谢强,李杰.电力系统自然灾害的现状及对策[J].自然灾害学报,2006,15(4):126-131. Xie Qiang,Li Jie.Current situation of natural disaster in electric power system and counter measures[J].Journal of Natural Disaster,2006,15(4):126-131(in Chinese).
[2]
蒋正龙,陆佳政,雷红才,等.湖南2008 年冰灾引起的倒塔原因分析[J].高电压技术,2008,34(11):2468-2474. Jiang Zhenglong,Lu Jiazheng,Lei Hongcai,et al.Analysis of the causes of tower collapses in Hunan during the 2008 ice storm[J].High Voltage Engineering,2008,34(11):2468-2474(in Chinese).
[3]
Farzaneh M.电网的大气覆冰[M].北京:中国电力出版社,2010:153-156. Farzaneh M.Atmospheric icing of power networks [M].Beijing:China Electric Power Press,2010:153-156(in Chinese).
[4]
陈亦平,刘文涛,和识之,等.直流融冰装置在南方电网的应用分析[J].南方电网技术,2011,5(4):74-77. Chen Yiping,Lu Wentao,He Shizhi,et al.Analysis on the application of DC de-icer in China southern power grid[J].Southern Power System Technology,2011,5(4):74-77(in Chinese).
[5]
敬华兵,年晓红,罗文广.一种兼具融冰功能的柔性直流电流换流站的研究[J].中国电机工程学报,2012,32(19):65-73. Jing huabing,Nian Xiaohong,Luo Wenguang.Research on a VSC-HVDC converter station with ice-melting function[J].Proceedings of the CSEE,2012,32(19):65-73(in Chinese).
[6]
敬华兵,年晓红,范瑞祥,等.直流融冰覆冰线路全控直流融冰电源及其控制切换策略[J].电力系统自动化,2012,36(13):86-91. Jing huabing,Nian Xiaohong,Fan Ruixiang,et al.A power system fault diagnosing model based on protective relay time-space relation[J].Automation of Electric Power Systems,2012,36(13):86-91(in Chinese).
[7]
Wang Juanjuan,Fu Chuang,Chen Yiping,et al.Research and application of DC de-icing technology in China southern power grid[J].IEEE Transactions on Power System,2012,27(3):1234-1242.
[8]
Chao Wang,Jun Wen,Shuqi Li,et al.Design on DC de-icing schemes for high voltage transmission line[C]// Internation Conference on Critical Infrastructure.Beijing:IEEE,2010:1-5.
[9]
Fang Ruixiang,Wu Sunong.A new type of DC de-icing system for transmission lines[C]//Internation Conference on Electrical Control Engineering.Wuhan:IEEE,2010:4916-4919.
[10]
敬华兵,年晓红.兼具STATCOM功能的混合型直流融冰电源[J].电力系统自动化,2013,37(12):114-119. Jing huabing,Nian Xiaohong.Hybrid Ice-melting power supply with STATCOM function[J].Automation of Electric Power Systems,2013,37(12):114-119(in Chinese).
[11]
Jones K F,Ramsay A C,Lott J N.Icing severity in the December 2002 freezing rain storm from ASOS data [J].Monthly Weather Review,2004,132(7):1630-1644.
[12]
谢云云,薛禹胜,文福拴,等.冰灾对输电线故障概率影响的时空评估[J].电力系统自动化,2013,37(18):32-41. Xie Yunyun,Xue Yusheng,Wen Fushuan,et al.Space-time evaluation for impact of ice disaster on transmission line fault probability[J].Automation of Electric Power Systems,2013,37(18):32-41.
[13]
Krishnasamy S G,Assessment of weather induce transmission line load on a probabilistic basis[J].IEEE Trans. on Power Apparatus and Systems,1985(104):2510-2516.
[14]
International Electro-technical Commission.CEI/IEC 60826:2003,Design criteria of overhead transmission lines[S].Switzerland:NYSE,2003.
[15]
刘文涛,和识之,陈亦平,等.基于直流融冰的电网大面积冰灾防御策略[J].电力系统自动化,2012,36(11):102-107. Liu Wentao,He Shizhi,Chen Yiping,et al.Defensive strategy for wide area ice disaster of power grid based on DC deicer[J].Automation of Electric Power Systems,2012,36(11):102-107(in Chinese).
[16]
张大波,李文沅,熊小伏.基于状态监测的多目标双层优化待修架空线选择模型[J].电力系统自动化,2013,37(2):23-27. Zhang Dabo,Li Wenyuan,Xiong Xiaofu.Multi-objective two-layer optimization model for overhead line maintenance selection based on condition monitoring [J].Automation of Electric Power Systems,2013,37(2):23-27(in Chinese).
[17]
任子武,伞冶.自适应遗传算法的改进及在系统辨识中应用研究[J].系统仿真学报,2006,18(1):41-43. Ren Ziwu,San Ye.Improved adaptive genetic algorithm and its application research in parameter identification [J].Journal of System Simulation,2006,18(1):41-43(in Chinese).
[18]
Reliability Test System Task Force.The IEEE reliability test system 1996[J].IEEE Trans.on Power Systems,1999,14(3):1010-1020.
[19]
孙元章,程林,何剑.电力系统运行可靠性理论[M].北京:清华大学出版社,2012:191-202. Sun Yuanzhang,Cheng Lin,He Jian.Power system operational reliability theory[M].Beijing:Tsinghua University Press,2012:191-202.
[20]
饶宏,李立浧,黎小林,等.南方电网直流融冰技术研究[J].南方电网技术,2008,2(2):7-12. Rao Hong,Li Licheng,Li Xiaolin,et al.Study of DC based de-icing technology in China southern power grid [J].Southern Power System Technology,2008,2(2):7-12(in Chinese).
[21]
国家电网公司.Q/GDW 179-2008:110~750 kV架空输电线路设计技术规定及条文说明[S].北京:中国电力出版社,2008. State Grid.Q/GDW 179-2008:Technical code for design of 110~750 kV overhead transmission line[S].Beijing:China Electric Power Press,2008(in Chinese).