基于场景分析的含可中断负荷的优化调度模型研究

DOI: 10.13334/j.0258-8013.pcsee.2014.S.004, PP. 25-31

Keywords: 需求响应,虚拟发电厂,负荷调度,可中断负荷,场景分析

Full-Text   Cite this paper   Add to My Lib

Abstract:

采用场景分析法对含可中断负荷的电力系统调度模型进行建模。场景分析既可体现系统运行中的不确定性又可反映随时间变化的调度过程,该文对场景生成、场景缩减及场景树生成进行总结。分析可中断负荷参与系统运行的中断量、时长、次数及提前通知时间等约束,通过与常规机组对比,指出可把可中段负荷视为虚拟发电厂。建立含可中断负荷的优化调度模型并进行算例验证,证明该模型可有效应对系统运行中的不确定性因素。

References

[1]  刘晓.新能源电力系统广域源荷互动调度模式理论研究[D].北京:华北电力大学,2012. Liu Xiao.Theoretical study on wide area source and load interactive scheduling mode of new energy power system[D].Beijing:North China Electric Power University,2012 (in Chinese).
[2]  赵鸿图,周京阳,于尔铿.支撑高效需求响应的高级量测体系[J].电网技术,2010,34(9):13-20. Zhao Hongtu,Zhou Jingyang,Yu Erkeng.Advanced metering infrastructure supporting effective demand response[J].Power System Technology,2010,34(9):13-20(in Chinese).
[3]  张钦,王锡凡,付敏,等.需求响应视角下的智能电网[J].电力系统自动化,2009,33(17):49-55. Zhang Qin,Wang Xifan,Fu Min,et al.Smart grid from the perspective of demand response[J].Automation of Electric Systems,2009,33(17):49-55(in Chinese).
[4]  张钦,王锡凡,王建学,等.电力市场下需求响应研究综述[J].电力系统自动化,2008,32(3):97-106. Zhang Qin,Wang Xifan,Wang Jianxue,et al.Survey of demand response research in deregulated electricity markets[J].Automation of Electric Systems,2008,32(3):97-106(in Chinese).
[5]  Majumdar S,Chattopadhyay D,Parikh J.Interruptible load management using optimal power flow analysis [J].IEEE Transactions on Power Systems,1996,11(2):715-720.
[6]  王建学,王锡凡,张显,等.电力市场和过渡期电力系统可中断负荷管理(一)——可中断负荷成本效益分析[J].电力自动化设备,2004,24(5):15-19. Wang Jianxue,Wang Xifan,Zhang Xian,et al.Interruptible load management in power market and interin system[J].Electric Power Automation Equipment,2004,24(5):15-19(in Chinese).
[7]  Aminifar F,Fotuhi-Firuzabad M,Shahidehpour M.Unit commitment with probabilistic spinning reserve and interruptible load considerations[J].IEEE Transactions on Power Systems,2009,24(1):388-397.
[8]  王蓓蓓,刘小聪,李扬.面向大容量风电接入考虑用户侧互动的系统日前调度和运行模拟研究[J].中国电机工程学报,2013,36(22):35-44. Wang Beibei,Liu Xiaocong,Li Yang.Day-ahead generation scheduling and operation simulation considering demand response in large-capacity wind power integrated systems[J].Proceedings of the CSEE,2013,36(22):35-44(in Chinese).
[9]  何禹清,彭建春,文明,等.含风电的配电网重构场景模型及算法[J].中国电机工程学报,2010,30(28):12-18. He Yuqing,Peng Jianchun,Wen Ming,et al.Scenario model and algorithm for the reconfiguration of distribution network with wind power generators [J].Proceedings of the CSEE,2010,30(28):12-18(in Chinese).
[10]  杨明,韩学山,王士柏,等.不确定运行条件下电力系统鲁棒调度的基础研究[J].中国电机工程学报,2011,31(1):100-107. Yang Ming,Han Xueshan,Wang Shibo,et al.Fundamental research for power system robust dispatch under uncertain operating condition [J].Proceedings of the CSEE,2011,31(1):100-107(in Chinese).
[11]  Takriti S,Birge J R,Long E.A stochastic model for the unit commitment problem[J].IEEE Transactions on Power Systems,1996,11(3):1497-1508.
[12]  雷宇,杨明,韩学山.基于场景分析的含风电系统机组组合的两阶段随机优化[J].电力系统保护与控制,2012,40(23):58-67. Lei Yu,Yang Ming,Han Xueshan.A two-stage stochastic optimization of unit commitment considering wind power based on scenario analysis[J].Power System Protection and Control,2012,40(23):58-67(in Chinese).
[13]  Parvania M,Fotuhi-Firuzabad M.Demand response scheduling by stochastic SCUC[J].IEEE Transactions on Smart Grid,2010,1(1):89-98.
[14]  张放,刘继春,高红均,等.基于风电不确定性的电力系统备用容量获取[J].电力系统保护与控制,2013,41(13):14-19. Zhang Fang,Liu Jichun,Gao Hongjun,et al.Reserve capacity model based on the uncertainty of wind power in the power system[J].Power System Protection and Control,2013,41(13):14-19(in Chinese).
[15]  Dupacov J,Growe-Kuska N,Romisch W.Scenario reduction in stochastic programming:an approach using probability metrics[J].Math Program,2003,95(3):493-511.
[16]  Growe-Kuska N,Heitsch H,Romisch W.Scenario reduction and scenario tree construction for power management problems[C]//Proceedings of IEEE Conference on Power Technology.Bologna,Italy:IEEE,2003:3-7.
[17]  周旭,包海龙,徐凡,等.计及负荷预测误差的可中断负荷优化管理[J].电力需求侧管理,2011,13(2):16-19. Zhou Xu,Bao Hailong,Xu Fan,et al.The interruptible load optimization management considering the load forecast error[J].Power Demand Side Management,2011,13(2):16-19(in Chinese).
[18]  Carrión M,Arroyo J M.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Transactions on Power Systems,2006,21(3):1371-1378.
[19]  赵波,曹一家.电力系统机组组合问题的改进粒子群优化算法[J].电网技术,2004,28(21):6-10. Zhao Bo,Cao Yijia.An improved particle swarm optimization algorithm for power system unit commitment[J].Power System Technology,2004,28(21):6-10(in Chinese).