赵登福,刘昱,夏道止.考虑开关动作次数约束的配电网无功电压控制方法的研究[J].西安交通大学学报,2003,37(8):783-786.Zhao Dengfu,Liu Yu,Xia Daozhi.Reactive power/voltage control of distribution system considering the constraint of the maximum allowable number of switching operations[J].Journal of Xi#x02019;an Jiaotong University,2003,37(8):783-786(in Chinese).
[2]
何禹清,彭建春,文明,等.基于改进遗传算法的配电网动态无功优化[J]. 湖南大学学报:自然科学版,2010,37(3):38-43.He Yuqing,Peng Jianchun,Wen Ming,et al.Dynamic reactive power optimization method for distribution network based on improved genetic algorithm[J].Journal of Hunnan University:Natural Sciences,2010,37(3):38-43(in Chinese).
[3]
刘明波,朱春明,钱康龄,等.计及控制设备动作次数约束的动态无功优化算法[J].中国电机工程学报,2004,24(3):34-40.Liu Mingbo,Zhu Chunming,Qian Kangling,et al.Dynamic reactive-power optimization algorithm incorporating action number constraints of control devices[J].Proceedings of the CSEE,2004,24(3):34-40(in Chinese).
[4]
Baran M E,Wu F F.Network reconfiguration in distribution systems for loss reduction and load balancing [J].IEEE Transactions on Power Delivery,1989,4(4):1401-1407. 本文算例所用原始数据如下。 表A1 单位火电废气排放量及其费用
[5]
陈海焱,段献忠,陈金富.分布式发电对配网静态电压稳定性的影响[J].电网技术,2006,30(19):27-30.Chen Haiyan,Duan Xianzhong,Chen Jinfu.Impacts of distributed generation on steady state voltage stability of distribution system[J]. Power System Technology,2006,30(19):27-30(in Chinese).
[6]
Hadjsaid N,Canard J,Dumas F.Dispersed generation impact on distribution networks[J].IEEE Computer Applications in Power,1999,12(2):22-28.
[7]
裴玮,盛鹍,孔力,等.分布式电源对配网供电电压质量的影响与改善[J].中国电机工程学报,2008,28(13):152-157.Pei Wei,Sheng Kun,Kong Li,et al.Impact and improvement of distributed generation on distribution network voltage quality[J].Proceedings of the CSEE,2008,28(13):152-157(in Chinese).
[8]
Kashem M A,Le A D T,Negnevitsky M,et al. Distributed generation for minimization of power losses in distribution systems[C]//IEEE Power Engineering Society General Meeting.Montreal,Canada:IEEE,2006:1-8.
[9]
El-Khattam W,Bhattacharya K,Hegazy Y,et al.Optimal investment planning for distributed generation in a competitive electricity market[J].IEEE Transactions on Power Systems,2004,19(3):1674-1684.
[10]
张节潭,程浩忠,姚良忠,等.分布式风电源选址定容规划研究[J].中国电机工程学报,2009,29(16):1-7.Zhang Jietan,Cheng Haozhong,Yao Liangzhong,et al.Study on siting and sizing of distributed wind generation[J].Proceedings of the CSEE,2009,29(16):1-7(in Chinese).
[11]
郑漳华,艾芊,顾承红,等.考虑环境因素的分布式发电多目标优化配置[J].中国电机工程学报,2009,29(13):23-28.Zheng Zhanghua,Ai Qian,Gu Chenghong,et al.Multi- objective allocation of distributed generation considering environmental factor[J].Proceedings of the CSEE,2009,29(13):23-28(in Chinese).
[12]
唐勇俊,刘东,阮前途,等.计及节能调度的分布式电源优化配置及其并行计算[J].电力系统自动化,2008,32(7):92-96.Tang Yongjun,Liu Dong,Ruan Qiantu,et al.Optimal allocation of distributed generation and its parallel computation considering energy-saving dispatching [J].Automation of Electric Power Systems,2008,32(7):92-96(in Chinese).
[13]
万仲平,肖昌育,王先甲,等.不确定市场下的一种二层规划最优竞价模型[J].电力系统自动化,2004,28(19):12-16.Wan Zhongping,Xiao Changyu,Wang Xianjia,et al.Bilevel programming model of optimal bidding strategies under the uncertain electricity mardets [J].Automation of Electric Power Systems,2004,28(19):12-16(in Chinese).
[14]
Abouzahr I,Ramakumar R.An approach to assess the performance of utility-interactive wind electric conversion systems[J].IEEE Trans. on Energy Conversion,1991,6(4):627-638.
[15]
Karaki S H,Chedid R B,Ramadan R.Probabilistic performance assessment of autonomous solar-wind energy conversion systems[J].IEEE Trans. on Energy Conversion,1999,14(3):766-772.
[16]
Feijoo A E,Cidras J.Modeling of wind farms in the load flow analysis[J].IEEE Trans. on Power Systems,2000,15(1):110-115.
[17]
王成山,郑海峰,谢莹华,等.计及分布式发电的配电系统随机潮流计算[J].电力系统自动化,2005,29(14):39-44.Wang Chengshan,Zheng Haifeng,Xie Yinghua,et al.Probabilistic power flow containing distributed generation in distribution system[J].Automation of Electric Power Systems,2005,29(14):39-44(in Chinese).
[18]
王锡凡,王秀丽.电力系统的随机潮流分析[J].西安交通大学学报,1988,22(3):87-97.Wang Xifan,Wang Wang Xifan,Wang Xiuli.Probabilistic load flow analysis in power systems[J].Journal of Xi#x02019;an Jiaotong University,1988,22(3):87-97(in Chinese).
[19]
胡泽春,王锡凡,张显,等.考虑线路故障的随机潮流[J].中国电机工程学报,2005,25(24):26-33.Hu Zechun,Wang Xifan,Zhang Xian,et al.Probabilistic load flow method considering branch outages [J].Proceedings of the CSEE,2005,25(24):26-33(in Chinese).
[20]
胡泽春,王锡凡.考虑负荷概率分布的随机最优潮流方法[J].电力系统自动化,2007,31(16):14-18.Hu Zechun,Wang Xifan.Stochastic optimal power flow approach considering load probabilistic distributions [J].Automation of Electric Power Systems,2007,31(16):14-18(in Chinese).
[21]
Zhang P,Lee S T.Probabilistic load flow computation using the method of combined cumulants and gram- charlier expansion[J].IEEE Transactions on Power Systems,2004,19(1):676-682.