Zarco P,Exposito A G.Power system parameter estimation:a survey[J].IEEE Trans. on Power Systems,2000,15(1):216-222.
[2]
Fletcher D,Stadlin W,Transformer tap position estimation[J].IEEE Trans. on Power Apparatus and Systems,1983,102(11):3680-3686.
[3]
Liu W H E.,Wu F F,Lun S M.Estimation of parameter errors from measurement residuals in state estimation [J].IEEE Trans. on Power Systems,1992,7(1):81-89.
[4]
Mukherjee B,Fuerst G,Hanson S,et al.Transformer tap estimation:field experience[J].IEEE Trans. on Power Apparatus and Systems,1984,103(6):1454-1458.
[5]
陈晓刚,易永辉,江全元,等.基于 WAMS/ SCADA混合量测的电网参数辨识与估计[J].电力系统自动化,2008,32(5):1-5. Chen Xiaogang,Yi Yonghui,Jiang Quanyuan,et al.Network parameter identification and estimation based on hybrid measurement of WAMS/SCADA [J].Automation of Electric Power Systems,2008,32(5):1-5(in Chinese).
[6]
Quintana V,Van Cutsem T.Real-time processing of transformer tap positions[J].Canadian Journal of Electrical and Computer Engineering,1987,12(4):171-180.
[7]
Smith R.Transformer tap estimation at Florida power corporation[J].IEEE Trans. on Power Apparatus and Systems,1985,104(12):3442-3445.
[8]
Van Cutsem T,Quintana V.Network parameter estimation using online data with application to transformer tap position estimation[J].Proceedings of the Institution of Electrical Engineers,1988,135(1):31-40.
[9]
Liu W,Lim S.Parameter error identification and estimation in power system state estimation[J].IEEE Trans. on Power Systems,1995,10(1):200-209.
[10]
Alsac O,Vempati N,Stott B,et al.Generalized state estimation[J].IEEE Trans. on Power Systems,1998,13(3):1069-1075.
[11]
宁辽逸,孙宏斌,吴文传,等.基于状态估计的电网支路参数估计方法[J].中国电机工程学报,2009,29(1):7-12. Ning Liaoyi,Sun Hongbin,Wu Wenchuan,et al.State estimation based branch parameter estimation method for power grid[J].Proceedings of the CSEE,2009,29(1):7-12(in Chinese)
[12]
Zhu J,Abur A.Identification of network parameter errors[J].IEEE Trans. on Power Systems,2006,21(2):586-592.
[13]
Zhu J,Abur A.Improvement in network parameter error identification via synchronized phasors[J].IEEE Trans. on Power Systems,2010,24(1):44-50.
[14]
郭烨,张伯明,吴文传.拉格朗日乘子法网络参数错误辨识研究[J].中国电机工程学报,2013,33(7):86-91. Guo Ye,Zhang Boming,Wu Wenchuan.Research on the network parameter error identification by lagrange multiplier method[J].Proceedings of the CSEE,2013,33(7):86-91(in Chinese).
[15]
Broussolle F.State estimation in power system:detecting bad data through the sparse inverse matrix method [J].IEEE Trans. on Power Apparatus and Systems,1980,97(3):678-682.
[16]
郭烨,张伯明,吴文传,等.直角坐标下含零注入约束的电力系统状态估计修正牛顿法[J].中国电机工程学报,2012,32(19):96-100. Guo Ye,Zhang Boming,Wu Wenchuan,et al.Power system state estimation solution with zero injection constraints using modified newton method[J].Proceedings of the CSEE,2012,32(19):96-100(in Chinese).
[17]
郭烨,吴文传,张伯明,等.极坐标下含零注入约束的电力系统状态估计的修正牛顿法与快速解耦估计[J].中国电机工程学报,2012,32(22):113-117. Guo Ye,Wu Wenchuan,Zhang Boming,et al.Power system state estimation solution with zero injection constraints using modified newton method and fast decoupled method in polar coordinate[J].Proceedings of the CSEE,2012,32(22):113-117(in Chinese).
[18]
杨滢,孙宏斌,张伯明,等.集成于EMS中的参数估计软件的开发与应用[J].电网技术,2006,30(4):43-49. Yang Ying,Sun Hongbin,Zhang Boming,et al.Development and application of parameter estimation software integrated into EMS[J].Power System Technology,2006,30(4):43-49(in Chinese).
[19]
Liu W H E,Wu F F,Liu S M.Parameter error identification and estimation in power system state estimation[J].IEEE Trans. on Power Systems,2006,21(2):586-592.
[20]
Anderson P M,Fouad A A.Power system control and stability[M].Ames,Iowa:The Iowa State University Press,1977:37-39.
[21]
吴文传,郭烨,张伯明.指数型目标函数电力系统抗差状态估计[J].中国电机工程学报,2011,31(4):67-71. Wu Wenchuan,Guo Ye,Zhang Boming.A robust state estimation method with exponential objective function [J].Proceedings of the CSEE,2011,31(4):67-71(in Chinese).