Perninge M,Knazkins V,Mikael A,et al.Risk estimation of critical time to voltage instability induced by saddle-node bifurcation[J].IEEE Trans. on Power Systems,2010,25(3):1600-1610.
[2]
Grijalva S.Individual branch and path necessary conditions for saddle node bifurcation voltage collapse [J].IEEE Trans. on Power Systems,2012,27(1):12-19.
[3]
Venkatasubramanian V,Schattler H,Zaborszky J.Dynamic of large constrained nonlinear systems-a taxonomy theory[J].Proceedings of the IEEE,1995,83(1):1530-1561.
[4]
Jiang X,Venkatasubramanian V,Schattler H.Hardlimit related stability phenomena in the power system[C]// Proceedings of IEEE Control Applications Conference.Albany,America:IEEE,1995:63-72.
[5]
Kataoka Y,Shinoda Y.Voltage stability limit of electric power system with generator reactive power constraints considered[J].IEEE Trans. on Power Systems,2005,20(2):951-962.
[6]
Avalos R J,Canizares C A,Milano F,et al.Eguivalency of continuation and optimization methods to determine saddle-node and limit induced bifurcations in power systems[J].IEEE Trans. on Circuits and Systems,2009,56(1):210-223.
[7]
赵晋泉,孙晓明,龚成明,等.含FACTS元件的电力系统电压稳定评估[J].电力系统自动化,2011,35(16):21-25.Zhao Jinquan,Sun Xiaoming,Gong Chengming,et al.Voltage stability assessment of a hybrid power system with facts devices[J].Automation of Electric Power Systems,2011,35(16):21-25(in Chinese).
[8]
Hiskens I A,Chakrabarti B B.Direct calculation of reactive power limit points[J].Electrical PowerEnergy Systems,1996,18(2):121-129.
[9]
李华强,刘亚梅,Yorino N.鞍结分岔与极限诱导分岔的电压稳定性评估[J].中国电机工程学报,2005,25(24):56-60.Li Huaqiang,Liu Yamei,Yorino N.Voltage stability assessment for saddle node bifurcation and limit induced bifurcation[J].Proceedings of the CSEE,2005,25(24):56-60(in Chinese).
[10]
谢小荣,崔文进,唐义良,等.STATCOM控制器与常规PID励磁调节器的分散协调设计[J].电工技术学报,2001,16(3):24-28.Xie Xiaorong,Cui Wenjin,Tang Yiliang,et al.Coordinated designing of decentralized STATCOM controller and PID-type generator AVR[J].Transactions of China Electrotechnical Society,2001,16(3):24-28(in Chinese).
[11]
熊宁,程浩忠,马则良,等.基于连续潮流的极限诱导分岔检测方法[J].电力系统自动化,2008,32(18):35-38.Xiong Ning,Cheng Haozhong,Ma Zeliang,et al.A method for detecting limit induced bifurcation based on continuation power flow[J].Automation of Electric Power Systems,2008,32(18):35-38(in Chinese).
[12]
马兆兴,万秋兰,李洪美.考虑极限诱导分岔的电压稳定研究[J].电力系统保护与控制,2011,39(20):24-29.Ma Zhaoxing,Wan Qiulan,Li Hongmei.Research on voltage stability analysis of limit induced bifurcation [J].Power System Protection and Control,2011,39(20):24-29(in Chinese).
[13]
赵兴勇,张秀彬,苏小林.电力系统电压稳定性研究与分岔理论[J].电工技术学报,2008,23(2):87-95.Zhao Xingyong,Zhang Xiubin,Su Xiaolin.Voltage stability studies and bifurcation theory in power systems [J].Transactions of China Electrotechnical Society,2008,23(2):87-95(in Chinese).
[14]
李林川,刘娜,顾丽梅.考虑静态电压稳定裕度的配电系统无功补偿优化配置[J].电工技术学报,2008,23(4):119-124.Li Linchuan,Liu Na,Gu Limei.Optimal reactive power planning of radial distribution system with considerration of static voltage stability margin[J].Transactions of China Electrotechnical Society,2008,23(4):119-124(in Chinese).
[15]
Nemat-Talebi,Mostafa Shafiee,Bala Subramainam,et al.Limit induced bifurcation due to series connected facts devices during voltage collapse phenomena[C]// Proceedings of International Industrial and Information Systems Conference.Peradeniya,Sri Lanka:IEEE,2006:36-39.
[16]
陈焯荣,黎稳.迭代矩阵谱半径的上界估计[J].数学物理学报,2001,21A(1):8-13.Chen Zhuorong,Li Wen.Estimates of upper bounds of the spectral radius for some iteration matrix[J].Acta Mathematica Scientia,2001,21A(1):8-13(in Chinese).
[17]
路永洁,宋岱才,刘晶.迭代矩阵谱半径的界限[J].山东大学学报,2008,38(4):123-126.Lu Yongjie,Song Daicai,Liu Jing.Bounds for sprctral radius of iterative matrices[J].Journal of Shandong University,2008,38(4):123-126(in Chinese).
[18]
陈磊,闵勇.发电机无功极限诱导分岔的机理分析及预防策略[J].中国电机工程学报,2008,28(10):14-19.Chen Lei,Min Yong.Mechanism analysis and preventive measures investigation of generator reactive power limit induced bifurcation[J].Proceedings of the CSEE,2008,28(10):14-19(in Chinese).