟, 等.自动发电控制在贵州电网中的应用[J].电网技术, 2002, 26(1):73-75.Wu Hong, Wang Wei, Huang Wenwei, et al.Application of automatic generation control in Guizhou power system[J].Power System Technology, 2002, 26(1):73-75(in Chinese).
[25]
Khuntia S, Panda S.Simulation study for automatic generation control of a muti-area power system by ANFIS approach[J].Applied Soft Computing, 2012, 12(1):333-341.
[26]
Trudnowski D, Member S.Real-time very short-term load prediction for power-system automatic generation control[J].IEEE Transactions on Control systems Technology, 2011, 9(2):254-260.