考虑碳减排日指标约束的碳捕集调度策略

, PP. 159-165

Keywords: 节能减排,碳减排,碳捕集,多代理,机组爬坡,厂网协调

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了节能减排和碳捕集电厂不足情况下碳减排指标的完成,在碳减排日指标约束下,提出一种碳捕集调度策略以实现厂内减排和厂网协调减排。厂内减排引入碳捕集装置的启停次数,以煤耗最小为目标实现机组的组合。厂网协调减排时,通过多代理解决各时段的机组优化问题和机组爬坡问题,在综合考虑煤耗及网损的基础上,使碳捕集电厂多发电并进行碳捕集以实现CO2减排的目的。仿真结果表明,在不同指标的约束下,厂内减排和厂网协调减排能有效地实现碳减排任务。

References

[1]  国务院. 国家?十二五?规划纲要[R]. 北京:国务院, 2011.State Council.National ?12th five-year? plan compendium[R].Beijing:StateCouncil,2011.
[2]  IEA. World energy outlook 2007 China and India insight[M]. Pairs:Iea Publications, 2008:13.
[3]  国务院. 国办发
[4]  53号文件:国务院办公厅关于转发发展改革委等部门节能发电调度办法(试行)的通知[EB/OL]. [2011-12-15].http://www.china.com.cn/policy/ txt/2007-08/07/content_8642683.htm. State Council.53th file of the State Council office:notice on energy generation scheduling approach(Trial) of State Council Office transmitting State Development and Reform Commission and other departments[EB/OL].[2011-12-15].http://www.china.com.cn/policy/txt/2007- 08/07/content_8642683.htm.,
[5]  康重庆,陈启鑫,夏清. 低碳电力技术的研究展望[J]. 电网技术, 2009,33(2):1-7. Kang Chongqing,Chen Qinxin,Xia Qing.Prospects of low-carbon electricity[J].Power System Technology,2009,33(2)
[6]  Chen Q X,Kang C Q,Xia Q,et al. Power generation expansion planning model towards low-carbon economy and its application in china[J]. IEEE Transactions on Power Systems, 2010,25(2):1117-1125.
[7]  Dang C Y,Li M Q. Floating-point genetic algorithm for solving the unit commitment problem[J]. European Journal of Operational Research, 2007,181(3):1370-1395.
[8]  李学斌. 火电厂厂级负荷分配的多目标优化和决策研究[J]. 中国电机工程学报, 2008,28(35):102-107. Li Xuebin.Study of multi-objective optimization and multi-attribute decision making of economic load dispatch problem[J].Proceedings of the CSEE,2008,28(35)
[9]  李树山,李刚,程春田,等. 动态机组组合与等微增率法相结合的火电机组节能负荷分配方法[J]. 中国电机工程学报, 2011,31(7):41-47. Li Shushan,Li Gang,Cheng Chuntian,et al.Thermal units? energy conservation load dispatch method with combining dynamic unit commitment into equal incremental principle[J].Proceedings of the CSEE,2011,31(7)
[10]  张晓花,赵晋泉,陈星莺. 节能减排多目标机组组合问题的模糊建模及优化[J]. 中国电机工程学报, 2010,30(22):71-76. Zhang Xiaohua,Zhao Jinquan,Chen Xingying.Multi- objective unit commitment fuzzy modeling and optimization for energy-saving and emission reduction [J].Proceedings of the CSEE,2010,30(22)
[11]  Grubb M,Jamasb T,Pollitt M G. Delivering a low-carbon electricity system[M]. Cambridge:Cambridge University Press, 2008:133-180.
[12]  IPCC. Special report on carbon dioxide capture and storage[M]. Cambridge:Cambridge University Press, 2005:106-171.
[13]  刘练波,黄斌,郜时旺,等. 燃煤电站3000~5000 t/a CO2捕集示范装置工艺及关键设备[J]. 电力设备, 2008,9(5):21-24. Liu Lianbo,Huang Bin,Gao Shiwang,et al.A pilot plant process and key equipment for capture CO2 3000~5000 t/a in coal-fired power station[J].Electrical Equipment,2008,9(5)
[14]  Chen Qinxin,Kang Chongqing,Xia Qing. Modeling flexible operation mechanism of CO2 capture power plant and its effects on power-system operation[J]. IEEE Transactions on Energy Conversion, 2010,25(3):853-861.
[15]  陈启鑫,康重庆,夏清. 碳捕集电厂的运行机制研究与调峰效益分析[J]. 中国电机工程学报, 2010,30(7):22-28. Chen Qixin,Kang Chongqing,Xia Qing.Operation mechanism and peak-load shaving effects of carbon- capture power plant[J].Proceedings of the CSEE,2010,30(7)
[16]  卢志刚,祁艳君,杨俊强,等. 碳捕集系统在火电厂中的优化配置[J].电力系统自动化,2011,35(7):34-37. Lu Zhigang, Qi Yanjun,Yang Junqiang,et al.Optimal allocation of carbon capture systems in power plants [J].Automation of Electric Power Systems,2011,35(7):34-37(in Chinese).
[17]  卢志刚,夏明昭,张晓辉. 基于多阶段减排规划的发电厂碳捕集系统优化配置[J]. 中国电机工程学报, 2011,31(35):65-71. Lu Zhigang,Xia Mingzhao,Zhang Xiaohui.Carbon capture systems optimal allocation scheme for multi-stage emission reduction planning in power plants [J].Proceedings of the CSEE,2011,31(35)
[18]  陈启鑫,康重庆,夏清,等. 低碳电力调度方式及其决策模型[J]. 电力系统自动化, 2010,34(12):18-22. Chen Qixin,Kang Chongqing,Xia Qing,et al.Mechanism and modeling approach to low-carbon power dispatch [J].Automation of Electric Power Systems,2010,34(12)
[19]  李振坤,陈星莺,赵波,等. 配电网动态重构的多代理协调优化方法[J]. 中国电机工程学报, 2008,28(34):72-79. Li Zhenkun,Chen Xingying,Zhao Bo,et al.Dynamic reconfiguration of the distribution network based on multi-agent systems[J].Proceedings of the CSEE,2008,28(34)
[20]  Martens P,Delarue E,D'haeseleer W. A mixed integer linear programming model for a pulverized coal plant with post-combustion carbon capture[J]. IEEE Transactions on Power Systems, DOI:10.1109/TPWRS.2011.2173506.
[21]  解可新,韩立兴,林友联. 最优化方法[M]. 天津:天津大学出版社, 1997:238-241. Xie Kexin,Han Lixing,Lin Youlian.Optimization method[M].Tianjin:TianjinUniversity Press,1997
[22]  张景瑞,龙健,岳超源,等. 水火电力系统短期优化调度的一种改进粒子群算法[J]. 控制与决策, 2011,26(3):407-412. Zhang Jingrui,Long Jian, Yue Chaoyuan,et al.A modified particle swarm optimizer for short-term hydrothermal scheduling with cascaded reservoirs [J].Control and Decision,2011,26(3)
[23]  侯云鹤,鲁丽娟,熊信良,等. 改进粒子群算法及其在电力系统经济负荷分配中的应用[J]. 中国电机工程学报, 2004,24(7):95-100. HouYunhe,Lu Lijuan,Xiong Xinyin,et al.Enhaneed particle swarm optimization algorithnm and its application on economic dispatch of power system[J].Proceedings of the CSEE,2004,24(7)
[24]  孙静,于继来. 节能发电调度问题的多目标期望控制模型及解法[J]. 电力系统自动化, 2010,34(11):23-27. Sun Jing,Yu Jilai.A multi-objective expectation control model and its solutions for energy-saving power dispatch problems[J].Automation of Electric Power Systems,2010,34(11)

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133