姜会飞,温德永,李楠,等.利用正弦分段法模拟气温日变化[J].气象与减灾研究,2010,33(3):61-65.Jiang Huifei,Wen Deyong,Li Nan,et al.A new simulation method for the diurnal variation of temperature——sub-sine simulation[J].Meteorology and Disaster Reduction Research,2010,33(3):61-65(in Chinese).
[2]
陈闽江.光伏发电系统的蒙特卡罗序贯仿真和可靠性分析[D].安徽:合肥工业大学,2004.Chen Minjiang.The sequential Monte-Carlo simulation and reliability in photovoltaic system[D].Anhui:Hefei University of Technology,2004(in Chinese).
[3]
Zhang P,Li W,Li S,et al.Reliability assessment of photovoltaic power systems:Review of current status and future perspectives[J].Applied Energy,2013(104):822-833.
[4]
青海太阳能光伏电站项目调查[J].太阳能,2011,21:53-55.Investigation of solar photovoltaic power plant project in Qinghai[J].Solar Energy,2011,21:53-55(in Chinese).
Park J,Liang W,Choi J,et al.A probabilistic reliability evaluation of a power system including solar/photovoltaic cell generator[C]//IEEE Power & Energy Society General Meeting.Calgary,Canada:IEEE,2009:1-6.
[7]
Dobakhshari A S,Fotuhi-Firuzabad M.A reliability model of large wind farms for power system adequacy studies [J]. IEEE Transactions on Energy Conversion,2009,24(3):792-801.
[8]
江海瑛,白晓民,马纲.并网光伏电站的发电可靠性评估[J].电网技术,2012,36(10):1-20.Jiang Haiying,Bai Xiaomin,Ma Gang.Reliability assessment of grid-integrated solar photovoltaic system [J].Power System Technology,2012,36(10):1-20(in Chinese).
[9]
方鑫,郭强,张东霞,等.考虑天气不确定性的光伏电站置信容量评估[J].电力系统自动化,2012,36(10):27-32.Fang Xin,Guo Qiang,Zhang Dongxia,et al.Capacity credit evaluation of grid-connected photovoltaic generation considering weather uncertainty [J].Automation of Electric Power Systems,2012,36(10):27-32(in Chinese).
[10]
梁双,胡学浩,张东霞,等.基于随机模型的光伏发电置信容量评估方法[J].电力系统自动化,2012,36(13):32-37.Liang Shuang,Hu Xuehao,Zhang Dongxia,et al.Probabilistic models based evaluation method for capacity credit of photovoltaic generation[J].Automation of Electric Power Systems,2012,36(13):32-37 (in Chinese).
[11]
方鑫,郭强,张东霞,等.并网光伏电站置信容量评估[J].电网技术,2012,36(9):31-35.Fang Xin,Guo Qiang,Zhang Dongxia,et al.Capacity credit evaluation of grid-connected photovoltaic generation[J].Power System Technology,2012,36(9):31-35 (in Chinese).
[12]
张轶,鲁国起,张焰,等.光伏电站并网对电网可靠性的影响[J].华东电力,2010 (5):700-706.Zhang Yi,Lu Guoqi,Zhang Yan,et al.Influence of grid connection of photovoltaic power station on power grid reliability[J].East China Electric Power,2010 (5):700-706 (in Chinese).
[13]
Duignan R,Dent C J,Mills A,et al.Capacity value of solar power[C]//Power and Energy Society General Meeting.San Diego,USA: IEEE,2012:1-6.
[14]
张宁,康重庆,陈治坪,等.基于序列运算的风电可信容量计算方法[J].中国电机工程学报,2011,31(25):1-9.Zhang Ning,Kang Chongqing,Chen Zhiping,et al.Wind power credible capacity evaluation model based on sequence operation[J].Proceedings of the CSEE,2011,31(25):1-9(in Chinese).
[15]
吕芳,江燕兴,刘莉敏,等.太阳能发电[M].北京:化学工业出版社,2009:33-35.Lü Fang,Jiang Yanxing,Liu Limin,et al.solar power generation[M].Beijing:Chemical Industry Press,2009:33-35(in Chinese).
[16]
Esram T,Chapman P L.Comparision of photovoltaic array maximum power point tracking techniques[J].IEEE Trans. on Energy Conversion,2007,22(2):439-449.