冯志兵,金红光.冷热电联产系统的评价准则[J].工程热物理学报,2005,26(5):725-728. Feng Zhibing,Jin Hongguang.Performance assessment of combined cooling,heating and power[J].Journal of Engineering Thermophysics,2005,26(5):725-728(in Chinese).
[2]
Hu M Q,Cho H.A probability constrained multi-objective optimization model for CCHP system operation decision support[J].Applied Energy,2014,116:230-242.
[3]
Wu J Y,Wang J L,Li S.Multi-objective optimal operation strategy study of micro-CCHP system[J].Energy,2012,48(1):472-483.
[4]
陆伟,张士杰,肖云汉.有蓄冷器的联供系统优化运行[J].中国电机工程学报,2007,27(8):49-53. Lu Wei,Zhang Shijie,Xiao Yunhan.The optimal operational planning of a cogeneration system with storage[J].Proceedings of the CSEE,2007,27(8):49-53(in Chinese).
[5]
王成山,洪博文,郭力,等.冷热电联供微网优化调度通用建模方法[J].中国电机工程学报,2013,33(31):26-33. Wang Chengshan,Hong Bowen,Guo Li,et al.A general modeling method for optimal dispatch of combined cooling,heating and power microgrid[J].Proceedings of the CSEE,2013,33(31):26-33(in Chinese).
[6]
吴雄,王秀丽,王建学,等.微网经济调度问题的混合整数规划方法[J].中国电机工程学报,2013,33(28):1-8. Wu Xiong,Wang Xiuli,Wang Jianxue,et al.Economic generation scheduling of a microgrid using mixed integer programming[J].Proceedings of the CSEE,2013,33(28):1-8(in Chinese).
[7]
殷平.冷热电三联供系统研究(2):冷热电三联供系统是否应该“以热定电”[J].暖通空调,2013,43(5):82-87. Yin Ping.Research of combined cooling heating and power systems (2):Is it needed to determine power by heating load in the system[J].HV&AC,2013,43(5):82-87(in Chinese).
[8]
廖春晖,赵加宁,王磊. 国内外热电联产性能评价指标介绍与分析[J].煤气与热力,2012,32(1):4-9. Liao Chunhui,Zhao Jianing,Wang Lei.Introduction and analysis of performance evaluating index of combined heat and power system at home and abroad[J].Gas & Heat,2012,32(1):4-9(in Chinese).
[9]
Goldstein L,Hedman B,Knowles D,et al.Gas-fired distributed energy resource technology characterizations [R].Oak Ridge:National Renewable Energy Laboratory,2003:18-20.
[10]
CHP Policy Group.New technologies for CHP applications[R].Edinburgh:Delta Energy & Environment,2006:1-5.
[11]
Jradi M,Riffat S.Tri-generation systems:Energy policies,prime movers,cooling technologies,configurations and operation strategies[J].Renewable and Sustainable Energy Reviews,2014,32:396-415.
[12]
远大集团.远大X型非电空调选型设计手册[R].长沙:远大集团,2015:1-28. Broad Group.X-type non-electric air conditioning selection and design manual[R].Changsha:Broad Group,2015:1-28(in Chinese).
[13]
大金(中国) 投资有限公司.商用空调规格参数[EB/OL].[2015-1-. http://www.daikin-china.om.cn/. Daikin China.Specification parameters of commercial air conditioning[EB/OL].[2015-1-26].http://www.daikin-china.com.cn/(in Chinese).
[14]
金红光,郑丹星,徐建中.分布式冷热电联产系统装置及应用[M].北京:中国电力出版社,2010:36-42. Jin Hongguang,Zheng Danxing,Xu Jianzhong.Distributed combined cooling,heating and power system and its application[M].Beijing:China Power Press,2010:36-42(in Chinese).
[15]
华贲.分布式供能是中国“十二五”能源战略重点[J].沈阳工程学院学报:自然科学版,2012,8(4):289-293. Hua Ben.Distributed energy system is a focal point of the twelfth five-year energy strategy in China[J].Journal of Shenyang Institute of Engineering :Natural Science,2012,8(4):289-293 (in Chinese).
[16]
金红光,林汝谋.能的综合梯级利用与燃气轮机总能系统[M].北京:中国建筑工业出版社,2008:392-408. Jin Hongguang,Lin Rumou.Integrated cascade utilization of energy and gas turbine total energy system [M].Beijing:China Architecture & Building Press,2008:392-408 (in Chinese).
[17]
Santo D B D E.An energy and exergy analysis of a high-efficiency engine trigeneration system for a hospital:A case study methodology based on annual energy demand profiles[J].Energy and Buildings,2014,76:185-198.
[18]
Arteconi A,Brandoni C,Polonara F.Distributed generation and trigeneration:Energy saving opportunities in Italian supermarket sector[J].Applied Thermal Engineering,2009,29(8-9):1735-1743.
[19]
Rosato A,Sibilio S,Scorpio M.Dynamic performance assessment of a residential building-integrated cogeneration system under different boundary conditions.Part I:Energy analysis[J].Energy Conversion and Management,2014,79:731-748.
[20]
Xu D H,Qu M.Energy,environmental,and economic evaluation of a CCHP system for a data center based on operational data[J].Energy and Buildings,2013,67:176-186.
[21]
Wang J J,Jing Y Y,Zhang C F,et al.Performance comparison of combined cooling heating and power system in different operation modes[J].Applied Energy,2011,88(12):4621-4631.
[22]
王锡,杨勇平.内燃机联产双源系统与建筑物负荷匹配及运行特性分析[J].中国电机工程学报,2014,34(2):217-224. Wang Xi,Yang Yongping.Analysis on operation characteristics of the internal combustion engine dual source system[J].Proceedings of the CSEE,2014,34(2):217-224(in Chinese).
[23]
王锡,杨勇平,宋之平,等.内燃机联产双源系统的敏感性和变工况特性[J].中国电机工程学报,2010,30(20):22-27. Wang Xi,Yang Yongping,Song Zhiping,et al.Sensitivity & part-load performances of internal combustion engine dual source system[J].Proceedings of the CSEE,2010,30(20):22-27(in Chinese).
[24]
冯志兵,金红光.冷热电联产系统节能特性分析[J].工程热物理学报,2006,27(4):541-544. Feng Zhibing,Jin Hongguang.Performance assessment of combined cooling,heating and power[J].Journal of Engineering Thermophysics,2006,27(4):541-544(in Chinese).
[25]
Fumo N,Chamra L M.Analysis of combined cooling,heating,and power systems based on source primary energy consumption[J].Applied Energy,2010,87(6):2023-2030.
[26]
Pohl E,Diarra D.A method to determine primary energy savings of CHP plants considering plant-side and demand-side characteristics[J].Applied Energy,2014,113:287-293.
[27]
蒋润花,杨晓西,杨敏林,等.冷热电联供系统运行方式性能优化分析[J].工程热物理学报,2013,34(10):1818-1822. Jiang Runhua,Yang Xiaoxi,Yang Minlin,et al.The optimal analysis of CCHP operating models' performance [J].Journal of Engineering Thermophysics,2013,34(10):1818-1822(in Chinese).
[28]
李悦敏,洪峰.燃气冷热电联产系统节能率的影响因素分析[J].安徽建筑工业学院学报:自然科学版,2012,20(2):77-80.Li Yuemin,Hong Feng.The factors study on energy saving in the gas CCHP system[J].Journal of Anhui Institute of Architecture & Industry,2012,20(2):77-80(in Chinese).
[29]
张晓晖,陈钟颀.热电冷联产系统的能耗特性[J].中国电机工程学报,2007,27(5):93-98. Zhang Xiaohui,Chen Zhongqi.Energy consumption performance of combined heat cooling and power system[J].Proceedings of the CSEE,2007,27(5):93-98(in Chinese).
[30]
冯志兵,金红光.燃气轮机冷热电联产系统与蓄能变工况特性[J].中国电机工程学报,2006,26(4):25-30.Feng Zhibing,Jin Hongguang.Part-load performance of CCHP with gas turbine and storage system [J].Proceedings of the CSEE,2006,26(4):25-30(in Chinese).