考虑风速变化特性的风电容量可信度评估方法

, PP. 18-26

Keywords: 风力发电,风速变化特性,容量可信度,半不变量法,拉丁超立方采样

Full-Text   Cite this paper   Add to My Lib

Abstract:

随着风力发电在电网中穿透水平的提高,风力发电的容量可信度评估问题逐渐成为电网规划中关注的新热点。为描述风电出力与电网负荷的相关性,以规划阶段风电场可获得的数据为基础,基于半不变量法建立了考虑风速变化特性的风电出力模型;提出了基于拉丁超立方采样(Latinhypercubesampling,LHS)的风力发电容量可信度评估方法,通过对IEEE-RTS79系统进行评估验证了该方法的正确性和有效性,并分析了风电出力与电网负荷的相关性对容量可信度的影响。评估结果可作为风力发电参与电力平衡的重要依据。

References

[1]  中华人民共和国国家发展和改革委员会.可再生能源发展?十二五?规划[R].北京:中华人民共和国国家发展和改革委员会,2011. National Development and Reform Commission.The 12th 5-year planning of renewable energy[R].Beijing:National Development and Reform Commission,2011(in Chinese).
[2]  Integration of Variable Generation Task Force.Accommodating high levels of variable generation [R].Princeton:North American Electric Reliability Corporation,2009.
[3]  Perez R,Taylor M,Hoff T,et al.Moving toward consensus on a photovoltaic generation capacity valuation methodology[R].Washington:United States Department of Energy,2008.
[4]  梁双,胡学浩,张东霞,等.光伏发电置信容量的研究现状与发展趋势[J].电力系统自动化,2011,35(19):101-107. Liang Shuang,Hu Xuehao,Zhang Dongxia,et al.Current status and development trend of capacity credit of photovoltaic generation[J].Automation of Electric Power Systems,2011,35(19):101-107(in Chinese).
[5]  Milligan M.Modeling utility-scale wind power plants, part 2:capacity credit[R].Golden:National Renewable Energy Laboratory(NREL),2002.
[6]  Jain A,Choi J,Kim B.Impact of integrating the photovoltaic and wind energy sources on generation system reliability and operation economics[C]// International Conference on Power System Technology.Perth,Australia:IEEE PES,2002:2437-2442.
[7]  王海超,鲁宗相,周双喜.风电场发电容量可信度研究[J].中国电机工程学报,2005,22(10):103-106. Wang Haicha,Lu Zongxiang,Zhou Shuangxi.Research on the capacity credit of wind energy resources [J].Proceedings of the CSEE,2005,22(10):103-106(in Chinese).
[8]  张硕,李庚银,周明.考虑输电线路故障的风电场容量可信度计算.中国电机工程学报,2010,30(16):19-25. Zhang Shuo,Li Gengyin,Zhou Ming.Calculation of wind-farm capacity credit considering transmission line faults[J].Proceedings of the CSEE,2010,30(16):19-25(in Chinese).
[9]  申洪,梁双,方鑫,等.间歇式电源容量可信度计算方法研究[R].北京:中国电力科学研究院,2010. Shen Hong,Liang Shuang,Fang Xin,et al.The research on capacity credit evaluation of intermittent energy [J].Beijing:China Electric Power Research Institute,2010(in Chinese).
[10]  丁明,吴义纯,张立军.风电场风速概率分布参数计算方法的研究[J].中国电机工程学报,2005,25(10):107-110. Ding Ming,Wu Yichun,Zhang Lijun.Study on the algorithm to the probabilistic distribution parameters of wind speed in wind farms[J].Proceedings of the CSEE,2005,25(10):107-110(in Chinese).
[11]  Yi Gao.Adequacy assessment of composite generation and transmission systems incorporating wind energy conversion systems[D].Saskatoon:University of Saskatchewan,2010.
[12]  Billinton R B.A sequential simulation method for the generating capacity adequacy evaluation of small stand-alone wind energy conversion systems[C]//IEEE CCECE02 Proceedings.Winnipeg,Manitoba,Canada:IEEE Canada Association,2002.
[13]  杨轶雷,姚鹏,郭小波.基于时序和随机风速模型的含风电场发电系统充裕性评估[J].现代电力,2012,29(1):72-76. Yang Yilei,Yao Peng,Guo Xiaobo.Adequacy evaluation of power generation system with wind farm based on sequential and stochastic wind speed models[J].Modern Electric Power,2012,29(1):72-76(in Chinese).
[14]  全国能源基础与管理标准化技术委员会新能源和可再生能源分技术委员会.GB/T 18710-2002风电场风能资源评估方法[S].北京:中国标准出版社,2002. National Technical Committee on Energy Fundamentals and Management of Standardization Administration of China-New and Renewable Energy Subcommittee.GB/T 18710-2002 Methodology of wind energy resource assessment for wind farm[S].Beijing:China Standard Press,2002(in Chinese).
[15]  杜燕军,冯长青.风电场代表年风速计算方法的分析[J].可再生能源,2010,28(1):105-108. Du Yanjun,Feng Changqing.Analysis on different computing method of wind speed of the representative year in wind farm[J].Renewable Energy Resources,2010,28(1):105-108(in Chinese).
[16]  龚伟俊,李为相,张广明.基于威布尔分布的风速概率分布参数估计方法[J].可再生能源,2011,29(6):20-23. Gong Weijun,Li Weixiang,Zhang Guangming.The estimation algorithm on the probabilistic distribution parameters of wind speed based on Weibull distribution [J].Renewable Energy Resources,2011,29(6):20-23(in Chinese).
[17]  王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990:138-149. Wang Xifan.Power system optimization planning [M].Beijing:China Water Power Press,1990:138-149(in Chinese).
[18]  王敏,丁明.含大型太阳能发电系统的极限传输容量概率计算[J].电力系统自动化,2010,34(7):31-35. Wang Min,Ding Ming.Probabilistic calculation of total transfer capability including large-scale solar park [J].Automation of Electric Power Systems,2010,34(7):31-35(in Chinese).
[19]  Hill G W,Davis A W.Generalized asymptotic expansions of Corner-Fisher type[J].The Annals of Mathematical Statistics,1968,39(4):1264-1273.
[20]  陈树勇.大型并网风力发电场规划方法研究[D].北京:中国电力科学研究院,1998. Chen Shuyong.Methodology study on grid connected wind power planning[D].Beijing:China Electric Power Research Institute,1998(in Chinese).
[21]  张硕,李庚银,周明,等.风电场可靠性建模[J].电网技术,2009,33(13):37-41,53. Zhang Shuo,Li Gengyin,Zhou Ming,et al.Reliability modeling of large-scale wind farms[J].Power System Technology,2009,33(13):37-41,53(in Chinese).
[22]  Billinton R,Allan R.Reliability evaluation of power systems[M].2nd ed.New York:Plenum Press,1996:21-24.
[23]  Mckay M D,Beckman R J,Conover W J.A comparison of three methods for selecting values of input variables in the analysis of output from a computer code [J].Technometrics,1979,21(2):239-245.
[24]  于晗,钟志勇,黄杰波,等.基于拉丁超立方采样的电力系统概率潮流计算方法[J],2009,33(21):32-35,81. Yu Han,Zhong Zhiyong,Huang Jiebo,et al.A probabilistic load flow calculation method with Latin hypercube sampling[J].Automation of Electric Power Systems,2009,33(21):32-35,81(in Chinese).
[25]  龚光鲁.概率论与数理统计[M].北京:清华大学出版社,2003:289. Gong Guanglu.Probabilistic theory and mathematical statistics[M].Beijing:Tsinghua University Press,2003:289(in Chinese).