回收余热的热电联产IGCC电站研究

DOI: 10.13334/j.0258-8013.pcsee.2014.S.014, PP. 100-104

Keywords: 整体煤气化联合循环(IGCC),集中供热,余热回收,吸收式换热

Full-Text   Cite this paper   Add to My Lib

Abstract:

整体煤气化联合循环(integratedgasificationcombinedcycle,IGCC)作为洁净煤发电技术,发展为供热机组后,可实现更为清洁的煤基热电联产技术。另一方面,IGCC目前投资较高,若能实现与集中供热结合,供热收益可大幅度改善IGCC的经济性,而以热定电的形式保证了IGCC的年发电小时数,为IGCC的商业化推广提供了一条有力的途径。进行汽轮机乏汽余热回收与烟气余热回收后,IGCC的总体能源利用效率会进一步提高,经济性也将大幅改善。该文研究结果表明:400MW级的IGCC热电联产系统的热电比为47.2%,总体能源利用效率为57.6%;进行余热回收后,热电比为55.6%,总体能源利用效率为60.8%;在热力站进行吸收式换热改造后,热电比为62.0%,总体能源利用效率为63.4%。

References

[1]  江亿,唐孝炎,倪维斗,等.北京PM 2.5 与冬季采暖热源的关系及治理措施[J].中国能源,2014,36(01):7-13. Jiang Yi,Tang Xiaoyan,Ni Weidou,et al.Relationship and control measures for Beijing PM 2.5 emissions and the winter heating heat source[J].Energy of China,2014,36(01):7-13(in Chinese).
[2]  环境保护部,国家质量监督检验检疫总局.GB13223—2011火电厂大气污染物排放标准[S].北京:中国环境科学出版社,2012. Ministry of Environmental Protection of the People's Republic of China,General Administration of Quality Supervision,Inspection and Quarantine of the People's Republic of China.GB13223—2011 Emission standard of air pollutants for thermal power plants[S].Beijing:China Environmental Science Press,2012(in Chinese).
[3]  周贤,联合循环电站改造为IGCC和甲醇联产系统的研究[D].北京:中国科学院研究生院(工程热物理研究所),2011. Zhou Xian.Research on retrofitting natural gas combined cycle to integrated gasification combined cycle and power-methanol co-production system[D].Beijing:Institute of Engineering Thermophysics,Chinese Academy of Sciences,2011(in Chinese).
[4]  徐越,吴一宁,危师让.二段式干煤粉气流床气化技术的模拟研究与分析[J].中国电机工程学报,2003,23(10):186-190. Xu Yue,Wu Yining,Wei Shirang.Simulation and analysis on gasification technology of a two-stage dry feed entrained flow bed[J].Proceedings of the CSEE,2003,23(10):186-190(in Chinese).
[5]  张丽丽.煤制燃料气燃气轮机建模及性能分析[D].北京:中国科学院研究生院(工程热物理研究所), 2010. Zhang Lili.Modeling and Performance Analysis for Coal Gas Fired Gas Turbine[D].Beijing:Institute of Engineering Thermophysics,Chinese Academy of Sciences,2010(in Chinese).
[6]  Zhou X,Liu H,Fu L,et al.Experimental study of natural gas combustion flue gas waste heat recovery system based on direct contact heat transfer and absorption heat pump [C]//ASME 2013 7th International Conference on Energy Sustainability & 11th Fuel Cell Science,Engineering and Technology Conference,Minneapolis,Minnesota,U.S.2013.
[7]  孙作亮,付林,张世钢,等.吸收式热泵回收烟气冷凝热的实验研究[J].太阳能学报,2008,29(1):13-17. Sun Zuoliang,Fu Lin,Zhang Shigang,et al.Experimental study of flue gas latent heat recovery via absorption heat pump[J].Acta Energiae Solaris Sinica,2008,29(1):13-17(in Chinese).
[8]  付林,江亿,张世钢.基于Co-ah循环的热电联产集中供热方法[J].清华大学学报:自然科学版,2008,48(9):1377-1380. Fu Lin,Jiang Yi,Zhang Shigang.District heating system based on Co-ah cycles in combined heating and power systems[J].Journal of Tsinghua University:Science and Technology,2008,48(9):1377-1380(in Chinese).
[9]  Li Y,Fu L,Zhang S,et al.A new type of district heating method with co-generation based on absorption heat exchange (co-ah cycle)[J].Energy Conversion and Management,2011,52(2):1200-1207.
[10]  蒋敏华,黄斌.燃煤发电技术发展展望[J].中国电机工程学报,2012,32(29):1-8. Jiang Minhua,Huang Bin.Prospects on coal-fired power generation technology development[J].Proceedings of the CSEE,2012,32(29):1-8(in Chinese).
[11]  Ansolabehere S,Beer J,Deutch J,et al.The future of coal[R].Massachusetts:Massachusetts Institute of Technology,2007.
[12]  Woods M C,Capicotto R J,Haslbeck J L,et al.Cost and performance baseline for fossil energy plants[R].Pennsylvania:The United States Department of Energy's National Energy Technology Laboratory,2007.
[13]  焦树建,美国的IGCC示范工程与研发工作[J].燃气轮机发电技术,2006. Jiao Shujian.IGCC demonstration projects and research work in America[J].Gas Turbine Technology,2006(in Chinese).
[14]  焦树建.欧洲的IGCC示范工程与研发工作[J].燃气轮机技术,2006,19(2):1-10. Jiao Shujian.IGCC demonstration projects and research work in Europe[J].Gas Turbine Technology,2006,19(2):1-10(in Chinese).
[15]  郑建涛,徐越,任永强.国内外IGCC技术现状和发展动向[J].石油化工建设,2010(06):20-21. Zheng Jiantao,Xu Yue,Ren Yongqiang.On the development of IGCC technology in the world[J].Petroleum and Chemical Construction,2010(06):20-21(in Chinese).
[16]  Nelson M,Rush R,Madden D,et al.Kemper county IGCC project preliminary public design report[R].2012,The United States Department of Energy.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133