Global Wind Energy Council.Global wind report,annual market update[EB/OL].2011.http://www.gwec.net/index. php?id=190&L=0.
[2]
肖创英,汪宁渤,陟晶,等.甘肃酒泉风电出力特性分析[J].电力系统自动化,2010,34(17):64-67.Xiao Chuangying,Wang Ningbo,Zhi Jing,et al.Power characteristics of Jiuquan wind power base[J].Automation of Electric Power Systems,2010,34(17):64-67(in Chinese).
[3]
Billinton R,Chen H,Ghajar R.A sequential simulation technique for adequacy evaluation of generating systems including wind energy[J].IEEE Transactions on Energy Conversion,1996,11(4):728-734.
[4]
Billinton R,Huang D.Incorporating wind power in generating capacity reliability evaluation using different models[J]. IEEE Transactions on Power Systems,2011,26(4):2509-2517.
[5]
李有亮,高山.风电并网后大电网充裕性评估研究现状与展望[J].华东电力,2011,39(3):436-442.Li Youliang,Gao Shan.Current status and prospects on adequacy evaluation of bulk power systems with wind power integration[J].East China Electric Power,2011,39(3):436-442(in Chinese).
[6]
Karki R,Hu P,Billinton R.A simplified wind power generation model for reliability evaluation[J].IEEE Transactions on Energy Conversion,2006,21(2):533-540.
[7]
Billinton R,Karki B.Well-being analysis of wind integrated power systems[J].IEEE Transactions on Power Systems,2011,26(4):2101-2108.
[8]
陈树勇,戴慧珠,白晓民,等.风电场的发电可靠性模型及其应用[J].中国电机工程学报,2000,20(3):27-30.Chen Shuyong,Dai Huizhu,Bai Xiaomin,et al.Reliability model of wind power plants and its application[J].Proceedings of the CSEE,2000,20(3):27-30(in Chinese).
[9]
Voorspools K R,D’haeseleer W D.Critical evaluation of methods for wind-power appraisal[J].Renewable and Sustainable Energy Reviews,2007,11(1):78-97.
[10]
Haimes Y Y.Risk modeling,assessment,and management[M].New York:John Wiley & Sons,2009:327-353.
[11]
谢绍宇,王秀丽,王锡凡.电力系统的分割多目标风险分析框架及算法[J].中国电机工程学报,2011,31(34):53-60.Xie Shaoyu,Wang Xiuli,Wang Xifan.Risk assessment framework and algorithm of power systems based on the partitioned multi-objective risk method[J].Proceedings of the CSEE,2011,31(34):53-60(in Chinese).
[12]
Iowa Environmental Mesonet & Iowa State University Department of Agronomy.Wind speed data from the network of AWOS sensors [DB/OL].2011-04-01.http: //mesonet.agron.iastate.edu/request/awos/1min.php.
[13]
杨锡运,孙宝君,张新房,等.基于相似数据的支持向量机短期风速预测仿真研究[J].中国电机工程学报,2012,32(4):35-41,21.Yang Xiyun,Sun Baojun,Zhang Xinfang,et al.Short- term wind speed forecasting based on support vector machine with similar data[J].Proceedings of the CSEE,2012,32(4):35-41,21(in Chinese).
[14]
惠小英,高晓清,桂俊祥,等.酒泉风电基地高分辨率风能资源的数值模拟[J].高原气象,2011,30(2):538-544.Hui Xiaoying,GaoXiaoqing,Gui Junxiang,et al.Numerical simulation of high resolution wind power resource in Jiuquan wind power base area[J].Plateau Meteorology,2011,30(2):538-544(in Chinese).
[15]
张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31.Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Peak-load regulating adequacy evaluation associated with large- scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[16]
姜文,严正,杨建林.基于解析法的风电场可靠性模型[J].电力自动化设备,2010,30(10):79-83.Jiang Wen,Yan Zheng,Yang Jianlin.Wind farm reliability model based on analytical method[J].Electric Power Automation Equipment,2010,30(10):79-83(in Chinese).
[17]
Billinton R,Chen H,Ghajar R.Time-series models for reliability evaluation of power systems including wind energy[J].Microelectronics Reliability,1996,36(9):1253-1261.
[18]
丁明,张立军,吴义纯.基于时间序列分析的风电场风速预测模型[J].电力自动化设备,2005,25(8):32-34.Ding Ming,Zhang Lijun,Wu Yichun.Wind speed forecast model for wind farms based on time series analysis [J].Electric Power Automation Equipment,2005,25(8):32-34(in Chinese).
[19]
肖枝洪,郭明月.时间序列分析与SAS应用[M].武汉:武汉大学出版社,2009:1-168.Xiao Zhihong,Guo Yueming.Time series analysis and its application in SAS[M].Wuhan:Wuhan Univerisity Press,2009:1-168(in Chinese).
[20]
Billinton R,Li Wenyuan.Reliability assessment of electric power systems using Monte Carlo methods[M].New York:Plenum Press,1994:75-99,224-232.
[21]
Li Wenyuan.Risk assessment of power systems:models,methods and applications[M].New York:John Wiley and Sons,Inc,2004:75-83.
[22]
Wangdee W,Billinton R.Bulk electric system well-being analysis using sequential Monte Carlo simulation [J].IEEE Transactions on Power Systems,2006,21(1):188-193.
[23]
Subcommittee Reliability Test System Task Force of the Application of Probability Methods.The IEEE reliability test system-1996 :a report prepared by the reliability test system task force of the application of probability methods subcommittee[J].IEEE Transactions on Power Systems,1999,14(3):1010-1020.
[24]
McLean J R.WP2.6-Equivalent wind power curves[R/OL] 2008.http://www.trade-wind.eu/index.php.