输电线路覆冰后,将引发断线倒塔事故,严重威胁电网的安全运行。其覆冰受气温、风速、水滴直径和导线结构的影响,为研究这些因素影响导线覆冰的规律,在导线覆冰理论计算研究的基础上,利用有限元软件二次开发功能,编制了导线覆冰过程中过冷却水滴碰撞导线的数值模型,该模型将反馈的两随机水滴位置插值到网格节点上,最终获得过冷却水滴局部碰撞位置,实现对导线覆冰过程的模拟。通过对不同覆冰影响因素的计算,总结了覆冰强度、局部碰撞率与气温、风速、水滴直径之间的相互关系。最后进行了导线覆冰模拟试验,试验结果与数值计算结果吻合较好,表明模型正确有效,可用于导线覆冰的预测。

References

[1]  Gent R W.TRAJICE2-A combined water droplet trajectory and ice accretion prediction program for aerofoil[R].Holland:Kluwer Academic Publishers,1990.
[2]  Paraschivoiu I,Tran P,Brahimi M T,et al.Prediction of ice accretion with viscous effects on aircraft wings [J].AIAA Journal of Aircraft,1994,31(4):855-861.
[3]  Habashi W G.Putting computer on ice[J].ICAO Journal,1995,50(7):14-17.
[4]  Zhang Dalin,Chen Weijian.Numerical simulation of the rime ice accretion process on airfoil[J].Journal of Aerospace Power,2004,19(1):137-141.
[5]  Bazeos N,Beskos D E.Numerical determination of wind pressure on 2-D structures[M].Germany:Computational Mechanics Publications,1990:35-68.
[6]  Fu P,Farzaneh M.Two dimensional modeling of the ice accretion process on transmission line wires and conductors[J].Cold Regions Science and Technology,2006,46(2):132-146.
[7]  周灿梅,陆佳政,向永嘉,等.基于线搜索算法的输电线路覆冰厚度检测[J].仪表技术与传感器,2010(8):25-31. Zhou Canmei,Lu Jiazheng,Xiang Yongjia,et al.Detection of ice thickness covered over transmission line based on line search algorithm[J].Instrument Technique and Sensor,2010(8):25-31(in Chinese).
[8]  李政敏,庾振平,胡琰锋,等.输电线路覆冰的危害及防护[J].电磁避雷器,2006,21(2):12-14. Li Zhengmin,Yu Zhenping,Hu Yanfeng,et al.Transmission line regelation harm and protection [J].Insulators and Surge Arresters,2006,21(2):12-14(in Chinese).
[9]  宋尖,陆佳政,李波,等.基于模糊识别和神经网络的电网覆冰长期预测方法[J].湖南电力,2011,31(6):7-9. Song Jian,Lu Jiazheng,Li Bo,et al.Low-term prediction method of power grid icing base on fuzzy analysis and artificial neural network[J].Hunan Electric Power,2011,31(6):7-9(in Chinese).
[10]  陈斌,郑德库.架空送电线路导线覆冰破坏问题分析[J].吉林电力,2005,181(6):25-27. Chen Bin,Zheng Deku.Analysis on the question of ice coating damage to overhead transmission lines[J].Jilin Electric Power,2005,181(6):25-27(in Chinese).
[11]  赵大乐,姚秀平,纪冬梅,等.输电线雾凇覆冰的工程估算方法[J].上海电力学院学报,2011,27(1):19-23. Zhao Dale,Yao Xiuping,Ji Dongmei,et al.Analysis of the status quo of study on icing on high voltage transmission line[J].Journal of Shanghai University of Electric Power,2011,27(1):19-23(in Chinese).
[12]  郭昊,刘沛清,屈秋林,等.输电线雾凇覆冰的工程估算方法[J].高电压技术,2011,37(4):1041-1049. Guo Hao,Liu Peiqing,Qu Qiulin,et al.Estimation engineering method of rime accretion process on transmission lines[J].High Voltage Engineering,2011,37(4):1041-1049(in Chinese).
[13]  舒立春,李特,蒋兴良,等.交流电场强度对导线雾凇覆冰特性的影响[J].中国电机工程学报,2012,32(19):140-147. Shu Lichun,Li Te,JIang Xingliang,et al.Influences of AC electric field strength on conductor rime icing performance[J].Proceedings of the CSEE,2012,32(19):140-147(in Chinese).
[14]  郭昊,刘沛清,刘胜春,等.输电线雾凇覆冰过程的二维数值模拟[J].工程力学,2011,28(5):212-218. Guo Hao,Liu Peiqing,Liu Shengchun,et al.Two dimensional numerical simulation of the rime accretion process on transmission lines[J].Engineering Mechanics,2011,28(5):212-218(in Chinese).
[15]  Lozowski E P,Stallabrass J R,Hearty P F,et al.The icing of an unheated,non-rotating cylinder,Part I:a simulation model[J].Journal of Climate and Applied Meteorology,1983,22(51):2053-2062.
[16]  Makkonen L.Models for the growth of rime,glaze,icicles and wet snow on structures[J].Philosophical Transactions of The Royal Society A:Mathematical, Physical and Engineering Sciences,2000,358(1776):2913-2939.
[17]  Makkonen L.Modelling of ice accretion on wires[J].Journal of Climate and Applied Meteorology,1984,23(6):929-939.
[18]  杨加伦,朱宽军,刘彬,等.输电线路冰区分布图绘制关键技术[J].电力建设,2013,34(9):31-36. Yang Jialun,Zhu Kuanjun,Liu Bin,et al.Technologies of icing distribution map for power transmission line[J].Electric Power Construction,2013,34(9):31-36(in Chinese).
[19]  Makkonen L.COST action 727 WG1-review of results[C]//The 13th International Workshop on Atmospheric Icing of Structure,Adermatt,Switzerland,2009.
[20]  Lugovoi V,Chereshniuk S,Timashova L.Modern techniques of ice-load assessment and icing maps creation for the design of overhead transmission lines used in the russian federation[C]//The 13th International Workshop on Atmospheric Icing of Structure,Adermatt,Switzerland,2009.
[21]  刘泽洪.直流输电线路覆冰与防治[M].北京:中国电力出版社,2012:10-24. Liu Zehong.Accreted ice and preventive treatment on conductor of UHVDC transmission lines[M].Beijing,China Electric Power Press,2012:10-24(in Chinese).
[22]  Sundin E,Makkonen L.Ice loads on a lattice tower estimated by weather station data[J].Journal of Climate and Applied Meteorology,1998,37(5):523-529.
[23]  Jones K F.The Density of natural ice accretions[C]//The 4th International Conference on Atmospheric Icing of Structures,E.D.F.,Paris,1988.
[24]  Personner P,Gayet J F.Ice accretion on wires and anti-icing induced by joule effect[J].Journal of Applied Meteorology,1988,27(6):101-104.
[25]  Wareing B,Nygaard E.WRF simulation of wet snow and rime icing incidents in the UK[C]//The 13th International Workshop on Atmospheric Icing of Structure,Adermatt,Switzerland,2009.
[26]  Heimo A,Cattin R,Calpini B,et al.Recommendations for meteorological measurements under icing conditions [C]//The 13 th International Workshop on Atmospheric Icing of Structure,Adermatt,Switzerland,2009.
[27]  蒋兴良,常恒,胡琴,等.输电线路综合荷载等值覆冰厚度预测与试验研究[J].中国电机工程学报,2013,33(10):177-183. Jiang Xingliang,Chang Heng,HU Qin,et al.Prediction and experimental study on combined load equivalent ice thickness of overhead transmission line[J].Proceedings of the CSEE,2013,33(10):177-183(in Chinese).
[28]  Fikke S,Ronsten G,Heimo A,et al.COST-727 atmospheric icing on structures:2006 measurements and data collection on icing:state of the art[R].Switzerland:Publication of MeteoSwiss ,2006.
[29]  Golikova T N.Basic principle of the measurement for ice on overhead transmission lines[C]//The 5 th International Workshop on Atmospheric Icing of Structure,Tokyo,Japan,1990.
[30]  Messinger B L.Equilibrium temperature of an unheated icing surface as a function of airspeed[J].Journal of the Aeronautical Sciences,1953,20(5):195-200.
[31]  Wright W B.Advancement in the LEWICE Ice Accretion Model[J].AIAA Paper,1993,93(3):171-188.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133