Stadlin W O.Economic Allocation of regulating margin [J].IEEE Transactions on Power Apparatus and Systems,1971,90(4):1776-1781.
[2]
Lee F N,Breipohl A M.Reserve constrained economic dispatch with prohibited operating zones[J]. IEEE Transactions on Power Systems,1993,8(1):246-254.
[3]
Wood A J,Wollenberg B F.Power generation,operation,and control[M].北京:清华大学出版社,2003:12. Wood A J,Wollenberg B F.Power generation,operation,and control[M].Beijing:Tsinghua University Press,2003:12(in English).
[4]
杨明,韩学山,梁军,等.基于等响应风险约束的动态经济调度[J].电力系统自动化,2009,33(1):14-17. Yang Ming,Han Xueshan,Liang Jun,et al.Dynamic economic dispatch with equal response risk constraints [J].Automation of Electric Power Systems,2009,33(1):14-17(in Chinese).
[5]
张国强,吴文传,张伯明.考虑风电接入的有功运行备用协调优化[J].电力系统自动化,2011,35(12):15-19. Zhang Guoqiang,Wu Wenchuan,Zhang Boming.Optimization of operation reserve coordination considering wind power integration[J].Automation of Electric Power Systems,2011,35(12):15-19(in Chinese).
[6]
Gooi H B,Mendes D P,Bell K R W,et al.Optimal scheduling of spinning reserve[J].IEEE Transactions on Power Systems,1999,14(4):1485-1490.
[7]
Wu H,Gooi H B.Optimal scheduling of spinning reserve with ramp constraints[J].IEEE Transactions on Power Systems,1999,2:785-790.
[8]
张兴芳,管恩瑞,孟广武.区间值模糊综合评判及其应用[J].系统工程理论与实践,2001,21(12):81-84. Zhang Xingfang,Guan Enrui,Meng Guangwu.Interval- valued fuzzy comprehensive evaluation and its application [J].System Engineering-Theory&Practice,2001,21(12):81-84(in Chinese).
[9]
Bouffard F and Galiana F D.Stochastic security for operations planning with significant wind power generation[J].IEEE Transactions on Power Systems,2008,23(2):306-316.
[10]
Wood W G.Spinning reserve constrained static and dynamic economic dispatch[J].IEEE Transactions on Power Apparatus and Systems,1982,101(2):381-388.
[11]
Bobo D R,Mauzy D M,Trefny F J.Economic generation dispatch with responsive spinning reserve constraints [J].IEEE Transactions on Power Systems,1994,9(1):555-559.
[12]
孟祥星,韩学山.一种新的计及备用约束的调度模型[J].电网技术,2005,29(14):20-25. Meng Xiangxing,Han Xueshan.A novel dispatching model considering reserve constraint[J].Power System Technology,2005,29(14):20-25(in Chinese).
[13]
蓝庆华,任震.基于等风险约束的机组日运行调度[J].中国电机工程学报,1993,13(3):35-40. Lan Qinghua,Ren Zhen.Daily unit operation dispatch with equal risk constraints[J].Proceedings of the CSEE,1993,13(3):35-40(in Chinese).
[14]
Billinton R,Allan R N.Reliability evaluation of power systems[M].New York:Plenum,1996.
[15]
Ortega-Vazqez M A,Kirschen D S.Optimizing the spinning reserve requirements using a cost/benefit analysis [J]. IEEE Transactions on Power Systems,2007,22(1):24-33.
[16]
Ortega-Vazqez M A,Kirschen D S.Estimating the spinning reserve requirements in systems with significant wind power generation penetration[J].IEEE Transactions on Power Systems,2009,24(1):114-124.
[17]
杨明,韩学山,梁军,等.计及用户停电损失的动态经济调度方法[J].中国电机工程学报,2009,29(31):103-108. Yang Ming,Han Xueshan,Liang Jun,et al.Novel solution to dynamic economic dispatch considering customer interruption costs[J].Proceedings of the CSEE,2009,29(31):103-108(in Chinese).
[18]
齐先军,丁明.发电系统中旋转备用方案的风险分析和效用决策[J].电力系统自动化,2008,32(3):9-13. Qi Xianjun,Ding Ming.Risk analysis and utility decision-making of spinning reserve scheme in power generating system[J].Automation of Electric Power Systems,2008,32(3):9-13(in Chinese).
[19]
姚瑶,于继来.计及风电备用风险的电力系统多目标混合优化调度[J].电力系统自动化,2011,35(22):118-123. Yao Yao,Yu Jilai.Multi-objective hybrid optimal dispatch of power systems considering reserve risk due to wind power[J].Automation of Electric Power Systems,2011,35(22):118-123(in Chinese).
[20]
刘宝碇,赵瑞清,王纲.不确定规划及应用[M].北京:清华大学出版社,2003. Liu Baoding,Zhao Ruiqing,Wang Gang.Uncertain programming with applications[M].Beijing:Tsinghua University Press,2003(in Chinese).
[21]
康重庆,夏清,徐玮.电力系统不确定分析[M].北京:科学出版社,2011:1-8. Kang Chongqing,Xiaqing,Xuwei.Power system uncertainty analysis[M].Beijing:Science Press,2011:1-8(in Chinese).
[22]
蒋峥,刘斌.不确定优化问题的研究动向[J].武汉科技大学学报,2006,29(6):599-602. Jiang Zheng,Liu Bin.Latest researches in optimization under uncertainty[J].Journal of Wuhan University of Science&Technology,2006,29(6):599-602(in Chinese).
[23]
Wu Lei,Shahidehpour M,Li Zuyi.Comparison of scenario-based and interval optimization approaches to stochastic SCUC[J].IEEE Transactions on Power Systems,2012,27(2):913-921.
[24]
王守相,徐群,张高磊,等.风电场风速不确定性建模及区间潮流分析[J].电力系统自动化,2009,33(21):82-86. Wang Shouxiang,Xu Qun,Zhang Gaolei,et al.Modeling of wind speed uncertainty and interval power flow analysis for wind farms[J].Automation of Electric Power Systems,2009,33(21):82-86(in Chinese).
[25]
胡启洲.区间数理论的研究及其应用[M].北京:科学出版社,2010. Hu Qizhou.Interval analysis with applications [M].Beijing:Science Press,2010(in Chinese).
[26]
韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16. Han Xueshan,Liu Zhuo.Optimal unit commitment considering unit?s ramp-rate limits[J].Power System Technology,1994,18(6):11-16(in Chinese).