Thomas A.Wind power in power systems [M].Chichester:Wiley,2005:25-50.
[2]
周玮,彭昱,孙辉,等.含风电场的电力系统动态经济调度[J].中国电机工程学报,2009,29(25):13-18.Zhou Wei,Peng Yu,Sun Hui,et al.Dynamic economic dispatch in wind power integrated system[J].Proceedings of the CSEE,2009,29(25):13-18(in Chinese).
[3]
孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47(in Chinese).
[4]
Hetzer J,Yu D,Bhattarai K.An economic dispatch model incorporating wind power[J].IEEE Transactions on Power Systems,2005,20(4):2143-2145.
[5]
王忱.大规模双馈型风电场并网对电力系统影响的关键问题研究[D].北京:清华大学,2010.Wang Chen.Key issues research on impact of large-scale wind farms of DFIG type on power system[D].Beijing:Tsinghua University,2010(in Chinese).
[6]
Lee J C,Lin W M,Liao G C,et al.Quantum genetic algorithm for dynamic economic dispatch with valve-point effects and including wind power system[J]. Electric Power Systems Research,2010,33(2):189-197.
[7]
黎静华,韦化,莫东.含风电场最优潮流的Wait-and-See模型与最优渐近场景分析[J].中国电机工程学报,2012,32(22):15-24.Li Jinghua,Wei Hua,Mo Dong.Asymptotically optimal scenario analysis and wait-and-see model for optimal power flow with wind power[J].Proceedings of the CSEE,2012,32(22):15-24(in Chinese).
[8]
陈功贵,陈金福.含风电场电力系统环境经济动态调度建模与算法[J].中国电机工程学报,2013,33(10):27-35.Chen Gonggui,Chen Jinfu.Environmental/economic dynamic dispatch modeling and method for power systems integrating wind farms[J].Proceedings of the CSEE,2013,33(10):27-35(in Chinese).
[9]
Yang Xinshe,Deb S.Cuckoo search via levy flights[C]// 2009 World Congress on Nature & Biologically Inspired Computing.Coimbatore,India:IEEE,2009:210-214.
詹俊鹏,郭创新,吴青华,等.快速群搜索优化算法及其在电力系统经济调度中的应用[J].中国电机工程学报,2012,32(S1):1-6.Zhan Junpeng,Guo Chuangxin,Wu Qinghua,et al.Fast group search optimizer and its application to the economic dispatch of power systems[J].Proceedings of the CSEE,2012,32(S1):1-6(in Chinese).
[12]
袁晓辉,袁艳斌,王乘.计及阀点效应的电力系统经济运行方法[J].电工技术学报,2005,20(6):92-96.Yuan Xiaohui,Yuan Yanbin,Wang Cheng.Method for economic operation problem in power systems with valve point effect[J].Trans.of China Electrotechnical Society,2005,20(6):92-96(in Chinese).
[13]
Bowden G J,Barker P R,Shestopal V O,et al.The Weibull distribution functiosn and wind power statistics [J].Wind Engineering,1983,7(2):85-98.
[14]
Weng Zhenxing,Shi Libao,Xu Zheng.Effects of wind power variability and intermittency on power flow[C]// 2012 IEEE Power Engineering Society General Meeting.San Diego,LA,USA:2012.
[15]
Zhang N,Kang C Q,and Xu Q.Evaluating the spatial - temporal correlations of clustered wind power[C]// WeGAT,Jeju,Korea,2012,10:24-26.
[16]
Hatziagryriou N D,Karakatsanis T S,Papadopoulos M.Probabilistic load flow in distribution systems containing dispersed wind power generation[J].IEEE Transactions on Power Systems,1993,8(1):159-165.
[17]
Jensen N O.A note on wind generator interaction [R].Roskilde:RISO National Laboratory,1983:5-8.
[18]
Spera D A.Wind turbine technology:fundamental concepts of wind turbine engineering,second edition[M].New York:ASME Press,2009:398-409.
[19]
陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26.Chen Haiyan,Chen Jinfu,Duan Xianzhong.Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system [J].Automation of Electric Power Systems,2006,30(2):22-26(in Chinese).
[20]
Yang Xinshe,Deb S.Engineering optimisation by cuckoo search[J].Mathematical Modelling and Numerical Optimisation,2010,1(4):330-343.
[21]
Gaing Z L.Constrained dynamic economic dispatch solution using particle swarm optimization[C]//2004 IEEE Power Engineering Society General Meeting.Denver,Colorado,USA:2004:153-158.