全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

一种适用于可靠性评估的电网设备时变停运模型

, PP. 56-62

Keywords: 电网设备,可靠性评估,老化故障率,更新过程,停运模型

Full-Text   Cite this paper   Add to My Lib

Abstract:

需求响应是智能电网框架下的重要互动资源,在综合考虑供应侧和需求侧作用机理的基础上,将需求响应纳入发电调度,建立智能电网下计及用户侧互动的发电调度模型。考虑了用户用电模式的多样性和选择的意愿性,以基于消费者心理学的分时电价用户响应原理预测的负荷曲线为基础,考虑可中断备用与发电侧备用的协调优化,综合衡量各方利益,选取使发电成本最低的最优分时电价和最优可中断备用容量,并以此制定发电调度方案。IEEE24节点算例结果表明,所提模型有效降低了发电成本,证明了考虑用户侧互动下将发电侧和需求侧的资源进行综合规划有利于电力系统的安全经济运行。

References

[1]  丁明,罗初田. 运行备用可靠性指标计算[J]. 中国电机工程学报, 1991,11(3):51-58. Ding Ming,Luo Chutian.Calculation of the reliability indices for operation reserve[J].Proceedings of the CSEE,1991,11(3)
[2]  赵渊,周家启,周念成,等. 大电力系统可靠性评估的解析计算模型[J]. 中国电机工程学报, 2006,26(5):19-25. Zhao Yuan,Zhou Jiaqi,Zhou Niancheng,etc.An analytical approach for bulk power systems reliability assessment[J].Proceedings of the CSEE,2006,26(5)
[3]  Billiton R,Allan R N. Reliability evaluation of engineering systems: concepts and techniques[M]. New York and London:Plenum Press, 1983:124-167.
[4]  郭永基. 电力系统可靠性分析[M]. 北京:清华大学出版社, 2003:169-171. Guo Yongji.Power system reliability analysis [M].Beijing:TsinghuaUniversity Press,2003(in Chinese)
[5]  李文沅. 电力系统风险评估模型、方法和应用[M]. 北京:科学出版社, 2006:10-34. Li Wenyuan.Risk assessment of power systems [M].Beijing:SciencePress,2006(in Chinese)
[6]  Gulachenski E M,Besuner P M. Transformer failure prediction using Bayesian analysis[J]. IEEE Transactions on Power Systems, 1990,5(4):1355-1363.
[7]  Wan Hua,Mccalley J D,Vittal V. Increasing thermal rating by risk analysis[J]. IEEE Transactions on Power Systems, 1999,14(3):815-828.
[8]  Pathak J,Yong Jiang,Honavar V,et al. Condition data aggregation with application to failure rate calculation of power transformers[J]. Proceedings of the 39th Hawaii International Conference on System Sciences, Hawaii,USA,2006,10:241a-251a.
[9]  宁辽逸,吴文传,张伯明. 电力系统运行风险评估中元件时变停运模型分析[J]. 电力系统自动化, 2009,33(16):7-12. Ning Liaoyi,Wu Wenchuan,Zhang Boming.Analysis of a time-varying power component outage model for operation risk assessment[J].Automation of Electric Power Systems,2009,33(16)
[10]  Abu-Elanien A E B,Salama M M A,Bartnikas R. A techno-economic method for replacing transformers [J]. IEEE Transactions on Power Delivery, 2011,26(2):817-829.
[11]  Retterath B,Venkata S S,Chowdhury A A. Impact of time-varying failure rates on distribution reliability[C]// 8th International Conference on Probabilistic Methods Applied to Power Systems. Ames, Iowa:IEEE,2004:953-958.
[12]  段东立,武小悦,邓宏钟. 基于时变故障率与服务恢复时间模型的配电系统可靠性评估[J]. 中国电机工程学报, 2011,31(28):57-64. Duan Dongli,Wu Xiaoyue,Deng Hongzhong.Reliability evaluation of distribution systems based on time-varying failure rate and service restoration time model [J].Proceedings of the CSEE,2011,31(28)
[13]  He Jian,Sun Yuanzhang,Wang Peng,et al. A hybrid conditions-dependent outage model of a transformer in reliability evaluation[J]. IEEE Transactions on Power Delivery, 2009,24(4):2025-2033.
[14]  Kuntz P A,Christie R D,Venkata S S. Optimal vegetation maintenance scheduling of overhead electric power distribution systems[J]. IEEE Transactions on Power Delivery, 2002,17(4):1164-1169.
[15]  Welte T M. Using state diagrams for modeling maintenance of deteriorating systems[J]. IEEE Transactions on Power Systems, 2009,24(1):58-66.
[16]  Abeygunawardane S K,Jirutitijaroen P. New state diagrams for probabilistic maintenance models[J]. IEEE Transactions on Power Systems, 2011,26(4):2207-2213.
[17]  Chen Yi,Wang Zhonglai,Qiu Jing,et al. Adaptive bathtub hazard rate curve modeling via transformed radial basis functions[J]. International Conference on Quality, Reliability,Risk,Maintenance,and Safety Engineering,2011:110-114.
[18]  Li Wenyuan,Vaahedi E,Choudhury P. Power system equipment aging[J]. IEEE Power and Energy Magazine, 2006,4(3):52-58.
[19]  Li Wenyuan. Incorporating aging failures in power system reliability evaluation[J]. IEEE Transactions on Power Systems, 2002,17(3):918-923.
[20]  Li Wenyuan. Evaluating mean life of power system equipment with limited end-of-life failure data[J]. IEEE Transactions on Power Systems, 2004,19(1):236-242.
[21]  Moon J F,Kim J C,Lee H T,et al. Reliability evaluation of distribution system through the analysis of time-varying failure rate[C]//Power Engineering Society General Meeting. Omaha, NE:IEEE,2004:668-673.
[22]  刘嘉琨,王公恕. 应用随机过程[M]. 2版.北京:科学出版社, 2004:68-86. Liu Jiakun,Wang Gongshu.Application of stochastic process[M].Beijing:SciencePress,2004
[23]  Chaidee E,Tippachon W. Failure statistics and condition evaluation for power transformer maintenance[C]//Power and Energy Engineering Conference,Asia-Pacific (APPEEC). Beijing:IEEE, 2011:1-4.
[24]  Ning Liaoyi,Wu Wenchuan,Zhang Boming,etc. A time-varying transformer outage model for online operational risk assessment[J]. International Journal of Electric Power and Energy System, 2011,33(3):600-607.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133