导前微分控制在风电水电协同运行中的应用

DOI: 10.13334/j.0258-8013.pcsee.2015.18.004, PP. 4591-4597

Keywords: 风电,水电,风水协同,导前微分控制

Full-Text   Cite this paper   Add to My Lib

Abstract:

风电的随机性导致大规模风电的接纳成为当前电力系统面临的重要问题。考虑到风电和水电的互补性,提出用水电厂来平抑由于风速的波动性和间歇性导致的风电场输出功率波动,通过控制水轮机实现风水协同运行的控制,使水电厂和风电场向电力系统提供的有功功率按调度计划输出。针对水轮机的特点,提出导前微分控制方案。仿真结果表明,在PID控制基础上并联导前微分控制比常规PID控制方案具有更好的控制效果。风电与水电的协同运行可平抑风电输出功率的波动性,减少对电网的冲击,有利于电网的长期稳定运行。

References

[1]  王开艳,罗先觉,吴玲,等.清洁能源优先的风-水-火电力系统联合优化调度[J].中国电机工程学报,2013,33(13):27-35.Wang Kaiyan,Luo Xianjue,Wu Ling,et a1.Optimal dispatch of wind-hydro-thermal power system with priority given to clean energy[J].Proceedings of the CSEE,2013,33(13):27-35(in Chinese).
[2]  于佳,任建文,周明.基于机会约束规划的风-蓄联合动态经济调度[J].电网技术,2013,37(008):2116-2122.Yu Jia,Ren Jianwen,Zhou Ming.A chance-constrained programming based dynamic economic dispatch of wind farm and pumped-storage power station[J].Power System Technology,2013,37(8):2116-2122(in Chinese).
[3]  李强,袁越,李振杰,等.考虑峰谷电价的风电-抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18.Li Qiang,Yuan Yue,Li Zhenjie,et a1.Research on energy shifting benefits of hybrid wind power and pumped hydro storage system considering peak-valley electricity price[J].Power System Technology,2009,33(6):13-18(in Chinese).
[4]  Miranda V,Hang P S.Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers[J].IEEE Transactions on Power Systems,2005,20(4):2143-2145.
[5]  周任军,姚龙华,童小娇,等.采用条件风险方法的含风电系统安全经济调度[J].中国电机工程学报,2012,32(1):56-63.Zhou Renjun,Yao Longhua,Tong Xiaojiao,et a1.Security economic dispatch in wind power integrated systems using a conditional risk method[J].Proceedings of the CSEE,2012,32(1):56-63(in Chinese).
[6]  张晓辉,董兴华.含风电场多目标低碳电力系统动态经济调度研究[J].电网技术,2013,37(1):24-31.Zhang Xiaohui,Dong Xinghua.Research on multi-objective scheduling for low-carbon power system with wind farms[J].Power System Technology,2013,37(1):24-31(in Chinese).
[7]  陈道君,龚庆武,张茂林,等.考虑能源环境效益的含风电场多目标优化调度[J].中国电机工程学报,2011,31(13):10-17.Chen Daojun,Gong Qingwu,Zhang Maolin,et a1.Multi-objective optimal dispatch in wind power integrated system incorporating energy-environmental efficiency[J].Proceedings of the CSEE,2011,31(13):10-17(in Chinese).
[8]  刘静,罗先觉.处理梯级水电站复杂约束的短期水火电系统环境经济优化调度[J].中国电机工程学报,2012,32(14):27-35.Liu Jing,Luo Xianjue.Short-term optimal environmental conomic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station[J].Proceedings of the CSEE,2012,32(14):27-35(in Chinese).
[9]  李茜,刘天琪,李兴源.大规模风电接入的电力系统优化调度新方法[J].电网技术,2013,37(3):733-739.Li Qian,Liu Tianqi,Li Xingyuan.A new optimized dispatch method for power grid connected with large-scale wind farms[J].Power System Technology,2013,37(3):733-739(in Chinese).
[10]  Chen Q,Littler T,Wang H,Application of PMUs to coordinate hydroelectric and wind power plant operation[C]//International Conference on Sustainable Power Generation and Supply(SUPERGEN 2012).2012:1-6.
[11]  陈麒宇,Tim Littler,王海风,等.风电水电协同运行计划的优化[J].中国电机工程学报,2014,34(34):6074-6082.Chen Qiyu,Tim Littler,Wang Haifeng,et a1.Optimal scheduling for coordinated wind and hydro power generation[J].Proceedings of the CSEE,2014,34(34):6074-6082(in Chinese).
[12]  Chen Q,Tim Littler.Large-scale wind generator cascaded tripping[C]//IEEE International Conference on Computer Science and Automation Engineering.919-923.
[13]  Chen Q,Tim Littler,Wang H.Tripping control for transient stability in coordinated hydro and wind generation[C]//IET International Conference on Renewable Power Generation Conference(RPG 2013).2013:1-4.
[14]  Chen Q,Tim Littler,Jiang W,et al.Offshore wind power impacts on the peak load regulation of power systems[C]//IEEE General Meeting PES 2014.
[15]  Liu X,Li Kang,Morrow D J,McLoone S.Principal component analysis of wide area phasor measurements for islanding detection:a geometric view[J].IEEE Transactions on Power Delivery,2014,in press.
[16]  方红庆,陈龙,李训铭.基于线性与非线性模型的水轮机调速器PID参数优化比较[J].中国电机工程学报,2010,30(5):100-106.Fang Hongqing,Chen Long,Li Xunming.Comparisons of optimal tuning hydro turbine governor PID gains based on linear and nonlinear mathematical models[J].Proceedings of the CSEE,2010,30(5):100-106(in Chinese).
[17]  田亮,邓拓宇,刘吉臻.基于风量氧量热量信号导前微分协调控制系统[J].动力工程学报,2011(10):739-744.Tian Liang,Deng Tuoyu,Liu Jizhen.A guidance differential coordinated control system based on air-oxygen heat release signals[J].Journal of Chinese Society of Power Engineering,2011(10):739-744(in Chinese).
[18]  王琪,刘鑫屏,刘吉臻.再热器减温水开环自适应高阶导前微分控制[J].华东电力,2011(11):1901-1905.Wang Qi,Liu Xinping,Liu Jizhen.Open loop self-adaptive high-order guidance differential control for reheater desuperheater water system[J].East China Electric Power,2011(11):1901-1905(in Chinese).
[19]  Brooks,Key D,Felton T.Increasing the value of wind generation through integration with hydroelectric generation[C]//IEEE Power Engineering Society General Meeting,2005:1923-1925.
[20]  桂小阳,梅生伟,刘锋,等.水轮机调速系统的非线性自适应控制[J].中国电机工程学报,2006,26(8):66-71.Gui Xiaoyang,Mei Shengwei,Liu Feng,et a1.Adaptive nonlinear control for hydraulic turbine governor[J].Proceedings of the CSEE,2006,26(8):66-71(in Chinese).
[21]  姜胜,陈启卷,蔡维由.水轮机调速器参数仿真寻优策略[J].中国电机工程学报,2008,28(3):102-106.Jiang Sheng,Chen Qijuan,Cai Weiyou.Simulation optimizing strategy for parameters of hrdro-governor[J].Proceedings of the CSEE,2008,28(3):102-106(in Chinese).
[22]  Li K,Peng J,Irwin G.A fast nonlinear model identification method[J].IEEE Transactions on Automatic Control,2005,50(8):1211-1216.
[23]  常乃超,刘锋,梅生伟,等.水轮机导叶开度的自适应非线性输出反馈控制[J].中国电机工程学报,2008,28(17):87-91.Chang Naichao,Liu Feng,Mei Shengwei,et a1.Adaptive nonlinear governor control of hydro-turbine generator sets[J].Proceedings of the CSEE,2008,28(17):87-91(in Chinese).