Moura P S,de Almeida A T.The role of demand-side management in the grid integration of wind power[J]. Applied Energy,2010,87(8):2581-2588.
[2]
Liang R H,Liao Jianhao.A fuzzy optimization approach for generation scheduling with wind and solar energy systems[J].IEEE Transactions on Power Systems,2007,22(4):1665-1674.
[3]
李文娟.风电并网及其穿透功率极限研究[D].武汉:华中科技大学,2009.Li Wenjuan.Study on integration and the penetration limit of wind power[D].Wuhan:Huazhong University of Science & Technology,2009(in Chinese).
[4]
肖创英,汪宁渤,陟晶,等.甘肃酒泉风电出力特性分析[J].电力系统自动化,2010,34(17):64-67.Xiao Chuangying,Wang Ningbo,Zhi Jing,et al.Power characteristics of jiuquan wind power base[J].Automation of Electric Power Systems,2010,34(17):64-67(in Chinese).
[5]
肖创英,汪宁渤,丁坤,等.甘肃酒泉风电功率调节方式的研究[J].中国电机工程学报,2010,30(10):1-7.Xiao Chuangying,Wang Ningbo,Ding Kun,et al.System power regulation scheme for jiuquan wind power base [J].Proceedings of the CSEE,2010,30(10):1-7(in Chinese).
[6]
Billinon R,Baig.Generating capacity adequacy associated with wind energy[J].IEEE Trans. on Energy Conversion,2004,19(3):641-646.
[7]
Armando M Leite da Silva,Warlley S Sales,Luiz Antônio da Fonseca Manso,et al.Long-term probabilistic evaluation of operating reserve requirements with renewable sources[J].IEEE Trans. on Power System,2010,25(1):106-116.
[8]
张伯明,吴文传,郑太一,等.消纳大规模风电的多时间尺度协调的有功调度系统设计[J].电力系统自动化,2011,35(1):1-6.Zhang Boming,Wu Wenchuan,Zheng TAiyi,et al.Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J].Automation of Electric Power Systems,2011,35(1):1-6(in Chinese).
[9]
王卿然,谢国辉,张粒子.含风电系统的发用电一体化调度模型[J].电力系统自动化,2011,35(5):15-18.Wang Qingran,Xie Guohui,Zhang Lizi.An integrated generation-consumption dispatch model with wind power [J].Automation of Electric Power Systems,2011,35(5):15-18(in Chinese).
[10]
周玮,彭昱,孙辉,等.含风电场的电力系统动态经济调度[J].中国电机工程学报,2009,29(25):13-18.Zhou Wei,Peng Yu,Sun Hui,et al.Dynamic economic dispatch in wind power integrated system[J].Proceedings of the CSEE,2009,29(25):13-18(in Chinese).
[11]
Doh Erty R,De Nny E,O’ MALLEY M.System operation with a significant wind power penetration[C]// Proceedings of IEEE Power Engineering Society General Meeting.Denver,CO,USA:IEEE,2004:1002-1007.
[12]
Ort Ega-Vazque A M A,Kirschen D S.Estimating the spinning reserve requirements in systems with significant wind power generation penetration[J].IEEE Trans on Power Systems,2009,24(1):114-124.
[13]
Moral Es J M,Conejo A J,Perez-Ruiz J.Economic valuation of reserve in power systems with high penetration of wind power[J].IEEE Trans. on Power Systems,2009,24(2) :900-910.
[14]
葛炬,王飞,张粒子.含风电场电力系统旋转备用获取模型[J].电力系统自动化,2010,34(6):32-36.Ge Ju,Wang Fei,Zhang Lizi.Spinning reserve model in the wind power integrated power system[J].Automation of Electric Power Systems,2010,34(6):32-36(in Chinese).
[15]
苏鹏,刘天琪,李兴源.含风电的系统最优旋转备用的确定[J].电网技术,2010,34(12):158-162.Su Peng,Liu Tianqi,Li Xingyuan.Determination of optimal spinning reserve of power grid containing wind [J].Power System Technology,2010,34(12):158-162(in Chinese).
[16]
王彩霞,乔颖,鲁宗相.考虑风电效益的风火互系统旋转备用确定方式[J].电力系统自动化,2012,36(4):16-21.Wang Caixia,Qiao Ying,Lu Zongxiang.A method for determination of spinning reserve in wind-thermal power systems considering wind power benefits[J].Automation of Electric Power Systems,2012,36(4):16-21(in Chinese).
[17]
王蓓蓓,李扬.面向智能电网的电力需求侧管理规划及实施机制[J].电力自动化设备,2010,30(12):19-24.Wang Beibei,Li Yang.Demand side management planning and implementation mechanism for smart grid[J].Electric Power Automation Equipment,2010,30(12):19-24(in Chinese).
[18]
张钦,王锡凡,付敏,等.需求响应视角下的智能电网[J].电力系统自动化,2009(17):49-55.Zhang Qin,Wang Xifan,Fu Min,etal.Smart grid from the perspective of demand response[J].Automation of Electric Power Systems,2009,33(17):49-55(in Chinese).
[19]
刘峻,何世恩.建设坚强智能电网助推酒泉风电基地发展[J].电力系统保护与控制,2010,38(21):19-23.Liu Jun,He Shien.Strong smart grid boosts Jiuquan wind power base development[J].Power System Protection and Control,2010,38(21):19-23(in Chinese).
[20]
Sioshansi R,Short W.Evaluating the impacts of real-time pricing on the usage of wind generation[J]. IEEE Trans. on Power Systems,2009,24(2):516-524.
[21]
Sioshansi R.Evaluating the impacts of real-time pricing on the cost and value of wind generation[J].IEEE Trans. on Power Systems,2010,25(2):741-748.
[22]
艾欣,刘晓.基于需求响应的风电消纳机会约束模型研究[J].华北电力大学学报:自然科学版,2011,38(3):17-22.Ai Xin,Liu Xiao.Chance constrained model for wind power usage based on demand response[J].Journal of North China Electric Power University:Natural Science Edition,2011,38(3):17-22(in Chinese).
[23]
刘小聪,王蓓蓓,李扬,等.智能电网下计及用户侧互动的发电日前调度计划模型[J].中国电机工程学报,2013,33(1):30-39.Liu Xiaocong,Wang Beibei,Li Yang,et al.Day-ahead generation scheduling model considering demand side interaction under smart grid paradigm[J].Proceedings of the CSEE,2013,33(1):30-39(in Chinese).
[24]
阮文骏,王蓓蓓,李扬,等.峰谷分时电价下的用户响应行为研究[J].电网技术,2012,36(7):86-93.Ruan Wenjun,Wang Beibei,Li Yang,et al.Customer response behavior in time-of-use price d[J].Power System Technology,2012,36(7):86-93(in Chinese).
[25]
李文沅.电力系统安全经济运行-模型与方法[M].重庆:重庆大学出版社,1988:148-149.Li Wenyuan.The safety of the electricity system economy operation-model and method[M].Chongqing:Chongqing University Press,1988:148-149(in Chinese).
[26]
陈树勇,戴慧珠,白晓民,等.含风电场的电力系统随机生产模拟[J].中国电力,2000,33(3):30-31.Chen Shuyong,Dai Huizhu,Bai Xiaomin,et al.Power system probabilistic production simulation including wind power plants[J].Electric Power,2000,33(3):30-31(in Chinese).
[27]
吴义纯,丁明,李生虎.风电场对发输电系统可靠性影响的评估[J].电工技术学报,2004,19(11):72-76.Wu Yichun,Ding Ming,Li Shenghu.Reliability assessment of wind farms in generation and transmission systems[J].Transactions of China Electro technical Society,2004,19(11):72-76(in Chinese).
[28]
雷亚洲,王伟胜,印永华,等.基于机会约束规划的风电穿透功率极限计算[J].中国电机工程学报,2002,22(5):32-35.Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Wind power penetration limit calculation based on chance constrained programming[J].Proceedings of the CSEE,2002,22(5):32-35(in Chinese).