赵洁,刘涤尘,雷庆生,等.核电机组参与电网调峰及与抽水蓄能电站联合运行研究[J].中国电机工程学报,2011,31(7):1-6. Zhao Jie,Liu Dichen,Lei Qingsheng,et al.Analysis of nuclear power plant participating in peak load regulation of power grid and combined operation with pumped storage power plant[J].Proceedings of the CSEE,2011,31(7):1-6(in Chinese).
[2]
武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法(Ⅲ):多电网调峰问题[J].水利学报,2011,43(1):31-42. Wu Xinyu,Cheng Chuntian,Shen Jianjian,et al.Short-term optimal operation methods of large-scale hydropower plants(Ⅲ):Solution method of peak load regulation for multi power grid[J].Journal of Hydraulic Engineering,2011,43(1):31-42(in Chinese).
[3]
何光宇,王稹,裴哲义,等.三峡电力系统调峰问题的研究[J].电网技术,2003,27(10):12-16. He Guangyu,Wang Chen,Pei Zheyi,et al.Peak-load dispatching of three gorges power system[J].Power System Technology,2003,27(10):12-16(in Chinese).
[4]
万永华,张祥,温鹏.水火电联合调峰方法探讨[J].水力发电学报,2001,73(2):1-9. Wan Yonghua,Zhang Xiang,Wen Peng.A research on method for united peak modulation of Hydroelectric and thermal power plants[J].Journal of Hydroelectric Engineering,2001,73(2):1-9(in Chinese).
[5]
韩冬,蔡兴国.综合环境保护及峰谷电价的水火电短期优化调度[J].电网技术,2009,33(14):78-83. Han Dong,Cai Xingguo.Short-term scheduling of hydrothermal power system considering environmental protection and time-of-use price[J].Power System Technology,2009,33(14):78-83(in Chinese).
[6]
唐海华,陈森林,赵宇.三峡梯级电站短期优化调度模型及算法[J].水电能源科学,2008,26(3):133-136. Tang Haihua,Chen Senlin,Zhao Yu.Model and algorithm of short-term optimal scheduling of three gorges cascaded hydropower stations[J].Water Resources and Power,2008,26(3):133-136(in Chinese).
[7]
刘静,罗先觉.处理梯级水电站复杂约束的短期水火电系统环境经济优化调度[J].中国电机工程学报,2012,32(14):27-35. Liu Jing,Luo Xianjue.Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station[J].Proceedings of the CSEE,2012,32(14):27-35(in Chinese).
[8]
申建建,程春田,李卫东,等.复杂时段耦合约束水电站群短期变尺度优化方法[J].中国电机工程学报,2014,34(1):87-95. Shen Jianjian,Cheng Chuntian,Li Weidong,et al.A mutative-scale optimization method for short-term operation of hydropower plants with complex temporal coupling constraints[J].Proceedings of the CSEE,2014,34(1):87-95(in Chinese).
[9]
卢恩,王一,陈雨果,等.含复杂电源结构的电网调峰优化模型[J].电力系统自动化,2013,37(20):119-126. Lu En,Wang Yi,Chen Yuguo.Optimization model for peak load regulation of power system with complex generation structure[J].Automation of Electric Power Systems,2013,37(20):119-126(in Chinese).
[10]
王现勋,梅亚东,段文辉,等.抽水蓄能电站运行优化模型[J].水电自动化与大坝检测,2008,32(2):1-3. Wang Xianxun,Mei Yadong,Duan Wenhui,et al.Optimal operation models of pumped storage power station[J].Hydropower Automation and Dam Monitoring,2008,32(2):1-3(in Chinese).
[11]
Jubril A M,Komolafe O A,Alawode K O.Solving Multi-objective economic dispatch problem via semidefinite programming[J].IEEE Trans. on Power System,2013,28(3):2056-2064.
[12]
王永强,周建中,莫莉,等.基于机组综合状态评价策略的大型水电站精细化日发电计划编制方法[J].电网技术,2012,36(7):94-99. Wang Yongqiang,Zhou Jianzhong,Mo Li,et al.Precise scheduling method for daily generation plan of large-scale hydropower station based on comprehensive state evaluation strategy for generating units[J].Power System Technology,2012,36(7):94-99(in Chinese).
[13]
Cheng Chuntian,Shen Jianjian,Wu Xinyu.Short-term scheduling for large-scale cascaded hydropower system with multi-vibration zones of high head[J].Journal of Water Resources Planning and Management-ASCE,2012,138(3):257-267.
[14]
Salam M S,Nor K M.Hydrothermal scheduling based Lagrangian relaxation approach to hydrothermal coordination[J].IEEE Transactions on Power Systems,1998,13(1):226-235.
[15]
袁晓辉,袁艳斌,张勇传,等.水火电力系统短期发电计划研究[J].华中科技大学学报:自然科学版,2006,34(4):70-72. Yuan Xiaohui,Yuan Yanbin,Zhang Yongchuan,et al.Short-term generation scheduling for hydrothermal power systems[J].Journal of Huazhong University of Science and Technology:Nature Science Edition,2006,34(4):70-72(in Chinese).
[16]
Sifuentes S W,Vargas A.Hydrothermal scheduling using benders decomposition:accelerating techniques[J].IEEE Trans. on Power Systems,2007,22(3):1351-1359.
[17]
袁晓辉,袁艳斌,张勇传.用改进遗传算法求解水火电力系统的有功负荷分配[J].电力系统自动化,2002,26(23):33-36. Yuan Xiaohui,Yuan Yanbin,Zhang Yongchuan.Active power dispatch of hydrothermal power system using refined genetic algorithms[J].Automation of Electric Power Systems,2002,26(23):33-36(in Chinese).
[18]
程春田,申建建,武新宇,等.大规模复杂水电优化调度系统的实用化求解策略及方法[J].水利学报,2012,43(7):785-795. Cheng Chuntian,Wu Xinyu,Shen Jianjian,et al.Practical solution strategies and methods of large-scale complex hydropower system operations[J].Journal of Hydraulic Engineering,2012,43(7),785-795(in Chinese).
[19]
蔡建章,蔡华祥,洪贵平.电力电量平衡算法研究与应用[J].云南电力技术,1994(3):8-11. Cai Jiangzhang,Cai Huaxiang,Hong Guiping.Study and application of the algorithm of the electric power and energy method[J].Yunnan Electric Power,1994(3):8-11(in Chinese).
[20]
廖胜利,程春田,蔡华祥,等.改进的火电调峰方式[J].电力系统自动化,2006,30(1):89-93. Liao Shengli,Cheng Chuntian,Cai Huaxiang,et al.Improved algorithm of adjusting dischange peak by thermal power plants[J].Automation of Electric Power Systems,2006,30(1):89-93(in Chinese).