考虑年末预留水位的全景梯级水电跨年随机调度策略及模型

DOI: 10.13334/j.0258-8013.pcsee.2014.01.009, PP. 79-86

Keywords: 预留水位,全景,梯级水电,跨年调度,随机调度,奔德斯分解,风险偏好

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对大型梯级水电年末预留水位优化问题,提出在给定置信度条件下的来水在险值(inflowatrisk,IaR)方法,用以计算第1年可靠来水流量,并构建以发电收益最大化为目标的全景梯级水电跨年随机优化调度模型,使得年末预留水位能够适应第2年多种来水情况下的运行约束。

References

[1]  Li T,Shahidehpour M,Li Z.Risk-constrained bidding strategy with stochastic unit commitment[J].IEEE Transactions on Power Systems,2007,22(1):449-458.
[2]  丁晶,刘权授.随机水文学[M].北京:中国水利水电出版社,1997:35-60.Ding Jing,Liu Quanshou.Stochastic hydrology [M].Beijing:China Water and Power Press,1997:35-60(in Chinese).
[3]  盛骤,谢式千,潘承毅.概率论与数理统计[M].北京:高等教育出版社,2005:298-307.Sheng Zhou,Xie Shiqian,Pan Chengyi.Probability theory and mathematical statistics[M].Beijing:Higher Education Press,2005:298-307(in Chinese).
[4]  Kall P.Stochastic linear programming[M].New York:Springer,1976:48-55.
[5]  Alexandera S,Colemanb T F,Lic Y.Minimizing CVaR and VaR for a portfolio of derivatives[J].Journal of Banking & Finance,2006,30(2):583-605.
[6]  Benders J.Partitioning procedures for solving mixed- variables programming problems[J].Journal Numerische Mathematik,1962,4(1):238-252. 表A1 梯级水电站信息
[7]  施熙灿,林翔岳,梁青福.考虑保证率约束的马氏决策规划在水电站水库优化调度中的应用[J].水力发电学报,1982(2):11-21.Shi Xican,Lin Xiangyue,Liang Qingfu.Application of reliability constrained Marcovian decision programming in optimization of reservoir regulation of hydroelectric station[J].Journal of hydroelectric Engineering,1982(2):11-21(in Chinese).
[8]  吴杰康,郭壮志,丁国强.采用梯级水电站动态弃水策略的多目标短期优化调度[J].中国电机工程学报,2011,31(4):15-23.Wu Jiekang,Guo Zhuangzhi,Ding Guoqiang.Short -term multi-objective optimization scheduling with dynamic water spillage strategy for cascade hydroelectric plants [J].Proceedings of the CSEE,2011,31(4):15-23(in Chinese).
[9]  郭壮志,吴杰康,孔繁镍,等.梯级水电站水库蓄能利用最大化的长期优化调度[J].中国电机工程学报,2010,30(1):20-26.Guo Zhuangzhi,Wu Jiekang,Kong Fannie,et al.Long-term optimization scheduling based on maximal storage energy exploitation of cascaded hydro-plant reservoirs[J].Proceedings of the CSEE,2010,30(1):20-26(in Chinese).
[10]  徐鼎甲,戴国瑞.梯级水电站的长期优化调度[J].水利学报,1989(5):43-48.Xu Dingjia,Dai Guorui.Long-term optimization of cascade hydropower station[J].Journal of Hydraulic Engineering,1989(5):43-48(in Chinese).
[11]  Piantadosi J,Metcalfe A V,Howlett P G.Stochastic dynamic programming (SDP) with a conditional value-at-risk (CVaR) criterion for management of storm-water[J].Journal of Hydrology,2008,348(3/4):320-329.
[12]  原文林,曲晓宁.混沌蚁群优化算法在梯级水库发电优化调度中的应用研究[J].水力发电学报,2013,32(3):47-61.Yuan Wenlin,Qu Xiaoning.Application study on chaos ant colony optimization for operation of cascade reservoir power generation[J].Journal of Hydroelectric Engineering,2013,32(3):47-61(in Chinese).
[13]  王少波,解建仓,孔珂.自适应遗传算法在水库优化调度中的应用[J].水利学报,2006,37(4):480-485.Wang Shaobo,Xie Jiancang,Kong Ke.Application of adaptive genetic algorithm in optimization of reservoir operation[J].Journal of Hydraulic Engineering,2006,37(4):480-485(in Chinese).
[14]  张建云,陈洁云.南水北调东线工程优化调度研究[J].水科学进展,1995,6(3):198-204.Zhang Jianyun,Chen Jieyun.Study on optimum operation of the east-route south-to-north water transfer project [J].Advances in Water Science,1995,6(3):198-204(in Chinese).
[15]  谭维炎,刘健民,黄守信,等.应用随机动态规划进行水电站水库的最优调度[J].水利学报,1982(7):1-7.Tan Weiyan,Liu Jianmin,Huang Shouxin,et al.The application of stochastic dynamic programming in the optimization of the hydropower station and the reservoir[J].Journal of Hydraulic Engineering,1982(7):1-7(in Chinese).
[16]  张勇传,熊斯毅.拓溪水电站水库优化调度,优化理论在水库调度中的应用[M].湖南:湖南科学技术出版社,1985:35-55.Zhang Yongchuan,Xiong Siyi. The optimal scheduling for reservoirs of the Tuoxi hydropower station,the application of the optimal theory in the scheduling for reservoirs [M].Hunan:Hunan Science and Technology Press,1985:35-55(in Chinese).
[17]  陈雪青,陈刚,张炜,等.电力系统长、中、短期能源调度管理系统的研究[J].中国电机工程学报,1994,14(6):41-48.Chen Xueqing,Chen Gang,Zhang Wei,et al.Long,medium and short-term energy management systems of large power systems[J].Proceedings of the CSEE,1994,14(6):41-48(in Chinese).
[18]  葛晓琳,舒隽,张粒子.考虑检修计划的中长期水火电联合优化调度方法[J].中国电机工程学报,2012,32(13):36-43.Ge Xiaolin,Shu Jun,Zhang Lizi.Mid-long term optimal dispatching method of hydro-thermal power system considering scheduled maintenance[J].Proceedings of the CSEE,2012,30(13):36-43(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133