[1] | Jiang C,Bompard E. A self-adaptive chaotic particle swarm algorithm for short term hydroelectric system scheduling in deregulated environment[J]. Energy Conversion and Management, 2005,46(17):2689-2696.
|
[2] | Yu B,Yuan X,Wang J. Short-term hydro-thermal scheduling using particle swarm optimization method[J]. Energy Conversion and Management, 2007,48(7):1902-1908.
|
[3] | Chang G,Aganagic M,Waight J,et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J]. IEEE Transactions on Power Systems, 2001,16(4):743-749.
|
[4] | 王金文,袁晓辉,张勇传. 随机动态规划在三峡梯级长期发电优化调度中的应用[J]. 电力自动化设备, 2002,22(8):54-56. Wang Jinwen,Yuan Xiaohui,Zhang Yongchuan.Long term generation optimization of Three-Gorge cascade using stochastic dynamic programming[J].Electric Power Automation Equipment,2002,22(8)
|
[5] | 吴杰康,郭壮志. 基于仿电磁学算法的梯级水电站多目标短期优化调度[J]. 中国电机工程学报, 2010,30(31):14-21. Wu Jiekang,Guo Zhuangzhi.Electromagnetism-like mechanism based multi-objective short-term optimization scheduling for cascade hydro plants[J].Proceedings of the CSEE,2010,30(31)
|
[6] | 谭忠富,陈广娟,赵建保,等. 以节能调度为导向的发电侧与售电侧峰谷分时电价联合优化模型[J]. 中国电机工程学报, 2009,29(1):55-62. Tan Zhongfu,Chen Guangjuan,Zhao Jianbao,et al.Optimization model for designing peak-valley time-of-use power price of generation side and sale side at the direction of energy conservation dispatch[J].Proceedings of the CSEE,2009,29(1)
|
[7] | 王一,程浩忠. 计及输电阻塞的帕累托最优多目标电网规划[J]. 中国电机工程学报, 2008,28(13):132-138. Wang Yi,Cheng Hongzhong.Pareto optimality based multi-objective transmission planning considering transmission congestion[J].Proceedings of the CSEE,2008,28(13)
|
[8] | 王乐,余志伟,文福拴. 基于机会约束规划的最优旋转备用容量确定[J]. 电网技术, 2009,30(20):13-19. Wang Le,Yu Zhiwei,Wen Fuchuan.A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity[J].Power System Technology,2009,30(20)
|
[9] | 朱建全,吴杰康. 水火电力系统短期优化调度的不确定性模型[J]. 电力系统自动化, 2008,32(6):51-54,103. Zhu Jianquan,Wu Jiekang.An uncertainty model for short-term optimization scheduling of hydrothermal power system[J].Automation of Electric Power Systems,2008,32(6)
|
[10] | 吴杰康,朱建全. 机会约束规划下的梯级水电站短期优化调度策略[J]. 中国电机工程学报, 2008,28(13):41-46. Wu Jiekang,Zhu Jianquan.A new strategy for short-term scheduling optimization of cascade hydro plants based on chance-constrained programming[J].Proceedings of the CSEE,2008,28(13)
|
[11] | 王金文,范习辉,张勇传,等. 大规模水电系统短期调峰电量最大模型及其求解[J]. 电力系统自动化, 2003,27(15):29-34. Wang Jinwen,Fang Xihui,Zhang Yongchuan.Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems[J].Automation of Electric Power Systems,2003,27(15)
|
[12] | 谢永胜,孙洪波,徐国禹. 基于模糊来水量、模糊负荷的短期水火电调度[J]. 中国电机工程学报, 1996,16(6):430-433. Xie Yongsheng,Sun Hongbo,Xu Guoyu.A short term hydrothermal scheduling with fuzzy inflows and loads[J].Proceedings of the CSEE,1996,16(6)
|
[13] | 吴杰康,唐力. 基于模糊机会约束规划的水火电力系统多目标随机调度模型[J]. 中国电机工程学报, 2011,31(25):26-34. Wu Jiekang,Tang li.Multi-objective stochastic scheduling models for hydrothermal plants based on fuzzy chance constrained programming[J].Proceedings of the CSEE,2011,31(25)
|
[14] | 苏鹏,刘天琪,赵国波,等. 基于改进粒子群算法的节能调度下多目标负荷最优分配[J]. 电网技术, 2009,33(5):48-53. Su Peng,Liu Tianqi,Zhao Guobo,et al.An improved particle swarm optimization based multi-objective load dispatch under energy cnservation dispatching[J].Power System Technology,2009,33(5)
|
[15] | Grake J H,Kirchmayer L K. Optimum operation of a hydrothermal system[J]. IEEE Transactions on Power Apparatus and Systems, 1962,80(3):242-250.
|
[16] | Yeh W W. Optimization of real time hydrothermal system operation[J]. Journal of Water Resources Planning and Management, 1992,118(6):636-653.
|
[17] | Habibollahzadeh H,Bubenko J A. Application of ecomposition techniques to short term operation planning of hydro-thermal power system[J]. IEEE Transactions on Power Apparatus and Systems, 1986,1(1):41-47.
|
[18] | Ni E,Guan X. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs[J]. IEEE Transactions on Power Apparatus and Systems, 1999,14(3):1127-1132.
|
[19] | Basu M. Hopfield neural networks for optimal scheduling of fixed head hydrothermal power systems[J]. Electric Power Systems Research, 2003,64(1):11-15.
|
[20] | Wu Y,Ho C,Wang D. A diploid genetic approach to short-term scheduling of hydro-thermal system[J]. IEEE Transactions on Power Systems, 2000,15(4):1268-1274.
|
[21] | 马瑞,贺仁睦,颜宏文,等. 考虑水火协调的多目标优化分组分段竞标模型[J]. 中国电机工程学报, 2004,24(11):53-57. Ma Rui,He Renmu,Yan Hongwen,et al.A novel multi-objective optimal group and block bidding model for hydrothermal power market[J].Proceedings of the CSEE,2004,24(11)
|
[22] | 刘宝碇,赵瑞清,王纲. 不确定规划及应用[M]. 北京:清华大学出版社, 2003:213-215. Liu Baodian,Zhao Ruiqing,Wang Gang.Uncertain programming and application[M].Beijing:TsinghuaUniversity Press,2003
|