[1] | Schrattenholzer L,Criqui P. A longer-term outlook on future energy systems[J]. International Journal of Global Energy Issues, 2000,14(1):348-373.
|
[2] | 杨宏伟. 应用AIM/Local中国模型定量分析减排技术协同效应对气候变化政策的影响[J]. 能源环境保护, 2004,18(2):1-4. Yang Hongwei,Quantitative analysis of impacts on China?s climate change policy from co-benefits of mitigation technologies by applying AIM/Local China model[J].Energy Environmental Protection,2004,18(2)
|
[3] | 邱立勋,陈愚,赵黛青,等. 广州市至2020年城市客运交通发展情景分析[J]. 中山大学学报:自然科学版, 2008,47(增刊):114-118. Qiu Lixun,Chen Yu,Zhao Daiqing,et al.Scenario analysis of passenger traffic development in Guangzhou until 2020[J].Acta Scientiarum Naturalium Universitatis Sunyatseni,2008,47(S)
|
[4] | 中国社会科学院城市与环境研究所新能源与可再生能源经济研究中心. 关于构建区域能源需求预测模型系统的初步思考[EB/OL]. http://www.nere.org.cn/nere/Show News.asp?News_Id=1201.[2012-1-.,
|
[5] | Capros P,Mantzos L,Petrellis D,et al. European Union, energy outlook to 2020[R]. Luxembourg:European Commission- Directorate general for energy, office for offcial publications of the European Community,1999.
|
[6] | Energy Information Administration(EIA). Annual energy outlook 2003 with projections to 2025,Energy Information Administration[R]. Washington DC:Office of Integrated Analysis and Forecasting, U.S. Department of Energy,2003.
|
[7] | RETScreen International. Empowering Cleaner Energy Decisions[EB/OL]. http://www.retscreen.net/ang/home. php.[2012-01-.,
|
[8] | 武亚非,包毅,杨丽徙. 含双馈风电机组的配电网运行模拟[J]. 郑州大学学报:工学版, 2011,32(4):64-67(in Chinese). Wu Yafei,Bao Yi,Yang Lixi.Operation simulation of distribution network containing double-fed induction wind generators[J].Journal of Zhengzhou University
|
[9] | Homer Energy. Software[EB/OL]. http://homerenergy. com/ software.html.[2012-2- .,
|
[10] | Homer Energy. Energy modeling software for hybrid renewable energy systems[EB/OL]. http://homer energy. com/index.html.[2012-2-.,
|
[11] | Boudri J C,Hordi jk L. The potential contribution of renewable energy in air pollution abatement in China and India[J]. Energy Policy, 2002,30(5):409-424.
|
[12] | Criqui P,Mima S,Viguier L. Margina1 abatement costs of CO2 emission reductions,geographical flexibility and concrete ceiling:an assessment using the POLES model[J]. Energy Policy, 1999,27(10):585-601.
|
[13] | Criqui P. World energy projections to 2030[J]. International Journal of Global Energy Issues, 2000,14(1-4):116-136.
|
[14] | Hadley S W,Short W. Electricity sector analysis in the clean energy futures study[J]. Energy Policy, 2001,29(14):1285-1298.
|
[15] | 朱然. 基于TIMES模型的电力行业控制CO2方案优选[D]. 北京:北京交通大学, 2011.Zhu Ran.Technical optimization for CO2 control in power industry: an analysis with the world-TIMES model[D].Beijing:BeijingJiaotong University,2011.
|
[16] | Dalton G J,Lockington D A,Baldock T E. Case study feasibility analysis of renewable energy supply options for small to medium-sized tourist accommodations[J]. Renewable Energy, 2009(34):1134-1144.
|
[17] | Dalton G J,Lockington D A,Baldock T E. Feasibility analysis of renewable energy supply options for a grid-connected large hotel[J]. Renewable Energy, 2009(34):955-964.
|
[18] | Giatrakos G P,Tsoutsos T D,Mouchtaropoulos P G,et al. Sustainable energy planning based on a stand-alone hybrid renewable energy/hydrogen power system:Application in Karpathos island,Greece[J]. Renewable Energy, 2009(34):2562-2570.
|
[19] | Weis T M,Llinca A. Assessing the potential for a wind power incentive for remote villages in Canada[J]. Energy Policy, 2010(38):5504-5511.
|
[20] | Nfah E M,Ngundam J M. Feasibility of pico-hydro and photovoltaic hybrid power systems for remote villages in Cameroon[J]. Renewable Energy, 2009(34):1445-1450.
|
[21] | Wies R W,JohnsonR A,Agrawal A N,et al. Simulink model for economic analysis and environmental impacts of a PV with diesel-battery system for remote village[J]. IEEE Transactions on Power Systems, 2005,20(2):692-700.
|
[22] | Kanase-Patil A B,Saini R P,Sharma M P. Integrated renewable energy systems for off grid rural electrification of remote area[J]. Renewable Energy, 2010(35):1342-1349.
|
[23] | 温鹏,沈炯,李益国,等. 基于自回归法的风电场脉动风速模拟[J]. 电网技术, 2009,33(5):75-79. Wen Peng,Sheng Jiong,Li Yiguo,et al.Simulation of turbulent wind speed in wind farm based on autoregression method[J].Power System Technology,2009,33(5)
|
[24] | 大气压和海拔的换算. http://wenku.baidu.com/view/ d9aa704e2b160b4e767fcffc. html[2011-11-.,
|
[25] | 杜燕军,冯长青. 风切变指数在风电场风资源评估中的应用[J]. 电网与清洁能源, 2010,26(5):62-66. Du Yanjun,Feng Changqing.Application of wind shear index in the assessment of wind resources of wind farm[J].Power System and Clean Energy,2010,26(5)
|
[26] | 胡毅,张健. 风资源评估中风速分布方法研究[J]. 内蒙古科技与经济, 2010(21):76-78. Hu Yi,Zhang Jian.Research on Wind Speed Distribution[J]. Inner Mongolia Science Technology & Economy,2010(21)
|