特高压拉线塔拉线的非线性静力特性及其整体简化有限元模型

DOI: 10.13334/j.0258-8013.pcsee.2015.S.032, PP. 232-240

Keywords: 特高压拉线塔,拉线,静力特性,有限元分析,等效弹性模量

Full-Text   Cite this paper   Add to My Lib

Abstract:

特高压拉线塔拉线的非线性静力分析是进行拉线塔静力特性分析的基础。首先建立特高压拉线塔拉线的静力理论分析模型,给出描述拉线对主柱弹性支撑作用的等效弹性模量公式,研究拉线的非线性静力特性。然后阐述拉线的基于双线性杆单元的整体简化模型,并提出基于多分段线性杆单元的整体简化模型。最后通过特高压拉线塔在大风工况下的算例对整体简化模型进行对比验证。研究结果表明:当拉线弦向伸长量较大时,拉线的等效弹性模量趋近于拉线材料的弹性模量,拉线弦向应力近似随伸长量线性变化;当拉线弦向缩短量较大时,随拉线弦向长度减小,拉线的等效弹性模量变化较慢且值较小;随拉线初应力增大,拉线弦向变形与弦向应力的非线性程度减弱;所提基于多分段线性杆单元的整体简化方法具有较高的精度,是进行特高压拉线塔拉线静力有限元分析的有效方法。

References

[1]  舒印彪,张文亮.特高压输电若干关键技术研究[J],中国电机工程学报,2007,27(31):1-6.Shu Yinbiao,Zhang Wenliang.Research of key technologies for UHV transmission[J].Proceedings of the CSEE,2007,27(31):1-6(in Chinese).
[2]  陈勇,万启发,古莉莉,等.关于我国特高压导线和杆塔结构的探讨[J].高电压技术,2004,30(6):38-41.Chen Yong,Wan Qifa, Gu Lili,Chen Ying,et al.Discussions on UHV conductors and tower structure in China[J].High Voltage Engineering,2004,30(6):38-41(in Chinese).
[3]  杨磊,吴彤,郝阳,等.V型拉线塔在750 kV输电线路工程中的应用[J].电力建设,2012,33(3):45-48.Yang Lei,Wu Tong,Hao Yang,et al.Application of guyed V tower in 750 kV transmission lines[J].Electric Power Construction,2012,33(3):45-48(in Chinese).
[4]  Burley E,Harvey R C.Behavior of tension structures subjected to uniformly distributed cable loadings[C]// International Conference on Tension Roof Structures.Polytechnic of Central London,1974:8-10.
[5]  Henghold W M,Russel J J.Equilibrium and natural frequencies of cable structures[J].Computers and Structures,1976,6:267-71.
[6]  Peyrot A H,Goulois A M.Analysis of flexible transmission lines[J].Structural division ASCE,1978:763-779.
[7]  Jayaraman H B,Knudson W C.A curved element for the analysis of cable structures[J].Computers and Structures,1981,14:325-33.
[8]  袁行飞,董石麟.二节点曲线索单元非线性分析[J].工程力学,1999,16(4):59-64,.Yuan Xingfei,Dong Shilin.A two- node curved cable element for nonlinear analysis[J].Engineering Mechanics,1999,16(4):59-64(in Chinese).
[9]  Gambhir M L,Batchelor B A.Finite element for 3-D pre-stressed cable nets[J].International Journal for Numerical Methods in Engineering,1997(11): 1699-1718.
[10]  Ali H M,Abdel-Ghaffar A M.Modeling the nonlinear seismic behavior of cable-stayed bridges with passive control bearings[J].Computers and Structures,1995,54(3):461-492.
[11]  唐建民,董明,钱若军.张拉结构非线性分析的五节点等参单元[J].计算力学学报,1997,14(1):108-113.Tang Jianmin, Dong Ming, Qian Ruojun.A finite element method with five-node isoparametric element for nonlinear analysis of tension structures[J].Chinese Journal of Computational Mechanics,1997,14(1):108-113(in Chinese) .
[12]  张其林,罗晓群.索结构分析中的索单元力学模型[J].特种结构,2006,23(3):93-96.Zhang Qilin,Luo Xiaoqun.Mechanical model of cable element in cable structure analysis[J].Special Structures,2006,23(3):93-96(in Chinese) .
[13]  周焕廷,郑大果,朱保兵.悬索结构计算中的索单元类型及其比较[J].结构工程师,2006,22(1):43-45.Zhou Huanting,Zheng Daguo,Zhu Baobing.Numerical models and comparison of cable elements in cable structures[J].Structural Engineers,2006,22(1):43-45(in Chinese) .
[14]  孔伟,党剑,单良,等.拉线式输电塔初始状态下预应力的分布研究[J].吉林电力,2010,38(5):19-22.Kong Wei,Dang Jian,Shan Liang,et al.Study on initial pre-stresses distribution of guyed transmission tower [J].Jilin Electric Power,2010,38(5):19-22.(in Chinese)
[15]  甘凤林,李小磊,高黔.拉线初始预应力分布对拉线杆塔受力影响的研究[J].广东电力,2010,23(9):7-10.Gan Fenglin,Li Xiaolei,Gao Qian.Influence of initial prestress distribution of guy for mechanics of guyed transmission tower[J].Guangdong Electric Power,2010,23(9):7-10(in Chinese).
[16]  王德贺,杨晓军,李小磊.拉线门型塔中大风工况下拉线初应力变化影响结果的研究[J].黑龙江电力,2012,33(6):438-440.Wang Dehe,Yang Xiaojun,Li Xiaolei.Study on the influence of strong-wind working conditions in guyed portal tower on the change of guy prestress [J].Heilongjiang Electric Power,2012,33(6):438-440(in Chinese).
[17]  郭峰,李晨,施菁华,等.直流输电线路双柱悬索拉线塔设计[J].电力建设,2012,33(5):78-81.Guo Feng,Li Chen,Shi Jinghua,et al.Design for double column suspended guyed tower in DC transmission lines[J].Electric Power Construction,2012,33(5):78-81(in Chinese).
[18]  宋文涛,王志骞,孟超,等.悬索拉线塔(塔线耦合模型)脉动风分析[J].钢结构,2012,27(6)::24-27.Song Wentao,Wang Zhiqian,Meng Chao,et al.The analysis of fluctuating wind to suspension cable guyed tower (tower line coupling model)[J].Steel Construction, 2012,27(6):24-27(in Chinese).
[19]  张凯.±800 kV特高压直流用拉线塔结构分析[D] .保定:华北电力大学,2014.Zhang Kai.Analysis of ±800 kV UHVDC guyed tower[D].Baoding:North China Electric Power University,Baoding,2014(in Chinese).
[20]  Ernst H J.Der e-modul von seilen unter beruksichtigung des durchhanges[J].Der Bauingenieur,1965,40(2):52-55.
[21]  Knudson W C.Static and dynamic analysis of cable net structures[D].California:University of Californa,Berkely,1971.
[22]  沈祖炎,高振锋,张其林.索网结构几何非线性分析的增量理论[J].同济大学学报,1996,24(4):357-362.Shen Zuyan,Gao Zhenfeng,Zhang Qilin.Ineremental theory for geometric nonlinear analysis of cable network structures[J].Journal of Tongji University,1996,24(4):357-362(in Chinese).
[23]  张殿生.电力工程高压送电线路设计手册[M].北京:中国电力出版社,2002:179-181.Zhang Diansheng.Electric power engineering design handbook for high voltage transmission line[M].Beijing:China Electric Power Press,2002:179-181(in Chinese).
[24]  王肇民.桅杆结构[M].北京:科学出版社,2001:96-97.Wang Zhaomin.Mast Structure[M].Beijing:Science Press,2001:96-97(in Chinese).
[25]  王璋奇,杨文刚,张凯,等.特高压单柱拉线塔受力特性及拉线初始预应力对其影响的研究[J].中国电机工程学报,2014,34(9):1498-1506.Wang Zhangqi,Yang Wengang,Zhang Kai,et al.Transmission line single mast guyed tower’s mechanical properties[J].Proceedings of the CSEE,2014,34(19):1498-1506(in Chinese) .
[26]  GB50790-2013 ±800 kV直流架空输电线路设计规范[S].北京:中国计划出版社,2013.GB50790-2013 Code for designing of ±800 kV DC overhead transmission line[S].Beijing:China Planning Press,2013(in Chinese) .