张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9.Zhang Liying,Ye Tinglu,Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
[2]
徐曼,乔颖,鲁宗相.短期风电功率预测误差综合评价方法[J].电力系统自动化,2011,35(12):20-26.Xu Man,Qiao Ying,Lu Zongxiang.A comprehensive error evaluation method for short-term wind power prediction[J].Automation of Electric Power Systems,2011,35(12):20-26.
[3]
汤奕,王琦,陈宁,等.考虑预测误差分布特性的风电场集群调度方法[J].中国电机工程学报,2013,33(25):27-32.Tang Yi,Wang Qi,Chen Ning,et al.A dispatching method of active power in wind farm clusters considering probability distribution of forecasting errors [J].Proceedings of the CSEE,2013,33(25):27-32(in Chinese).
[4]
夏澍,周明,李庚银.考虑线路安全校核的含风电电力系统有功和备用协调调度[J].中国电机工程学报,2013,33(13):18-26.Xia Shu,Zhou Ming,Li Gengyin.A coordinated active power and reserve dispatch approach for wind power integrated power systems considering line security verification[J].Proceedings of the CSEE,2013,33(13):18-26(in Chinese).
[5]
艾欣,刘晓.基于可信性理论的含风电场电力系统动态经济调度[J].中国电机工程学报,2011,31(S1):12-18.Ai Xin,Liu Xiao.Dynamic economic dispatch for wind farms integrated power system based on credibility theory[J].Proceedings of the CSEE,2011,31(S1):12-18(in Chinese).
[6]
刘芳,潘毅,刘辉,等.风电功率预测误差分段指数分布模型[J].电力系统自动化,2013,37(18): 14-19.Liu Fang,Pan Yi,Liu Hui,et al.Piecewise exponential distribution model of wind power forecasting error [J].Automation of Electric Power Systems,2013, 37(18):14-19(in Chinese).
[7]
刘斌,周京阳,周海明,等.一种改进的风电功率预测误差分布模型[J].华东电力,2012,40(2):286-291.Liu Bin,Zhou Jingyang,Zhou Haiming,et al.An improved model for wind power forecast error distribution[J].East China Electric Power,2012,40(2):286-291(in Chinese).
[8]
Tewari S,Geyer C J,Mohan N.A statistical model for wind power forecast error and its application to the estimation of penalties in liberalized markets[J].IEEE Transactions on Power Systems,2011,26(4):2031-2039.
[9]
Hodge B,Milligan M.Wind power forecasting error distributions over multiple timescales[C]//Power and Energy Society General Meeting.San Diego:IEEE,2011:1-8.
[10]
Tsikalakis A G,Katsigiannis Y A,Georgilakis P S,et al.Determining and exploiting the distribution function of wind power forecasting error for the economic operation of autonomous power systems[C]//Power Engineering Society General Meeting.Montreal:IEEE,2006:1-8.
[11]
邓兆卉.收入分配公平性的偏态分布描述方法研究[D].兰州:兰州大学,2009.Deng Zhaohui.Study on fairness of income distribution based on descriptive statistics of skewed distribution [D].Lanzhou:Lanzhou University,2009(in Chinese).
[12]
Lin T I,Lee J C,Hsieh W J.Robust mixture modeling using the skew t distribution[J].Statistics and Computing,2007,17(2):81-92.
[13]
咸巍.偏正态混合时间序列模型[D].吉林:吉林大学,2010.Xian Wei.Skew normal mixture time series models [D].Jilin:Jilin University,2010(in Chinese).
[14]
周娟.MCMC应用于参数贝叶斯估计[D].武汉:湖北大学,2008.Zhou Juan.Parameter Bayesian estimation by MCMC [D].Wuhan:Hubei University,2008(in Chinese).
[15]
Richardson S.Green P J.On Bayesian analysis of mixtures with an unknown number of components [J].Journal of the Royal Statistical Society,1997,59(4):731-758.
[16]
Bernardi M,Maruotti A,Petrella L.Skew mixture models for loss distributions:A Bayesian approach [J].Mathematics and Economics,2012,51(3):617-623.
[17]
Dempster A P,Laird N M,Rubin D B.Maximum likelihood from incomplete data via the EM algorithm [J].Journal of the Royal Statistical Society,1977,39(2):1-38.
[18]
Yang X.A higher-order Levenberg-Marquardt method for nonlinear equations[J].Applied Mathematics and Computation,2013,219(22):10682-10694.
[19]
张东英,李伟花,刘燕华,等.风电场有功功率异常运行数据重构方法[J].电力系统自动化,2014,38(5):14-18.Zhang Dongying,Li Weihua,Liu Yanhua,et al.Reconstruction method of active power historical operating data for wind farm[J].Automation of Electric Power Systems,2014,38(5):14-18(in Chinese).
[20]
宋薇.大规模风电场超短期风电功率预测的误差分析与评价[D].吉林:东北电力大学,2013.Song Wei.The error analysis and evaluation of large-scale wind farm ultra-short term wind power prediction [D].Jilin:Northeast Dianli University,2013(in Chinese).