大规模特高压直流水电消纳问题及应用实践

DOI: 10.13334/j.0258-8013.pcsee.2015.03.006, PP. 549-560

Keywords: 特高压直流,大电网,水电,调峰,西电东送

Full-Text   Cite this paper   Add to My Lib

Abstract:

随着金沙江、雅砻江、澜沧江流域溪洛渡、向家坝、糯扎渡、锦屏等巨型水电站陆续全部竣工和集中并网发电,中国水电输送规模急剧扩大,大规模水电输送直接影响到中国电力资源大范围合理配置,其消纳和对受电端电网的调峰矛盾凸显。然而,由于送端电网水电调节性能弱和消纳能力有限,中国现行的按照电站自身的运行要求或者送端电网的电力盈余安排输送计划的方式,极易出现“直线”或者“反调峰”水电输送计划,加重了受电端电网调峰压力,不利于水电大规模消纳和发挥其优质的调峰作用。如何根据送受端电网负荷特性差异,发挥跨流域梯级水电站群相互补偿作用,利用不同电源特性以最大程度消纳水电和发挥水电的调峰作用,需要研究水电大规模输送的网网协调、网省协调、厂网协调优化调度方法、补偿机制、调峰阀值和协调策略等。上述问题是中国现阶段特高压直流水电大规模输送核心所在,其研究将能够更加合理配置中国电力资源,缓解受电端电网调峰压力,改善长三角洲、珠江三角洲电源结构,减轻这些地区的雾霾压力,切实保障中国电网安全、经济、环保、可靠运行。

References

[1]  Cheng Chuntian,Shen Jianjian,Wu Xinyu,et al.Operation challenges for fast-growing China's hydropower systems and respondence to energy saving and emission reduction[J].Renewable and Sustainable Energy Reviews,2012,16(5):2386-2393.
[2]  Tang Wenzhe,Li Zhuoyu,Qiang Maosha,et al.Risk management of hydropower development in China[J].Energy,2013,60(C):316-324.
[3]  Zhao Xingang,Liu Lu,Liu Xiaomeng,et al.A critical-analysis on the development of China hydropower[J].Renewable Energy,2012,44(C):1-6.
[4]  刘振亚,张启平,董存,等.通过特高压直流实现大型能源基地风、光、火电力大规模高效率安全外送研究[J].中国电机工程学报,2014,34(16):2513-2522.Liu Zhenya,Zhang Qiping,Dong Cun,et al,Efficient and security transmission of wind,photovoltaic and thermal power of large-scale energy resource bases through UHVDC projects[J].Proceedings of the CSEE,2014,34(16):2513-2522(in Chinese).
[5]  刘振亚,中国特高压交流输电技术创新[J].电网技术,2013,37(3):567-574.Liu Zhengya,Innovation of UHVAC Transmission Technology in China[J].Power System Technology,2013,37(3):567-574(in Chinese).
[6]  刘振亚,张启平.国家电网发展模式研究[J].中国电机工程学报,2013,23(7):1-10.Liu Zhengya,Zhang Qiping,Study on the development mode of national power grid of China[J].Proceedings of the CSEE,2013,23(7):1-10(in Chinese).
[7]  刘振亚,秦晓辉,赵良,等.特高压直流分层接入方式在多馈入直流电网的应用研究[J].中国电机工程学报,2013,33(10):1-7.Liu Zhengya,Qin Xiaohui,Zhao Liang,et al.Study on the application of UHVDC hierarchical connection mode to multi-infeed HVDC system[J].Proceedings of the CSEE,2013,33(10):1-7(in Chinese).
[8]  中国水力发电工程学会,中国水电工程顾问集团公司,中国水利水电建设集团公司.中国水力发电科学技术发展报告[M].北京:中国电力出版社,2012:1-2.China Society for Hydropower Engineering,Hydrochina Corporation,Sinohydro Corporation.China's hydropower development report of science and technology[M].Beijing:China Electric Power Press,2012:1-2(in Chinese).
[9]  周建平,钱钢粮.十三大水电基地的规划及其开发现状[J].水利水电施工,2011(1):1-7.Zhou Jianzhong,Qian Ganliang.Planning and development status of thirteen hydropower base in China [J].Water Conservancy and Hydropower Construction,2011 (1):1-7(in Chinese).
[10]  魏昭峰.中国电力年鉴(各地区电力) 2003—2013年 [M].北京:中国电力出版社,2003—2013.Wei Zhaofen.China Electric Power Yearbook(regional power) 2003-2013[M].Beijing:China Electric Power Press,2003-2013(in Chinese).
[11]  帅军庆.以特高压工程建设为契机,优化调整电网结构 全面提高输送能力,开创华东电网发展新局面[J].华东电力,2005,33(5):1-6.Shuai Junqing.Taking opportunity of UHV construction to optimize grid structure and increase transmission capacity all-roundly for a new development of East China Power Grid[J].East China Electric Power,2005,33(5):1-6(in Chinese).
[12]  帅军庆.华东电网技术创新和发展展望[J].电网技术,2005,29(19):26-30.Shuai Junqing.Technology innovation and development prospects of East China Power Grid[J].Power System Technology,2005,29(19):26-30(in Chinese).
[13]  Energy Information Administration (EIA).Total net summer capacity by fuel type[EB/OL].2014[2003-.http://www.eia.gov/electricity/capacity/.
[14]  Barros M,Tsai F,Yang S,et al.Optimization of large-scale hydropower system operations[J].Journal of Water Resources Planning and Management,2003,129(3):178-188.
[15]  Zambon R,Barros M,Lopes J,et al.Optimization of large-scale hydrothermal system operation[J].Journal of Water Resources Planning and Management,2011,138(2):135-143.
[16]  程春田,武新宇,申建建,等.大规模水电站群短期优化调度方法Ⅰ:总体概述[J].水利学报,2011,42(9):1017-1024.Cheng Chuntian,Wu Xinyu,ShenJianjian,et al.Short-term optimal operation methods of large-scale hydropower plants-I:General overview[J].Shuili Xuebao,2011,42(9):1017-1024(in Chinese).
[17]  武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题[J].水利学报,2012,43(1):31-42.Wu Xinyu,Cheng Chuntian,Shen Jianjian,et al.Short-term Optimal Operation methods of large-scale hydropower plants-Ⅲ:Solution method of peak load regulation for multiple power grid[J].Shuili Xuebao,2012,43(1):31-42(in Chinese).
[18]  程春田,申建建,武新宇,等.大规模复杂水电优化调度系统的实用化求解策略及方法[J].水利学报,2012,43(7):785-795,802.Cheng Chuntian,Shen Jianjian,Wu Xinyu,et al.Practical solution strategies and methods of large-scale complex hydropower system operations[J].Shuili Xuebao,2012,43(7):785-795,802(in Chinese).
[19]  Cheng Chuntian,Shen Jianjian,Wu Xinyu,et al.Short-term hydroscheduling with discrepant objectives using multi-step progressive optimality algorithm[J].Journal of the American Water Resources Association,2012,48(3):464-479.
[20]  袁晓辉,袁艳斌,王金文,等.水火电力系统短期发电计划优化方法综述[J].中国电力,2002,35(9):36-41.Yuan Xiaohui,Yuan Yanbin,Wang Jinwen,et al.A survey of optimization methods for short-term generation scheduling of hydrothermal power systems[J].Electric Power,2002,35(9):36-41(in Chinese).
[21]  林笃学.福建电网水火电联合经济调度的探讨[J].福建电力与电工,2001,21(3):55-57.Lin Duxue.Hydro-thermal economic dispatch discuss of Fujian Power Grid[J].Fujian Dianli Yu Diangong,2001,21(3):55-57(in Chinese).
[22]  Cheng Chuntian,Shen Jianjian,Wu Xinyu.Short-term scheduling for large-scale cascaded hydropower systems with multivibration zones of high head[J].Journal of Water Resources Planning and Management,2011,138(3):257-267.
[23]  白涛,畅建霞,方建熙,等.小浪底、西霞院梯级水电站短期调峰调度研究[J].水力发电学报,2012,31(04):83-88.Bai Tao,Chang Jianxia,Fang Jianxi,et al.Study on short-term peak load of Xiaolangdi and XiXiayuan cascade hydropower stations[J].Journal of Hydroelectric engineering,2012,31(04):83-88(in Chinese).
[24]  喻杉,纪昌明,张验科,等.基于负荷曲线的水电站群短期运行效益研究[J].水电能源科学,2012,30(2):56-59,158.Yu Shan,Ji Changming,Zhang Yanke,et al.Short-term operation benefit analysis of cascade hydropower stations based on load curve[J].Water Resources and Power,2012,30(2):56-59,158(in Chinese).
[25]  Yu B,Yuan X,Wang J.Short-term hydro-thermal scheduling using particle swarm optimization method[J].Energy Conversion and Management,2007,48(7):1902-1908.
[26]  温鹏,万永华.联合电力系统中直调电厂子系统电力的经济分配研究[J].电力系统自动化,1999,23(23):41-44.Wen peng,Wan Yonghua.Research on economic distribution of directly dispatched power systems in interconnected power system[J].Automation of Electric Power Systems,1999,23(23):41-44(in Chinese).
[27]  孙时春,朱翠兰,刘筱,等,华中电网水火电协调下的水电站日经济调度[J].华中电力,1995,8(2):47-51.Sun Shichun,Zhu Cuilan,Liu Xiao,et al.Hydropower plant day economic dispatch under hydro-thermal coordination in Cental China Power Grid[J].Cental China Electric Power,1995,8(2):47-51(in Chinese).
[28]  EL-SEDAWIa I R M,P.D.R.M.G.Multilevel optimization of a hydro-thermal interconnected power system[J].International Journal of Systems Science,1989,20(8):1467-1482.
[29]  Cobian M J.Optimal pumped storage operation with interconnected power systems[J].IEEE Transactions on Power Apparatus and Systems,1971,90(3):1391-1399.
[30]  Chung K H,Kim B H,Hur D.Distributed implementation of generation scheduling algorithm on interconnected power systems[J].Energy Conversion and Management,2011,52(12):3457-3464.
[31]  Chung K H,Kim B H,Hur D.A new approach to generation scheduling in interconnected power systems using predictor-corrector proximal multiplier method[J].Electrical Engineering,2012,94(3):177-186.
[32]  Enamorado J C,Ramos A,Go,et al.Multi-area decentralized optimal hydro-thermal coordination by the Dantzig-Wolfe decomposition method[C]//Power Engineering Society Summer Meeting.Seattle,WA:Institute of Electrical and Electronics Engineers,2000:2027 - 2032.
[33]  范明天,张祖平,杨少勇,等.具有抽水蓄能电厂的多区域电网日经济调度研究[J].电网技术,2000,24(08):57-61.Fan Mingtian,Zhang Zuping,Yang Shaoyong,et al.Economic dispatch of multi-regional power network involving pump storage plants[J].Power System Technology,2000,24(08):57-61(in Chinese).
[34]  Hernandez H M,Diaz J A,Sanchex G A,et al.Operations planning of Colombian hydro-thermal interconnected system[J].IEEE Transactions on Power Systems,1991,6(2):778-786.
[35]  黄琳.智能电网发展对华东地区能源供需格局的影响[J].华东电力,2011,39(4):543-546.Huang Lin.Effects of smart grid development on patterns of energy supply and demand[J].East China Electric Power,2011,39(4):543-546(in Chinese).
[36]  张运洲.我国区域电网未来主网架结构特点与发展趋势[J].中国电力,2005,38(1):1-6.Zhang Yunzhou.Characteristics and development tendency of main framework in the funture for regional power grid in China[J].Electric Power,2005,38(1):1-6(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133