Cassady C R,Kutanoglu E.Integrating preventive maintenance planning and production scheduling for a single machine[J].IEEE Trans. on Reliability,2005,54(2):304-309.
[2]
Heo J H,Kim M K,Park G P,et al.A reliability-centered approach to an optimal maintenance strategy in transmission systems using a genetic algorithm[J].IEEE Trans. on Power Delivery,2011,26(4):2171-2179.
[3]
Hadji M M,Vahidi B.A solution to the unit commitment problem using imperialistic competition algorithm[J].IEEE Trans. on Power Systems,2012,27(1):117-124.
[4]
Camci F.System maintenance scheduling with prognostics information using genetic algorithm[J].IEEE Trans. on Reliability,2009,58(3):539-552.
[5]
Nourelfath M,Fitouhi M C,Machani M.An integrated model for production and preventive maintenance planning in multi-state systems[J].IEEE Trans. on Reliability,2010,59(3):496-506.
[6]
Burke E K,Smith A J.Hybrid evolutionary techniques for the maintenance scheduling problem[J].IEEE Trans. on Power Systems,2000,15(1):122-128.
[7]
陈少华,杨澎,周永旺,等.遗传和模拟退火算法在发电机组检修计划中的应用[J].电力系统自动化,1998,22(7):44-46.Chen Shaohua,Yang Peng,Zhou Yongwang,et al.A method combining genetic algorithm with simulated annealing approach for thermal unit maintenance scheduling[J].Automation of Electric Power Systems,1998,22(7):44-46(in Chinese).
[8]
Pandzic H,Conejo A J,Kuzle I,et al.Yearly maintenance scheduling of transmission lines within a market environment[J].IEEE Trans. on Power Systems,2012,27(1):407-415.
[9]
Wu Lei,Shahidehpour M,Li Tao.GENCO's risk-based maintenance outage scheduling[J].IEEE Trans. on Power Systems,2008,23(1):127-136.
[10]
Wu Lei,Shahidehpour M,Fu Yong.Security-constrained generation and transmission outage scheduling with uncertainties[J].IEEE Trans. on Power Systems,2010,25(3):1674-1685.
[11]
Silva E L,Schilling M T,Rafael M C.Generation maintenance scheduling considering transmission constraints[J].IEEE Trans. on Power Systems,2000,15(2):838-843.
[12]
Marwali M K C,Shahidehpour S M.Integrated generation and transmission maintenance scheduling with network constraints[J].IEEE Trans. on Power Systems,1998,13(3):1063-1068.
[13]
Fu Yong,Shahidehpour M,Li Zuyi.Security-constrained unit commitment with AC constraints[J].IEEE Trans. on Power Systems,2005,20(3):1538-1550.
[14]
Fu Yong,Shahidehpour M,Li Zuyi.Security-constrained optimal coordination of generation and transmission maintenance outage scheduling[J].IEEE Trans. on Power Systems,2007,22(3):1302-1313.
[15]
Khodaei A,Shahidehpour M.Transmission switching in security-constrained unit commitment[J].IEEE Trans. on Power Systems,2010,25(4):1937-1945.
[16]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
[17]
鲍爱霞.大规模风电场容量可信度的分析及对华东电网备用的影响[J].中国电机工程学报,2009,29(增刊):34-38.Bao Aixia.Analysis and research for capacity credit of large scale wind farms and influence on reserve capacity of east China electric power grid[J].Proceedings of the CSEE,2009,29(Supplement):34-38(in Chinese).
[18]
张宏宇,印永华,申洪,等.考虑大规模风电调峰要求的系统机组检修计划[J].电力系统自动化,2012,36(16):25-30.Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Generator maintenance scheduling of large-scale wind power integration considering peak shaving[J].Automation of Electric Power Systems,2012,36(16):25-30(in Chinese).
[19]
吴耀武,邴焕帅,娄素华.含风电场的电力系统中考虑调峰压力平衡的机组检修规划模型[J].电网技术,2012,36(11):94-100.Wu Yaowu,Bing Huanshuai,Lou Suhua.A unit maintenance scheduling model considering peak regulation pressure balance for power system containing wind farms[J].Power System Technology,2012,36(11):94-100(in Chinese).
[20]
方陈,夏清,孙欣.考虑大规模风电接入的发电机组检修计划[J].电力系统自动化,2010,34(19):20-24.Fang Chen,Xia Qing,Sun Xin.Generation maintenance scheduling with significant wind power penetration[J].Automation of Electric Power Systems,2010,34(19):20-24(in Chinese).
[21]
Ben-Tal A,Ghaoui L E,Nemirovski A.Robus optimization[M].Princeton Series in Applied Mathematics.Princeton,NJ:Princeton University Press,2009.
[22]
Wu Wenchuan,Chen Jianhua,Zhang Boming,et al.A robust wind power optimization method for look-ahead dispatch[J].IEEE Transaction on Sustainable Energy,2014,5(2):507-515.
[23]
陈建华,吴文传,张伯明,等.安全性与经济性协调的鲁棒区间风电调度方法[J].中国电机工程学报,2014,34(7):1033-1040.Chen Jianhua,Wu Wenchuan,Zhang Boming,et al.A robust interval wind power dispatch method considering the tradeoff between security and economics[J].Proceedings of the CSEE,2014,34(7):1033-1040(in Chinese).
[24]
Dimitris B,Eugene L,Sun Xu Andy,et al.Adaptive robust optimization for the security constrained unit commiment problem[J].IEEE Transaction on Power Systems,2013,28(1):52-63.
[25]
Zeng Bo,Zhao Long.Solving two-stage robust optimization problems using a column-and-constraint generation method[J].Operations Research Letters,2013,41(5):457-61.
[26]
Bertsimas D,Sim M.The price of robustness[J].Operations Research,2004,52(1):35-53.
魏韡,刘锋,梅生伟.电力系统鲁棒经济调度(一)理论基础[J].电力系统自动化,2013,37(17):37-43.Wei Wei,Liu Feng,Mei Shengwei.Robust and economical scheduling methodology for power systems (Part One) theoretical foundations[J].Automation of Electric Power Systems,2013,37(17):37-43(in Chinese).
[29]
IEEE RTS Task Force of APM Subcommittee.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,PAS-98(6):2047-2054.
[30]
Doquet M.Use of a stochastic process to sample wind power curves in planning studies[C]//2007 IEEE Lausanne Power Technology,2007:663-670.