220kV电网电流行波测距装置的优化布点方法

DOI: 10.13334/j.0258-8013.pcsee.2014.34.028, PP. 6246-6253

Keywords: 行波测距,可观测性分析,布点优化,0-1规划,扩展邻接矩阵,加权可测线长

Full-Text   Cite this paper   Add to My Lib

Abstract:

220kV电网的站、线数量较多,电网拓扑复杂,如何经济、合理地配置220kV线路的故障行波测距装置,实现故障测距功能的全覆盖,具有重要意义。该文分析线路故障电流行波可测性,采用扩展邻接矩阵对输电网各回线路和站际间的连接关系进行抽象。以工程实际条件与可测性分析结果相结合作为必要的附加条件,将电流行波测距装置在电网的优化布置抽象为含不等式和等式约束的线性0-1规划模型,进而确定模型参数与电网拓扑参数的关系及模型求解方法,获得行波测距装置的全网最优静态布置方案。在此基础上,以每退出一套行波测距装置导致单、双端测距原理所减少的直接与间接可测线路的加权长度最小为依据,确定行波测距装置的动态装设顺序。并以某220kV实际电网为例,验证所提算法的可行性及有效性。

References

[1]  陈平,徐丙垠,李京,等.现代行波故障测距装置及其运行经验[J].电力系统自动化,2003,27(6):66-69. Chen Ping,Xu Bingyin,Li Jing,et al.Modern traveling wave based fault locator and its operation experience [J].Automation of Electric Power Systems,2003,27(6):66-69(in Chinese).
[2]  谢民.220 kV电网行波测距系统组网运行实践探讨[J].电力自动化设备,2010,30(5):135-138,141. Xie Min.Networking operation practice of traveling wave based fault locating system for 220 kV grid[J].Electric Power Automation Equipment,2010,30(5):135-138,141(in Chinese).
[3]  董新洲,葛耀中,徐丙垠.利用暂态电流行波的输电线路故障测距研究[J].中国电机工程学报,1999,19(4):76-80. Dong Xinzhou,Ge Yaozhong,Xu Bingyin.Research of fault location based on current travelling waves [J].Proceedings of the CSEE,1999,19(4):76-80(in Chinese).
[4]  覃剑,陈祥训,郑健超,等.利用小波变换的双端行波测距新方法[J].中国电机工程学报,2000,20(8):6-10. Qin Jian,Chen Xiangxun,Zheng Jianchao,et al.A new double terminal method of travelling wave fault location using wavelet transform[J].Proceedings of the CSEE,2000,20(8):6-10(in Chinese).
[5]  王志华,尹项根,张小波,等.利用CVT捕捉电压行波实现故障测距的分析与实践[J].电力系统自动化,2004,28(22):63-68. Wang Zhihua,Yin Xianggen,Zhang Xiaobo,et al.Analysis and practice of fault location by voltage traveling wave of CVT[J].Automation of Electric Power Systems,2004,28(22):63-68(in Chinese).
[6]  吴刚,林湘宁.通用行波测距修正方法[J].中国电机工程学报,2011,31(34):142-149. Wu Gang,Lin Xiangning.Generalized amending method on fault location algorithms based on traveling waves [J].Proceedings of the CSEE,2011,31(34):142-149(in Chinese).
[7]  张广斌,束洪春,于继来.基于Hough 变换直线检测的行波波头标定[J].中国电机工程学报,2013,33(19):165-173(in Chinese). Zhang Guangbin,Shu Hongchun,Yu Jilai.Surge identification for travelling wave based on straight lines detection via Hough transform[J].Proceedings of the CSEE,2013,33(19):165-173(in Chinese).
[8]  Xu B,Abur A.Observability analysis and measurement placement for systems with PMUs[C]//IEEE Power Systems Conference and Exposition.USA:IEEE,2004:943-946.
[9]  蒋正威,曹一家,孙维真.基于0-1整数规划的多目标最优PMU配置算法[J].电力系统保护与控制,2008,36(21):12-17. Jiang Zhengwei,Cao Yijia,Sun Weizhen.Multi-object PMU optimization placement algorithm based on 0-1 integer program[J].Power System Protection and Control.2008,36(21):12-17(in Chinese).
[10]  Mohammadi-Ivatloo B.Optimal placement of PMUs for power system observability using topology based formulated algorithms[J].Journal of Applied Sciences 2009,9(13):2463-2468.
[11]  邓丰,陈楠,曾祥君,等.基于图论的电网故障行波定位装置最优配置算法[J].电力系统自动化,2010,34(11):87-92. Deng Feng,Chen Nan,Zeng Xiangjun,et al.An optimal configuration algorithm for traveling wave fault location equipments in power grid based on graph theory [J].Automation of Electric Power Systems,2010,34(11):87-92(in Chinese).
[12]  李泽文,姚建刚,曾祥君,等.基于整个电网行波时差的故障定位方法[J].中国电机工程学报,2009,29(4):60-64. Li Zewen,Yao Jiangang,Zeng Xiangjun,et al.Fault location based on traveling wave time difference in power grid[J].Proceedings of the CSEE,2009,29(4):60-64(in Chinese).
[13]  黄绪勇,张文魁,刘沛.电网行波故障定位装置的最优化配置及其改进算法[J].电力自动化设备,2010,30(1):41-44. Huang Xuyong,Zhang Wenkui,Liu Pei.Optimal placement of travelling wave fault locating equipment and its improved algorithm[J].Electric Power Automation Equipment.2010,30(1):41-44(in Chinese).
[14]  Korkail M,Abur A.Optimal deployment of wide-area synchronized measurements for fault-location observability[J].IEEE Transactions Power Systems,2013,28(1):482-489.
[15]  蔡耀先.关于任意图的矩阵[J].解放军测绘学院学报,1987(2):53-58. Cai Yaoxian.On the matries of arbitary graph[J].Journal of Geomatics Science and Technology,1987(2):53-58(in Chinese).
[16]  梁应仙,姜岚.图的矩阵表示方法的双向推广[J].沈阳大学学报,2001,13(2):88-91. Liang Yingxian,Jiang Lan.Several deduced definitions of adjacency matrix[J].Journal of Shenyang University,2001,13(2):88-91(in Chinese).
[17]  迪斯特尔.图论[M](第4版).于青林,王涛,王光辉,译.北京:高等教育出版社,2013,25-26. Diestel.Graph theory (Fourth edtion)[M].Yu Qinglin,Wang Tao,Wang Guanghui,Translated.Beijing:Higher Education Press,2013,25-26(in Chinese).
[18]  吴建春.数学规划[M].北京:中国水利水电出版社,1996:91-95. Wu Jianchun.Mathematical programming[M].Beijing:China Water & Power Press,1996:91-95(in Chinese).
[19]  范明天,张祖平.电力系统优化数学模型和计算方法[M].北京:中国电力出版社,2013:280-281. Fan Mingtian,Zhang Zuping.Mathematical model and numerical method for power system optimizations [M].Beijing:China Electric Power Press,2013:280-281(in Chinese).
[20]  王靖然,余贻鑫,曾沅.基于隐枚举的输电网规划局部搜索策略[J].中国电机工程学报,2011,31(1):39-45. Wang Jingran,Yu Yixin,Zeng Yuan.Local search strategy based on implicit enumeration for transmission expansion planning[J].Proceedings of the CSEE,2011,31(1):39-45(in Chinese).
[21]  黄雍检,陶冶,钱祖平.最优化方法:MATLAB应用[M].北京:人民邮电出版社,2010:24-44. Huang Yongjian,Tao Ye,Qian Zuping.Optimization methods: application of MATLAB[M].Beijing:Post &Telecom Press,2010:24-44(in Chinese).
[22]  郭键.图的可达性矩阵的一种新求法[J]. 数学的实践与认识,2009,39(12):223-225. Guo Jian.Research on computing the reachability matrix of directed graph[J].Mathematics in Practice and Theory,2009,39(12):223-225(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133