蔡小燕,张燕平,李钰,等.700 ℃超超临界燃煤发电机组热力系统设计及?分析[J].动力工程学报,2012,32(12):972-978.Cai Xiaoyan,Zhang Yanping,Li Yu,et al Design and exergy analysis on thermodynamic system of a 700 ℃ ultra supercritical coal-fired power generating set[J].Journal of Chinese Society of Power Engineering,2012,32(12):972-978(in Chinese).
徐钢,许诚,杨勇平,等.电站锅炉余热深度利用及尾部受热面综合优化[J].中国电机工程学报,2013,33(14):1-8.Xu Gang,Xu Cheng,Yang Yongping,et al.Deep Utilization of Exhaust Heat and Comprehensive Optimization of the Tail Heating Surfaces of UtilityBoiler[J].Proceedings of the CSEE,2013,33(14):1-8(in Chinese).
[4]
解海龙,丁乐群,蒋安众,等.火电厂锅炉余热回收方式的分析比较[J].锅炉技术,1995(4):15-19.Xie Hailong,Ding Lequn,Jiang Anzhong,et al.Analysis and comparison about methods of waste heat recovery in power plant boiler[J].Boiler Technology,1995(4):15-19(in Chinese).
[5]
池作和,潘维,李戈,等.600 MW回转式空气预热器冷端金属温度试验研究[J].中国电机工程学报,2002,22(11):129-131.Chi Zuohe,Pan Wei,Li Ge,et al.Experimental atudies on measuringthe cold end metal temperature of 600 MW rotating air heater[J].Proceedings of the CSEE,2002,22(11):129-131(in Chinese).
[6]
杨勇平,杨志平,徐钢,等.中国火力发电能耗状况及展望[J].中国电机工程学报,2013,33(23):1-11.Yang Yongping,Yang Zhiping,Xu Gang,et al.Situation and prospect of energy consumpt ion for China’s thermal power generation[J].Proceedings of the CSEE,2013,33(23):1-11(in Chinese).
[7]
国家统计局能源统计司.中国能源统计年2011[M].北京:中国统计出版社,2011:1-5.Department of Energy Statistics,National Bureau of Statistics Perople’s of.China energy statistical yearbook 2011[M].Beijing:China Statistics Press,2011:1-5(in Chinese).
[8]
冯伟忠.未来低碳煤电技术的发展之思考[J].上海节能,2011(8):1-6.Feng Weizhong.Future development thinking of low carbon coal technology[J].Shanghai Energy Conservation,2011(8):1-6(in Chinese).
[9]
冯伟忠.我国超临界机组的发展[J].上海电力学院学报,2011,27(5):417-422.Feng Weizhong.Development of China’s supercritical coal fired power generation unit[J].Journal of Shanghai University of Electric Power,2011,27(5):417-422(in Chinese).
[10]
刘鹤忠,连正权.低温省煤器在火力发电厂中的运用探讨[J].电力勘探设计,2010,8(4):32-38.Liu Hezhong,Lian Zhengquan.Application of low temperature saving coal devicein generate electricity power plant[J].2010,8(4):32-38(in Chinese).
[11]
龙辉,严舒,王盾.超超临界机组设计技术集成化发展探讨[J].电力建设,2011/2,32(2):71-75.Long Hui,Yan Shu,Wang Dun.Integrated design technology development of ultra supercritical unit[J].Electric Power Construction,2011/2,32(2):71-75(in Chinese).
[12]
赵之军,冯伟忠,张玲,等.电站锅炉排烟余热回收的理论分析与工程实践[J].动力工程,2009,29(11):994-997.Zhao Zhijun,Feng Weizhong,Zhang Ling,et al.Theoretical analysis and engineering practice of heat recovery from exhaust gas of power boilers[J].Journal of Power Engineering,2009(11):994-997(in Chinese).
[13]
黄新元,孙奉仲,史月涛.火电厂热系统增设低压省煤器的节能效果[J].热力发电,2007,37(3);56-58.Huang Xinyuan,Sun Fengzhong,Shi Yuetao.Energy consumption effect of coal-fired power plant heat system with low pressure economizer[J].Thermal Power Generation.2007,37(3);56-58(in Chinese).
[14]
陆万鹏,孙奉仲,等.前置式液相介质空气预热器经济性分析及热力系统优化[J].中国电机工程学报,2011,31(11):6-10.Lu Wanpeng,Sun Fengzhong,et al.Economic analysis and thermodynamic system optimization of front-located air preheater with liquid mediator[J].Proceedings of the CSEE,2011,31(11):6-10(in Chinese).
[15]
严俊杰,邵树峰,李杨,等.二次再热超临界机组热力系统经济性定量分析方法[J].中国电机工程学报,2004,24(1):186-190.Yan Junjie,Shao Shufeng,Li Yang,et al.A method for analysis the economics of a thermal system in a supercritical pressure power unit with double reheat cycles[J].Proceedings of the CSEE,2004,24(1):186-190(in Chinese).
[16]
纪世东,周荣灿,王生鹏,等.700 ℃等级先进超超临界发电技术研发现状及国产化建议[J].热力发电,2011,40(7):86-88.Ji Shidong,Zhou Rongcan,Wang Shengpeng,et al.Research and development status and localization of recommendations of 700 ℃ grade advanced ultra-superciritical power generation technology[J].Thermal Power Generation,2011,40(7):86-88(in Chinese).
[17]
闫水保,马新灵.电站锅炉受热面能级分析[J].发电设备,2006(2):101-107.Yan Shuibao,Ma Xinling.Energy level analysis of heat deliverysurfaces of boilers[J].Power Equipment,2006(2):101-107(in Chinese).
[18]
张娜,蔡睿贤.燃气轮机考虑经济性和环保因素的热力分析[J].工程热物理学报,1997,18(4):405-408.Zhang Na,Cai Ruixian.Gas turbine considering economic and environmental factors of thermal analysis[J].Journal of Engineering Thermophysics,1997,18(4):405-408(in Chinese).
[19]
Hongtao Li,Francois Marechal,et al.Multi-objective optimization of an advanced combined cycle power plant including CO 2 separation options[J].Energy,2006,31(15):3117-3134.
[20]
G Xu,H G Jing,Y P Yang,et al.A comprehensive economic analysis method for power generation system with CO 2 capture[J].International Journal of Energy Research,2009,34(4):321-332.
[21]
Espatolero S,Cortes C,Romeo L M.Optimization of boiler cold-end and integration with the steam cycle in supercritical units[J].Applied Energy,2010,87(5):1651-1660.