计及机会维修的系统状态检修决策模型

DOI: 10.13334/j.0258-8013.pcsee.2015.21.005, PP. 5418-5428

Keywords: 状态检修,机会维修,关联集,更新过程,检修风险,故障风险

Full-Text   Cite this paper   Add to My Lib

Abstract:

设备状态检修背景下,针对系统状态检修决策中未考虑设备随机故障情景的处理(机会维修),使其偏离实际的问题,在电网状态检修研究基础上,将设备随机故障情景的处理融入其中,并实时关联设备性能,建立计及机会维修的系统状态检修决策的数学模型。该模型依据系统运行中设备间的关联性,形成关联集,以关联集为单位进行检修决策,在此基础上,利用更新过程理论,给出计及机会维修时随设备检修时机变动的关联集可用度的求解方法。进一步,为有效反映设备检修与系统运行间的牵制关系,建立系统检修风险和故障风险的数学表达。最后,以系统检修风险和故障风险之和最小为目标,计及检修资源等约束,构建系统状态检修的数学模型,并通过算例对该模型的可行性和有效性进行了验证。该研究使系统状态检修理论得以进一步深入。

References

[1]  Abiri-Jahromi A,Fotuhi-Firuzabad M,Abbasi E.An efficient mixed-integer linear formulation for long-term overhead lines maintenance scheduling in power distribution systems[J].IEEE Transactions on Power Delivery,2009,24(4):2043-2053.
[2]  Heo J H,Kim M K,Park G P,et al.A reliability-centered approach to an optimal maintenance strategy in transmission systems using a genetic algorithm[J].IEEE Transactions on Power Delivery,2011,26(4):2171-2179.
[3]  李明,韩学山,王勇,等.变电站状态检修决策模型与求解[J].中国电机工程学报,2012,32(25):196-202. Li Ming,Han Xueshan,Wang Yong,et al.Decision- making model and solution of condition-based maintenance for substation[J].Proceedings of the CSEE,2012,32(25):196-202(in Chinese).
[4]  Wang H Z.A survey of maintenance policies of deteriorating systems[J].European Journal of Operational Research,2002,139(3):469-489.
[5]  Dekker R,Wildeman R,van der Duyn Schouten F A.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45(3):411-435.
[6]  Marseguerra M,Zio E,Podofillini L.Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation[J].Reliability Engineering and System Safety,2002,77(2):151-165.
[7]  吕超,于洪海,王立欣.基于人工免疫网络的断路器在线自学习故障诊断[J].中国电机工程学报,2010,29(34):128-134. Lü Chao,Yu Honghai,Wang Lixin.On-line self-learning fault diagnosis for circuit breakers based on artificial immune network[J].Proceedings of the CSEE,2010,29(34):128-134(in Chinese).
[8]  梁永亮,李可军,赵建国,等.变压器油色谱在线监测周期动态调整策略研究[J].中国电机工程学报,2014,34(9):1446-1453. Liang Yongliang,Li Kejun,Zhao Jianguo,et al.Research on the dynamic monitoring cycle adjustment strategy of transformer chromatography on-line monitoring devices[J].Proceedings of the CSEE,2014,34(9):1446-1453(in Chinese).
[9]  Camci F.System maintenance scheduling with prognostics information using genetic algorithm[J].IEEE Transactions on Reliability,2009,58(3):539-552.
[10]  李明,韩学山,杨明,等.电网状态检修概念与理论基础研究[J].中国电机工程学报,2011,31(34):43-52. Li Ming,Han Xueshan,Yang Ming,et al.Basic concept and theoretical study of condition-based maintenance for power transmission system[J].Proceedings of the CSEE,2011,31(34):43-52(in Chinese).
[11]  程志君,杨征,谭林.基于机会策略的复杂系统视情维修决策模型[J].机械工程学报,2012,48(6):168-174. Cheng Zhijun,Yang Zheng,Tan Lin.Condition-based maintenance model of deteriorating complex system based on opportunistic policy[J].Journal of Mechanical Engineering,2012,48(6):168-174(in Chinese).
[12]  Ding F F,Tian Z G.Opportunistic maintenance for wind farms considering multi-level imperfect maintenance thresholds[J].Renewable Energy,2012,45:175-182.
[13]  Horenbeek A V,Pintelon L.A dynamic predictive maintenance policy for complex multi-component systems [J].Reliability Engineering and System Safety,2013,120:39-50.
[14]  刘文颖,谢昶,文晶,等.基于小生境多目标粒子群算法的输电网检修计划优化[J].中国电机工程学报,2013,33(4):143-148. Liu Wenying,Xie Chang,Wen Jing,et al.Optimization of transmission network maintenance scheduling based on niche multi-objective particle swarm algorithm [J].Proceedings of the CSEE,2013,33(4):143-148(in Chinese).
[15]  王勇,韩学山,丁颖.计及故障切除与故障恢复的主接线可靠性分析[J].电网技术,2012,36(10):159-164. Wang Yong,Han Xueshan,Ding Ying.Reliability analysis on main connection of power plants and substations taking fault clearance and restoration into account[J].Power System Technology,2012,36(10):159-164(in Chinese).
[16]  李志兴,蔡泽祥,许志华.继电保护装置动作逻辑的数字仿真系统[J].电力系统自动化,2006,30(14):97-101. Li Zhixing,Cai Zexiang,Xu Zhihua.Digital simulation system of relay protection movement logic[J].Automation of Electric Power Systems,2006,30(14):97-101(in Chinese).
[17]  Tan C M,Raghavan N.A framework to practical predictive maintenance modeling for multi-state systems [J].Reliability Engineering and System Safety,2008,93(8):1138-1150.
[18]  何选森.随机过程[M].北京:人民邮电出版社,2009:251-272. He Xuansen.Stochastic processes[M].Beijing:Posts & Telecom Press,2009:251-272(in Chinese).
[19]  李文沅.电力系统风险评估模型、方法和应用[M].周家启,卢继平,胡小正,等,译.北京:科学出版社,2006:10-34. Li Wenyuan.Risk assessment of power systems:models,methods,and applications[M].Zhou Jiaqi,Lu Jiping,Hu Xiaozheng,Trans.Beijing:Science Press,2006:10-34(in Chinese).
[20]  汲国强,吴文传,张伯明,等.一种适用于状态检修的电力设备时变停运模型[J].中国电机工程学报,2013,33(25):139-146. Ji Guoqiang,Wu Wenchuan,Zhang Boming,et al.A time-varying component outage model for power system condition-based maintenance[J].Proceedings of the CSEE,2013,33(25):139-146(in Chinese).
[21]  Abeygunawardane S K,Jirutitijaroen P .New state diagrams for probabilistic maintenance models[J].IEEE Transactions on Power Systems,2011,26(4):2207-2213.
[22]  宁辽逸,吴文传,张伯明.运行风险评估中的变压器时变停运模型(二)基于延迟半马尔可夫过程的变压器时变停运模型[J].电力系统自动化,2010,34(16):24-28. Ning Liaoyi,Wu Wenchuan,Zhang Boming.Time- varying transformer outage model for operational risk assessment,part two:time-varying transformer outage model based on delayed semi-Markov process [J].Automation of Electric Power Systems,2010,34(16):24-28(in Chinese).
[23]  曹晋华,程侃.可靠性数学引论[M].北京:高等教育出版社,2006:257-266. Cao Jinhua,Cheng Kan.Introduction to reliability theory[M].Beijing:Higher Education Press,2006:257-266 (in Chinese).
[24]  Elsayed E A.可靠性工程[M].杨舟,译.2版.北京:电子工业出版社,2013:301-320. Elsayed E A.Reliability engineering[M].Yang Zhou,trans.2nd ed.Beijing:Electronic Industry Press,2013:301-320(in Chinese).
[25]  Yang F,Kwan C M,Chang C S.Multiobjective evolutionary optimization of substation maintenance using decision-varying Markov model[J].IEEE Transactions on Power Systems,2008,23(3):1328-1335.
[26]  Ge H F,Asgarpoor S.Reliability evaluation of equipment and substations with fuzzy Markov processes[J].IEEE Transactions on Power Systems,2010,25(3):1319-1328.
[27]  Nighot R U.Incorporating substation and switching station related outages in composite system reliability evaluation[D].Saskatoon:University of Saskatchewan,2003.