任先成,李威,薛禹胜,等.互联电网失稳模式演化现象及其影响因素分析[J].电力系统自动化,2013,37(21):9-16.Ren Xiancheng,Li Wei,Xue Yusheng,et al.Unstable modes evolution and its influencing factors analysis in interconnected power grids[J].Automation of Electric Power Systems,2013,37(21):9-16(in Chinese).
[2]
王英涛,汤涌,丁理杰,等.新型电力系统失步广域控制技术研发[J].电网技术,2013,37(7):1827-1833.Wang Yingtao,Tang Yong,Ding Lijie,et al.Research and development of new wide area out-of-step control technology for power systems[J].Power System Technology,2013,37(7):1827-1833(in Chinese).
[3]
李强,林涛,高玉喜,等.区域电网间联网试验暂态过程的仿真[J].电网技术,2010,34(3):85-90.Li Qiang,Lin Tao,Gao Yuxi,et al.Simulation of transients in interconnection test of regional power grids [J].Power System Technology,2010,34(3):85-90(in Chinese).
[4]
汤勇,易俊.印度“7•30”,“7•31”大停电事故分析及启示[J].中国电机工程学报,2012,32(25):167-174.Tang Yong,Yi Jun.Analysis and lessons of the blackout in Indian Power Grid on July 30 and 31,2012 [J].Proceedings of the CSEE,2012,32(25):167-174(in Chinese).
[5]
方勇杰.用紧急控制降低由输电断面开断引发系统崩溃的风险对印度大停电事故的思考[J].电力系统自动化,2013,37(4):1-6.Fang Yongjie.Application of emergency control to reduce risk of system collapse triggered by power transmission interface tripping:thinking on the india power blackouts [J].Automation of Electric Power Systems,2013,37(4):1-6(in Chinese).
[6]
高鹏,王建全,周文平,等.关于振荡中心的研究[J].电力系统及其自动化学报,2005,17(2):48-53.Gao Peng,Wang Jianquan,Zhou Wenping et al.A study on oscillation center[J].Proceedings of the EPSA,2005,17(2):48-53(in Chinese).
[7]
高鹏,王建全,甘德强,等.电力系统失步解列综述[J].电力系统自动化,2005,20(19):90-96.Gao Peng,Wang Jianquan,Gan Deqiang,et al.Review on power system out-of-step separation[J].Automation of Electric Power Systems,2005,20(19):90-96(in Chinese).
[8]
陈恩泽,唐飞,刘涤尘,等.振荡中心迁移下的电网失步解列策略[J].中国电机工程学报,2014,34(22):3799-3805.Chen Enze,Tang Fei,Liu Dichen,et al.Splitting strategy of power systems based on migration of oscillation center[J].Proceedings of the CSEE,2014,34(22):3799-3805(in Chinese).
[9]
侯俊贤,韩民晓,汤涌,等.机电暂态仿真中振荡中心的识别方法及应用[J].中国电机工程学报,2013,33(25):61-67.Hou Junxian,Han Minxiao,Tang Yong,et al.An oscillation center identification method and application in electro-mechanic transient simulation[J].Proceedings of the CSEE,2013,33(25):61-67(in Chinese).
[10]
张保会,张毅刚,刘海涛.基于本地量的振荡解列装置原理研究[J].中国电机工程学报,2001,21(12):67-72.Zhang Baohui,Zhang Yigang,Liu Haitao.Study on principle of power system separation device based on local electrical parameter.Proceedings of the CSEE,2001,21(12):67-72(in Chinese).
[11]
Centeno V,Phadke A G,Edris A,et al.An adaptive out-of-step relay for power system protection][J].IEEE Transactions on Power Delivery,1997,12(1):61-71.
[12]
Haner J M,Laughlin T D,Taylor C W.Experience with the R-Rdot out-of-step relay[J].IEEE Transactions on Power Delivery,1986,1(2):35-39.
[13]
Danku M A,Baldwin T L.Fast prediction of the power-swing curve across transmission lines during wide area disturbances[C]// IEEE Power Systems Conference.IEEE,2009:1-5.
[14]
Shrestha B,Gokaraju R,Sachdev M.Out-of-step protection using state-plane trajectories analysis[J].IEEE Transactions on Power Delivery,2013,28(2):1083-1093.
[15]
Brahma S M.Distance relay with out-of-step blocking function using wavelet transform[J].IEEE Transactions on Power Delivery,2007,22(3):1360-1366.
[16]
宗洪良,任祖怡,郑玉平,等.基于ucosφ的失步解列装置[J].电力系统自动化,2003,27(19):85-87.Zong Hongliang,Ren Zuyi,Zheng Yuping,et al.A out-of-step splitting device based on the changing track of the voltage of oscillation center[J].Automation of Electric Power Systems,2003,27(19):85-87(in Chinese).
[17]
董希建,赵杰,凌超,等.基于相位角原理的失步振荡解列判据机理研究[J].电力系统保护与控制,2010,38(7):10-15.Dong Xijian,Zhao Jie,Ling Chao,et al.Research on out-of-step oscillation criterion mechanism based on principle of phase angle[J].Power System Protection and Control,2010,38(7):10-15(in Chinese).
[18]
朱声石.高压电网继电保护原理与技术[M].北京:中国电力出版社,1995:268-270.Zhu Shengshi.Principles and techniques of protective relaying for HV grid[M].Beijing:China Electric Power Press,1995:268-270(in Chinese).
[19]
高鹏,王建全,周文平.视在阻抗角失步解列判据的改进[J].电力系统自动化,2004,28(24):36-41.Gao Peng,Wang Jianquan,Zhou Wenping.Improvement of the apparent impedance angle separation criterion [J].Automation of Electric Power Systems,2004,28(24):36-41(in Chinese).
[20]
高鹏,王建全,周文平,等.基于无功功率捕捉失步解列断面的理论研究[J].电力系统自动化,2005,29(5):19-24.Gao Peng,Wang Jianquan,Zhou Wenping,et al.Theoretical study on capturing the separation interface of out-of-step based on reactive power[J].Automation of Electric Power Systems,2005,29(5):19-24(in Chinese).
[21]
方勇杰.电力系统的自适应解列控制[J].电力系统自动化,2007,31(20):41-48.Fang Yongjie.Adaptive islanding control of power systems[J].Automation of Electric Power Systems,2007,31(20):41-48(in Chinese).
[22]
吴麟琳,黄少锋.基于频率特征的失步解列判据原理[J].电力自动化设备,2013,33(1):18-22.Wu Linlin,Huang Shaofeng.Out-of-step oscillation criterion based on frequency characteristics[J].Electric Power Automation Equipment,2013,33(1):18-22(in Chinese).
[23]
黄少锋,吴麟琳.基于电气量频率差异的电力系统振荡识别[J].电力系统自动化,2012,36(23):18-22.Huang Shaofeng,Wu Linlin.Power system oscillation identification based on frequency differences between electrical data[J].Automation of Electric Power Systems,2012,36(33):18-22(in Chinese).
[24]
刘源祺,刘玉田.基于调度分区的电力系统解列割集搜索算法[J].电力系统自动化,2008,32(11):20-24.Liu Yuanqi,Liu Yutian.An islanding cutset searching approach based on dispatching area[J].Automation of Electric Power Systems,2008,32(11):20-24(in Chinese).
[25]
雷晓鹏.大型互联电力系统失步解列分析与研究[D].西安:西安理工大学,2008.Lei Xiaopeng.The research and analysis on out-of-step splitting of large-scale interconnected power system [D].Xi’an:Xi’an University of Technology,2008(in Chinese).