[1] | 丁明,罗初田. 运行备用可靠性指标计算[J]. 中国电机工程学报, 1991,11(3):51-58. Ding Ming,Luo Chutian.Calculation of the reliability indices for operation reserve[J].Proceedings of the CSEE,1991,11(3)
|
[2] | 赵渊,周家启,周念成,等. 大电力系统可靠性评估的解析计算模型[J]. 中国电机工程学报, 2006,26(5):19-25. Zhao Yuan,Zhou Jiaqi,Zhou Niancheng,etc.An analytical approach for bulk power systems reliability assessment[J].Proceedings of the CSEE,2006,26(5)
|
[3] | Billiton R,Allan R N. Reliability evaluation of engineering systems: concepts and techniques[M]. New York and London:Plenum Press, 1983:124-167.
|
[4] | 郭永基. 电力系统可靠性分析[M]. 北京:清华大学出版社, 2003:169-171. Guo Yongji.Power system reliability analysis [M].Beijing:TsinghuaUniversity Press,2003(in Chinese)
|
[5] | 李文沅. 电力系统风险评估模型、方法和应用[M]. 北京:科学出版社, 2006:10-34. Li Wenyuan.Risk assessment of power systems [M].Beijing:SciencePress,2006(in Chinese)
|
[6] | Gulachenski E M,Besuner P M. Transformer failure prediction using Bayesian analysis[J]. IEEE Transactions on Power Systems, 1990,5(4):1355-1363.
|
[7] | Wan Hua,Mccalley J D,Vittal V. Increasing thermal rating by risk analysis[J]. IEEE Transactions on Power Systems, 1999,14(3):815-828.
|
[8] | Pathak J,Yong Jiang,Honavar V,et al. Condition data aggregation with application to failure rate calculation of power transformers[J]. Proceedings of the 39th Hawaii International Conference on System Sciences, Hawaii,USA,2006,10:241a-251a.
|
[9] | 宁辽逸,吴文传,张伯明. 电力系统运行风险评估中元件时变停运模型分析[J]. 电力系统自动化, 2009,33(16):7-12. Ning Liaoyi,Wu Wenchuan,Zhang Boming.Analysis of a time-varying power component outage model for operation risk assessment[J].Automation of Electric Power Systems,2009,33(16)
|
[10] | Abu-Elanien A E B,Salama M M A,Bartnikas R. A techno-economic method for replacing transformers [J]. IEEE Transactions on Power Delivery, 2011,26(2):817-829.
|
[11] | Retterath B,Venkata S S,Chowdhury A A. Impact of time-varying failure rates on distribution reliability[C]// 8th International Conference on Probabilistic Methods Applied to Power Systems. Ames, Iowa:IEEE,2004:953-958.
|
[12] | 段东立,武小悦,邓宏钟. 基于时变故障率与服务恢复时间模型的配电系统可靠性评估[J]. 中国电机工程学报, 2011,31(28):57-64. Duan Dongli,Wu Xiaoyue,Deng Hongzhong.Reliability evaluation of distribution systems based on time-varying failure rate and service restoration time model [J].Proceedings of the CSEE,2011,31(28)
|
[13] | He Jian,Sun Yuanzhang,Wang Peng,et al. A hybrid conditions-dependent outage model of a transformer in reliability evaluation[J]. IEEE Transactions on Power Delivery, 2009,24(4):2025-2033.
|
[14] | Kuntz P A,Christie R D,Venkata S S. Optimal vegetation maintenance scheduling of overhead electric power distribution systems[J]. IEEE Transactions on Power Delivery, 2002,17(4):1164-1169.
|
[15] | Welte T M. Using state diagrams for modeling maintenance of deteriorating systems[J]. IEEE Transactions on Power Systems, 2009,24(1):58-66.
|
[16] | Abeygunawardane S K,Jirutitijaroen P. New state diagrams for probabilistic maintenance models[J]. IEEE Transactions on Power Systems, 2011,26(4):2207-2213.
|
[17] | Chen Yi,Wang Zhonglai,Qiu Jing,et al. Adaptive bathtub hazard rate curve modeling via transformed radial basis functions[J]. International Conference on Quality, Reliability,Risk,Maintenance,and Safety Engineering,2011:110-114.
|
[18] | Li Wenyuan,Vaahedi E,Choudhury P. Power system equipment aging[J]. IEEE Power and Energy Magazine, 2006,4(3):52-58.
|
[19] | Li Wenyuan. Incorporating aging failures in power system reliability evaluation[J]. IEEE Transactions on Power Systems, 2002,17(3):918-923.
|
[20] | Li Wenyuan. Evaluating mean life of power system equipment with limited end-of-life failure data[J]. IEEE Transactions on Power Systems, 2004,19(1):236-242.
|
[21] | Moon J F,Kim J C,Lee H T,et al. Reliability evaluation of distribution system through the analysis of time-varying failure rate[C]//Power Engineering Society General Meeting. Omaha, NE:IEEE,2004:668-673.
|
[22] | 刘嘉琨,王公恕. 应用随机过程[M]. 2版.北京:科学出版社, 2004:68-86. Liu Jiakun,Wang Gongshu.Application of stochastic process[M].Beijing:SciencePress,2004
|
[23] | Chaidee E,Tippachon W. Failure statistics and condition evaluation for power transformer maintenance[C]//Power and Energy Engineering Conference,Asia-Pacific (APPEEC). Beijing:IEEE, 2011:1-4.
|
[24] | Ning Liaoyi,Wu Wenchuan,Zhang Boming,etc. A time-varying transformer outage model for online operational risk assessment[J]. International Journal of Electric Power and Energy System, 2011,33(3):600-607.
|