Yajvender P V,Ashwani K.Economic-emission unit commitment solution for wind integrated hybrid system [J].International Journal of Energy Sector Management,2011,5(2):287-305.
[2]
Ortega-Vazquez M A,Kirschen D S.Estimating the spinning reserve requirements in systems with significant wind power generation penetration[J].IEEE Trans. on Power Systems,2009,24(1):114-124.
[3]
BUmmels B C,Gibescu M,Pelgrum E,et al.Impacts of wind power on thermal generation unit commitment and dispatch[J].IEEE Transactions on Energy Conversion,2007,22(1):44-51.
[4]
Doherty R,O’Malley M.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Trans. on Power Systems,2005,20(2):587-595.
[5]
Wang Jianhui,Shahidehpour M,Li Zuyi.Security- constrained unit commitment with volatile wind power generation[J].IEEE Trans. on Power Systems,2008,23(3):1319-1327.
[6]
Wu Lei,Shahidehpour M,Li Tao.Stochastic security-constrained unit commitment[J].IEEE Trans. on Power Systems,2007,22(2):800-811.
[7]
Takriti S,Birge J R.A stochastic model for the unit commitment problem[J].IEEE Trans. on Power Systems,1996,11(3):1497-1508.
[8]
Barth R,Brand H,Meibom P,et al.A stochastic unit-commitment model for the evaluation of the impacts of integration of large amounts of intermittent wind power[C]//Probabilistic Methods Applied to Power Systems,Stockholm,Sweden,2006.
[9]
Tuohy A,Meibom P,Denny E,et al.Benefits of stochastic scheduling for power systems with significant installed wind power[C]//Proceedings of the 10th International Conference on Probabilistic Methods Applied to Power Systems,Rincon,2008.
[10]
Pappala V S,Erlich I,Rohrig K,et al.A Stochastic model for the optimal operation of a wind-thermal power system[J].IEEE Trans. on Power Systems,2009,24(2):940-950.
[11]
Ruiz P A,Philbrick C R,Zak E,et al.Uncertainty management in the unit commitment problem[J].IEEE Trans. on Power Systems,2009,24(2):642-651.
[12]
吴小珊,张步涵,袁小明,等.求解含风电场的电力系统机组组合问题的改进量子离散粒子群优化方法[J].中国电机工程学报,2013,33(4):45-52. Wu Xiaoshan,Zhang Buhan,Yuan Xiaoming,et al.Solutions to unit commitment problems in power systems with wind farms using advanced quantum-inspired binary PSO[J].Proceedings of the CSEE,2013,33(4):45-52(in Chinese).
[13]
Yang Wang,Qing Xia,Chongqing Kang.Unit commitment with volatile node injections by using interval optimization[J].IEEE Trans. on Power Systems,2011,26(3):1705-1713.
[14]
白杨,汪洋,夏清,等.水-火-风协调优化的全景安全约束经济调度[J].中国电机工程学报,2013,33(13):2-9. Bai Yang,Wang Yang,Xia Qing,et al.A full-scenario SCED with coordinative optimization of hydro-thermal- wind power[J].Proceedings of the CSEE,2013,33(13):2-9(in Chinese).
[15]
周任军,姚龙华,童小娇,等.采用条件风险方法的含风电系统安全经济调度[J].中国电机工程学报,2012,32(1):56-63+18. Zhou Renjun,Yao Longhua,Tong Xiaojiao,et al.Security economic dispatch in wind power integrated systems using a conditional risk method[J].Proceedings of the CSEE,2012,32(1):56-63+18(in Chinese).
[16]
Jiang Ruiwei,Wang Jianhui,Guan Yongpei,Robust unit commitment with wind power and pumped storage hydro[J].IEEE Trans. on Power Systems,2012,27(2):800-810.
[17]
徐帆,刘军,张涛,等.考虑抽水蓄能机组的机组组合模型及求解[J].电力系统自动化,2012,36(12):36-40. Xu Fan,Liu Jun,Zhang Tao,et al.Unit commitment problem with pumped-storage units[J].Automation of Electric Power Systems,2012,36(12):36-40(in Chinese).
[18]
刘芳,潘毅,刘辉,等.风电功率预测误差分段指数分布模型[J].电力系统自动化,2013,37(18):14-19. Liu Fang,Pan Yi,Liu Hui,et al.Research on Piecewise Exponential distribution model of wind power forecasting error[J].Automation of Electric Power Systems,2013,37(18):14-19(in Chinese).
[19]
Albadi M H,El-Saadany E F.Comparative study on impacts of wind profiles on thermal units scheduling costs[J].Renewable Power Generation,IET,2011,5(1):26-35.
[20]
Bludszuweit H,Dominguez-Navarro J A,Llombart A.Statistical analysis of wind power forecast error[J].IEEE Trans. on Power Systems,2008,23(3):983-991.
[21]
Tewari S,Geyer C J,Mohan N.A Statistical model for wind power forecast error and its application to the estimation of penalties in liberalized markets[J].IEEE Trans. on Power Systems,2011,26(4):2031-2039.
[22]
Hodge B,Milligan M.Wind power forecasting error distributions over multiple timescales[C]//Power and Energy Society General Meeting,San Diego,CA, 2011 IEEE.
[23]
周松林,茆美琴,苏建徽.风电功率短期预测及非参数区间估计[J].中国电机工程学报,2011,31(25):10-16. Zhou Songlin,Mao Meiqin,Su Jianhui.Short-term forecasting of wind power and non-parametric confidence interval estimation[J].Proceedings of the CSEE,2011,31(25):10-16(in Chinese).