基于机会约束规划的虚拟电厂调度风险分析

DOI: 10.13334/j.0258-8013.pcsee.2015.16.004, PP. 4025-4034

Keywords: 虚拟电厂,经济调度,风险分析,机会约束规划,不确定因素,最佳置信水平

Full-Text   Cite this paper   Add to My Lib

Abstract:

机会约束规划主要用来处理含多个随机变量的复杂约束问题,由于虚拟电厂存在大量不确定因素,包括可再生能源输出功率波动、负荷预测误差、机组故障停运等,采用机会约束规划建模能够很好地描述由随机变量带来的不确定性。该文建立基于机会约束规划的虚拟电厂(virtualpowerplant,VPP)经济调度模型。该模型以最大化虚拟电厂经济效益为目标、旋转备用约束为机会约束,利用随机模拟和遗传算法结合的混合算法进行求解。针对机会约束规划处理中所伴随的失负荷风险,建立风险量化指标,讨论不同控制场景、不同置信水平及不同风险系数下VPP调度决策所面临的风险水平,探讨虚拟电厂调度过程中经济性与风险性之间的平衡关系,以期为机会约束规划中最佳置信水平的选择提供参考。

References

[1]  丁明,吴义纯,张立军.风电场风速概率分布参数计算方法的研究[J].中国电机工程学报,2005,25(10):107-110.Ding Ming,Wu Yichun,Zhang Lijun.Study on the algorithm to the probabilistic distribution parameters of wind speed in wind farms[J].Proceedings of the CSEE,2005,25(10):107-110(in Chinese).
[2]  郭康,徐玉琴,张丽,等.计及光伏电站随机出力的配电网无功优化[J].电力系统保护与控制,2012,40(10):53-58.Guo Kang,Xu Yuqin,Zhang Li,et al.Reactive power optimization of distribution network considering PV station random output[J].Power System Protection and Control,2012,10(in Chinese).
[3]  杨文佳,康重庆,夏清,等.基于预测误差分布特性统计分析的概率性短期负荷预测[J].电力系统自动化,2006,30(19):47-52.Yang Wenjia,Kang Chongqin,Xia Qing,et al.Short term probabilistic load forecasting based on statistics of probability distribution of forecasting errors [J].Automation of Electric Power Systems,2006,30(19):47-52(in Chinese).
[4]  刘小平,丁明,张颖媛,等.微网系统的动态经济调度[J].中国电机工程学报,2011,31(31):77-84.Liu Xiaoping,Ding Ming,Zhang Yingyuan,et al.Dynamic economic dispatch for microgrids[J] Proceedings of the CSEE,2011,31(31):77-84(in Chinese).
[5]  裴玮,盛鹍,孔力,等.分布式电源对配网供电电压质量的影响与改善[J].中国电机工程学报,2008,28(13):152-157.Pei Wei,Sheng Kun,Kong Li,et al.Impact and improvement of distributed generation on distribution network voltage quality[J].Proceeding of the CSEE,2008,28(13):152-157(in Chinese).
[6]  钱科军,袁越,Zhou Cheng-ke.分布式发电对配电网可靠性的影响研究[J].电网技术,2008,32(11):74-78.Qian Kejun,Yuan Yue,Zhou Cheng-ke.Study on impact of distributed generation on distribution system reliability[J].Power System Technology,200832(11):74-78(in Chinese).
[7]  鲁宗相,王彩霞,闵勇,等.微电网研究综述[J].电力系统自动化,2007,31(19):100-107.Lu Zongxiang,Wang Caixia,Min Yong.Overview on microgrid research[J].Automation of Electric Power Systems,2007,31(19):100-107(in Chinese).
[8]  李鹏,张玲,王伟,等.微网技术应用与分析[J].电力系统自动化,2009,33(20):109-115.Li Peng,Zhang Ling,Wang Wei,et al.Application and analysis of microgrid[J].Automation of Electric Power Systems,2009,33(20):109-114(in Chinese).
[9]  王成山,李鹏.分布式发电,微网与智能配电网的发展与挑战[J].电力系统自动化,2010,34(2):10-14.Wang Chengshan,Li Peng.Development and challenges of distributed generation,the micro-grid and smart distribution system[J].Automation of Electric Power Systems,2010,34(2):10-14(in Chinese).
[10]  Asmus P.Microgrids,virtual power plants and our distributed energy future[J].The Electricity Journal,2010,23(10):72-82.
[11]  Pudjianto D,Ramsay C,Strbac G.Virtual power plant and system integration of distributed energy resources[J].IET Renewable Power Generation,2007(1):10-16.
[12]  Nikonowicz Ł B,Milewski J.Virtual power plants-general review:structure,application and optimisation[J].Journal of Power Technologies,2012,92(3):135-149.
[13]  刘吉臻,李明扬,房方,等.虚拟发电厂研究综述[J].中国电机工程学报,2014,34(29):5103-5111.Liu Jizhen,Li Mingyang,Fang Fang,et al.Review on virtual power plants[J].Proceeding of the CSEE,2014,34(29):5103-5111(in Chinese).
[14]  Molderink A,Bakker V,Bosman M G C,et al.Management and control of domestic smart grid technology[J].IEEE Trans on Smart Grid,2010,1(2):109-119.
[15]  Giuntoli M,Poli D.Optimized thermal and electrical scheduling of a Large Scale Virtual Power Plant in the presence of energy storages[J].IEEE Trans on Smart Grid,2013,4(2):942-955.
[16]  Vasirani M,Kota R,Cavalcante R L G,et al.An agent- based approach to virtual power plants of wind power generators and electric vehicles[J].IEEE Trans on Smart Grid,2013,4(3):1314-1322.
[17]  Ruiz N,Cobelo I,Oyarzabal J.A direct load control model for virtual power plant management[J].IEEE Trans.on Power Systems.2009,24(2):959-966.
[18]  Pandžić H,Kuzle I,Capuder T.Virtual power plant mid-term dispatch optimization[J].Applied Energy,2013,101:134-141.
[19]  Peik-Herfeh M,Seifi H,Sheikh-El-Eslami M K.Decision making of a virtual power plant under uncertainties for bidding in a day-ahead market using point estimate method[J].International Journal of Electrical Power & Energy Systems,2013,44(1):88-98.
[20]  Yang Hongming,Yi Dexin,Zhao Junhua,et al.Distributed optimal dispatch of virtual power plant based on ELM transformation[J].Management,2014,10(4):1297-1318.
[21]  Mashhour E,Moghaddas-Tafreshi S M.Bidding strategy of virtual power plant for participating in energy and spinning reserve markets,part i:problem formulation .IEEE Trans on Power Systems,2011,26(2):949-956.
[22]  Setiawan E A.Concept and controllability of virtual power plant[M].Kassel University Press GmbH,2007.
[23]  Dimeas,A L,Hatziargyriou N D.Operation of a multiagent system for microgrid control[J].IEEE Trans. on Power Systems,2005,20(3):1447-1455.
[24]  Karki R,Hu P,Billinton R.A simplified wind power generation model for reliability evaluation[J].IEEE Trans. on Energy Conversion.2006,21(2):533-540.
[25]  Wu H,Shahidehpour M,Li Z,et al.Chance-constrained day-ahead scheduling in stochastic power system operation[J].IEEE Trans.on Power Systems,2014,29(4):1583.
[26]  王乐,余志伟,文福拴.基于机会约束规划的最优旋转备用容量确定[J].电网技术,2006,30(20):14-19.Wang Le,Yu Zhiwei,Wen Fushuan.A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity[J].Power System Technology,2006,30(20):14-19(in Chinese).
[27]  孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47 (in Chinese).
[28]  刘宝碇,赵瑞清,王纲.不确定规划及应用[M].北京:清华大学出版社,2003:79-91.Liu Baoding,Zhao Ruiqing,Wang Gang.Uncertain programming and its application[M].Beijing:Tsinghua University Press,2003:79-91(in Chinese)
[29]  艾欣,许佳佳.基于互动调度的微网与配电网协调运行模式研究[J].电力系统保护与控制,2013(1):143-149.Ai Xin,Xu Jiajia.Study on microgrid and distribution network cooperation model based on interactive scheduling[J].Power System Protection and Control,2013(1):143-149(in Chinese).
[30]  Henrion R.Introduction to chance-constrained programming[M].Tutorial Paper for the Stochastic Programming Community Home Page,2004.附录 A31 表A1 VPP内分布式电源参数

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133