迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
[2]
孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62.Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power systems[J].Power System Technology,2007,31(20):55-62(in Chinese).
[3]
Mello J C,Melo A G,Granville S.Simultaneous transfer capability assessment by combining interior point methods and Monte-Carol simulation[J].IEEE Trans. on Power Systems,1997,12(2):736-742.
[4]
Chou K C,Corotis R B.Simulation of hourly wind speed and array wind power[J].Solar Energy,1981,26(3):199-212.
[5]
丁明,吴义纯,张立军.风电场风速概率分布参数计算方法的研究[J].中国电机工程学报,2005,25(10):109-110.Ding Ming,Wu Yichun,Zhang Lijun.Study on the algorithm to the probabilistic distribution parameters of wind sped in wind farms[J].Proceedings of the CSEE,2005,25(10):109-110(in Chinese).
[6]
吴义纯,丁明.基于蒙特卡罗仿真的风力发电系统可靠性评价[J].电力自动化设备,2004,24(12):70-73.Wu Yichun,Ding Ming.Reliability assessment of wind power generation system based on Monte-Carlo simulation[J].Electric Power Automation Equipment,2004,24(12):70-73(in Chinese).
[7]
张步涵,邵剑,吴小珊,等.基于场景树和机会约束规划的含风电场电力系统机组组合[J].电力系统保护与控制,2013,41(1):127-135.Zhang Buhan,Shao Jian,Wu Xiaoshan,et al.Unit commitment with wind farms using scenario tree and chance-constrained programming[J].Power System Protection and Control,2013,41(1):127-135(in Chinese).
[8]
Hocaoglu F O,Gerek O N,Kurban M.The effect of Markov chain state size for synthetic wind speed generation[C]//Proceeding of the 10th International Conference on Probabilistic Methods Applied to Power Systems.Rincon:PMAPS,2008:1-4.
[9]
申洪.变速恒频风电机组并网运行模型及其应用[D].北京:中国电力科学研究院,2003.Shen Hong.Studies on integrated variable-speed constant-frequency wind turbine models and the application[D].Beijing:CEPRI, 2003(in Chinese)..
[10]
Sheng Dakai,Dai Huizhu,Chen Mozi,et al.Discussion of wind farm integration in China[C]//Transmission and Distribution Conference and Exhibition.Asia and Pacific:IEEE/PES,2005:1.
[11]
刘艳妮,王玮,王英男.电力系统潮流计算中风电场模型研究[J].华东电力,2008,36(4):58-61.Liu Yanni,Wang Wei,Wang Yingnan.Research on wind farm models for power flow calculation[J].East China Electric Power,2008,36(4):58-61(in Chinese).
[12]
王成山,许晓菲,余贻鑫,等.电力系统电压稳定域的局部可视化描述及其应用[J].中国电机工程学报,2004,24(3):1-5.Wang Chengshan,Xu Xiaofei,Yu Yixin,et al.Visualization of part of the static voltage stability region in power systems and its application[J].Proceedings of the CSEE,2004,24(3):1-5(in Chinese).
[13]
Audomvongseree K,Yokoyama A.Consideration of appropriate TTC by probabilistic approach[J].IEEE Transactions on Power Systems,2004,19(1):375-383.
[14]
吴俊玲,周双喜.并网风力发电场的最大注入功率分析[J].电网技术,2004,28(20):28-32.Wu Junling,Zhou Shuangxi.Analysis on maximum power injection of wind farm connected to power system[J].Power System Technology,2004,28(20):28-32(in Chinese).
[15]
周双喜,鲁宗相.风力发电与电力系统[M].北京:中国电力出版社,2011:69-70.Zhou Shuangxi,Lu Zongxiang.Wind power generation and power system[M].Beijing:China Electric Power Press,2011:69-70(in Chinese).
[16]
NERC.Available transfer capability definition and determination:a reference document prepared by TTC task force[R].New Jersey:North American Electric Reliability Council,1996.
[17]
郑雅楠,周明,李庚银.基于信息熵的可用输电能力枚举评估方法[J].电网技术,2011,35(11):107-113.Zheng Yanan,Zhou Ming,Li Gengyin.An information entropy based contingency enumeration approach for available transfer assessment[J].Power System Technology,2011,35(11):107-113(in Chinese).
[18]
王成山,王兴刚.考虑静态电压稳定约束并计及负荷和发电机出力不确定性因素的概率最大输电能力快速计算[J].中国电机工程学报,2006,26(16):46-51.Wang Chenshan,Wang Xinggang.Fast calculation of probabilistic total transfer capability considering static voltage stability constraints and the uncertainties of load and generator output[J].Proceedings of the CSEE,2006,26(16):46-51(in Chinese).
[19]
李国庆,陈厚合.改进粒子群优化算法的概率可用输电能力研究[J].中国电机工程学报,2006,26(24):18-23.Li Guoqing,Chen Houhe.Study of probabilistic available transfer capability by improved particle swarm optimization[J].Proceedings of the CSEE,2006,26(24):18-23(in Chinese).
[20]
周明,冉瑞江,李庚银.风电并网系统可用输电能力的评估[J].中国电机工程学报,2010,30(22):14-21.Zhou Ming,Ran Ruijiang,Li Gengyin.Assessment on available transfer capability of wind farm incorporated system[J].Proceedings of the CSEE,2010,30(22):14-21(in Chinese).
[21]
王成山,王兴刚,孙玮.含大型风电场的电力系统概率最大输电能力快速计算[J].中国电机工程学报,2008,28(10):56-62.Wang Chenshan,Wang Xingang,Sun Wei.Fast calculation and analysis of probabilistic total transfer capability in power system including large-scale wind farms[J].Proceedings of the CSEE,2008,28(10):56-62(in Chinese).
[22]
Ajjarapu V,Christy C.The continuation power flow:a tool for steady state voltage stability analysis[J].IEEE Transactions on Power Systems,1992,7(1):416-423.
[23]
Chiang H D,Flueck A J,Shah K S,et al.A practical tool for tracing power system steady-state stationary behavior due to load and generaton variation[J].IEEE Transactions on Power Systems,1995,10(2):623-634.