刘振亚,张启平.国家电网发展模式研究[J].中国电机工程学报,2013,33(7):1-10. Liu Zhenya,Zhang Qiping.Study on the development mode of national power grid of China[J].Proceedings of the CSEE,2013,33(7):1-10(in Chinese).
[2]
张文亮,周孝信,郭剑波,等.±1 000 kV特高压直流在我国电网应用的可行性研究[J].中国电机工程学报,2007,27(28):1-7. Zhang Wenliang,Zhou Xiaoxin,Guo Jianbo,et al.Feasibility of ±1 000 kV ultra HVDC in the power grid of China[J].Proceedings of the CSEE,2007,27(28):1-7(in Chinese).
[3]
舒印彪,张文亮,周孝信,等.特高压同比电网安全性评估[J].中国电机工程学报,2007,27(34):1-6. Shu Yinbiao,Zhang Wenliang,Zhou Xiaoxin,et al.Security evaluation of UHV synchronized power grid[J].Proceedings of the CSEE,2007,27(34):1-6(in Chinese).
[4]
齐旭,曾德文,史大军,等.特高压直流输电对系统安全稳定影响研究[J].电网技术,2006,30(2):1-6. Qi Xu,Zeng Dewen,Shi Dajun,et al.Study on impacts of UHVDC transmission on power system stability [J].Power System Technology,2006,30(2):1-6(in Chinese).
[5]
王建明,孙华东,张健,等.锦屏—苏南特高压直流投运后电网的稳定特性及协调控制策略[J].电网技术,2012,36(12):66-70. Wang Jianming,Sun Huadong,Zhang Jian,et al.Stability characteristics and coordinated control strategy of interconnected grid integrated with UHVDC transmission line from Jinping to Sunan[J].Power System Technology,2012,36(12):66-70(in Chinese).
[6]
黄河,吴小辰,候君,等.2004 年南方电网直流故障安全稳定控制策略的探讨[J].广东输电与变电技术,2004(5):1-7. Huang He,Wu Xiaochen,Hou Jun,et al.Discussing the 2004 HV DC fault safety-stabilization control policies of CSG[J].Guangdong Power Transmission Technology,2004(5):1-7(in Chinese).
[7]
江木,吴文传,张伯明,等.特高压联网下AGC协调控制策略仿真[J].电力系统自动化,2010,34(14):75-78. Jiang Mu,Wu Wenchuan,Zhang Boming,et al.Simulation of an AGC coordinated control strategy for ultra-high voltage interconnected power system [J].Automation of Electric Power Systems,2010,34(14):75-78(in Chinese).
[8]
周毅,钱学东.华东电网动态区域控制误差应用分析[J].电力系统自动化,2010,34(8):106-110. Zhou Yi,Qian Xuedong.Applications analysis of dynamic ACE in east china power grid[J].Automation of Electric Power Systems,2010,34(8):106-110(in Chinese).
[9]
李雪峰.互联电力系统的AGC容量需求和控制策略研究[D].大连:大连理工大学,2010. Li Xuefeng.Research on AGC capacity requirement and control strategies of interconnected power systems [D].Dalian:Dalian University of Technology,2010(in Chinese).
[10]
Kundur P.Power system stability and control[M].New York:McGraw Hill,1994:617-623.
[11]
Cohn N.Some aspects of tie-line bias control on interconnected power system[J].Transactions of the American Institute of Electrical,Part:Power Apparatus and Systems,1957,75(2):1415-1435.
[12]
Jaleeli N,LouisVanslyek S,Ewart D N,et al.Understanding automatic generation control[J].IEEE Transactions on Power Systems,1992,7(3):1106-1122.
[13]
Gree N R K.Transformed automatic generation control [J].IEEE Transactions on Power Systems,1996,11(4):1799-1804.
[14]
张小白,高宗和,钱玉妹,等.用AGC实现稳定断面越限的预防和校正控制[J].电网技术,2005,29(19):55-59. Zhang Xiaobai,Gao Zonghe,Qian Yumei,et al.Implementation of preventive and remedial control for tie line overload by use of automatic generation contro1 [J].Power System Technology,2005,29(19):55-59(in Chinese).
[15]
Federal Energy Regulatory Commission.Open access same-time information system and standards of conduct,RM 95-9-000[R].Washington:Federal Energy Regulatory Commission,1996.
[16]
刘皓明,李卫星,倪以信,等.计及静态安全约束的跨区域双边交易最大交易量实用计算方法[J].电网技术,2003,27(9):1-5. Liu Haoming,Li Weixing,Ni Yixin,et al.A practical method for calculating maximum transaction volume of bilateral transaction in multiregional electricity market considering static security constraints[J].Power System Technology,2003,27(9):1-5(in Chinese)
[17]
Charnes A,Cooper W W.Management models and the industrial applications of linear programming [J].Management Science,1957,4(1):38-91.