程春田,武新宇,申建建,等.大规模水电站群短期优化调度方法I:总体概述[J].水利学报,2011,42(9):1017-1024.Cheng Chuntian,Wu Xinyu,Shen Jianjian,et al.Short-term optimal operation methods of large-scale hydropower plants I:General overview[J].Journal of Hydraulic Engineering,2011,42(9):1017-1024(in Chinese).
[2]
裴哲义,伍永刚,纪昌明,等.跨区域水电站群优化调度初步研究[J].电力系统自动化,2010,34(24):23-27.Pei Zheyi,Wu Yonggang,Ji Changming,et al.Preliminary study on optimal dispatch of cross regional hydropower station group[J].Automation of Electric Power Systems,2010,34(24):23-27(in Chinese).
[3]
Huang H L,Zheng Y.Present situation and future prospect of hydropower in China[J].Renewable and Sustainable Energy Reviews,2009,13(6):1652-1656.
[4]
吴杰康,郭壮志,丁国强.采用梯级水电站动态弃水策略的多目标短期优化调度[J].中国电机工程学报,2011,31(4):15-23.Wu Jiekang,Guo Zhuangzhi,Ding Guoqiang.Short term multi-objective optimization scheduling with dynamic water spillage strategy for cascade hydroelectric plants [J].Proceedings of the CSEE,2011,31(4):15-23(in Chinese).
[5]
袁晓辉,袁艳斌,权先璋,等.基于混沌进化算法的梯级水电系统短期发电计划[J].电力系统自动化,2001,25(16):34-38.Yuan Xiaohui,Yuan Yanbin,Quan Xianzhang,et al.Hybrid chaotic/evolutionary algorithm to short-term cascaded hydroelectric scheduling[J].Automation of Electric Power Systems,2001,25(16):34-38(in Chinese).
[6]
Cheng C T,Shen J J,Wu X Y.Short-Term Scheduling for Large-Scale Cascaded Hydropower System with Multi-Vibration Zones of High Head[J].Journal of Water Resources Planning and Management- ASCE,2012,138(3),257-267.
[7]
武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题[J].水利学报,2011,43(1):31-42.Wu Xinyu,Cheng Chuntian,Shen Jianjian,et al.Short-term optimal operation methods of large-scale hydropower plants Ⅲ Solution method of peak load regulation for multi power grid[J].Journal of Hydraulic Engineering,2011,42(12):31-42(in Chinese).
[8]
EL-Hawary M E,Christensen G S.Optimal economic operation of electric power systems[M].New York:Academic Press,1979:1-2.
[9]
Carpentier P L,Gendreau M,Bastin F.Long-term management of a hydroelectric multireservoir system under uncertainty using the progressive hedging algorithm [J].Water Resources Research,2013,49(5):2812-2827.
[10]
程春田,申建建,武新宇,等.大规模复杂水电优化调度系统的实用化求解策略及方法[J].水利学报,2012,43(7),785-795.Cheng Chuntian,Wu Xinyu,Shen Jianjian,et al.Practical solution strategies and methods of large-scale complex hydropower system operations[J].Journal of Hydraulic Engineering,2012,43(7),785-795(in Chinese).
[11]
Barros M T L,Tsai F T C,Yang S L,et al.Optimization of large-scale hydropower system operations[J].Journal of Water Resources Planning and Management-ASCE,2003,129(3):178-188.
[12]
Catalão J P S,Pousinho H M I,Mendes V M F,et al.Scheduling of head-sensitive cascaded hydro systems: a nonlinear approach[J].IEEE Transactions on Power Systems,2009,24(1):337-346.
[13]
Shawwash Z K,Siu T K,Russell D.The B.C. Hydro Short Term Hydro Scheduling Optimization Model[J].IEEE Transactions on Power Systems,2000,15(3):1125-1131.
[14]
王金文,范习辉,张勇传,等.大规模水电系统短期调峰电量最大模型及其求解[J].电力系统自动化,2003,27(15):29-34.Wang Jinwen,Fan Xihui,Zhang Yongchuan,et al.Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems[J].Automation of Electric Power Systems,2003,27(15):29-34(in Chinese).
[15]
唐海华,陈森林,赵宇.三峡梯级电站短期优化调度模型及算法[J]. 水电能源科学,2008,26(3):133-136.Tang Haihua,Chen Senlin,Zhaoyu.Model and algorithm of short-term optimal scheduling of three gorges cascaded hydropower stations[J].Water Resources and Power,2008,26(3):133-136(in Chinese).
[16]
吴正佳,周建中,杨俊杰,等.调峰容量效益最大的梯级电站优化调度[J].水力发电,2007,33(1):74-76.Wu Zhengjia,Zhou Jianzhong,Yang Junjie,et al.Optimal regulation for maximization of peak-energy capacity benefits in cascade hydropower stations[J].Water Power,2007,33(1):74-76(in Chinese).
[17]
何光宇,王稹,裴哲义,等.三峡电力系统调峰问题的研究[J].电网技术,2003,27(10):12-16.He Guangyu,Wang Chen,Pei Zheyi,et al.Peak-load dispatching of three gorges power system[J].Power System Technology,2003,27(10):12-16(in Chinese).
[18]
Finardi E C,Scuzziato M R.Hydro unit commitment and loading problem for day-ahead operation planning problem[J].Electrical Power and Energy Systems,2013,44(1):7-16.
[19]
Catalão J P S,Pousinho H M I,Mendes V M F.Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach [J].Energy Conversion and Management,2010,51(3):524-530.
[20]
Borghetti A,Ambrosio C D,Lodi A,et al.An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir[J].IEEE Transactions on Power Systems,2008,23(3):1115-1124.
[21]
Turgeon A.Optimal short-term hydro scheduling from the principles of progressive optimality[J].Water Resources Research,1981,17(3):481-486.
[22]
Yi J,Labadie J,Stitt S.Dynamic optimal unit commitment and loading in hydropower systems[J].Journal of Water Resources Planning and Management-ASCE,2003,129(5):388-398.
[23]
郑慧涛,梅亚东,杜亚平,等.大规模水电站群短期优化调度的并行求解[J].华中科技大学学报,2013,41(1):16-40.Zheng Huitao,Mei Yadong,Du Yaping,et al.Parallelly solving short-term optimal operation for large-scale hydropower plants[J].Journal of Huangzhong University of Science and Technology,2013,41(1):16-40(in Chinese).
[24]
李亮,黄强,肖燕,等.DPSA和大系统分解协调在梯级水电站短期优化调度中的应用研究[J].西北农林科技大学学报(自然科学版),2005,33(10):125-129.Li Liang,Huang Qiang,Xiao Yan,et al.The application research of DPSA and large-scale system decomposition- coordination for cascaded hydroelectric short-term optimal scheduling[J].Journal of Northwest Sci-Tech Univ. of Agri. and For. (Nat. Sci. Ed.),2005,33(10):125-129(in Chinese).