Thomas Ackermann.Wind power in power systems [M].Chichester,UK:John Wiley,2005.
[2]
Hetzer J, Yu D C, Bhattarai K.An economic dispatch model incorporating wind power[J].IEEE Transactions on Energy Conversion,2008,23(2):603-611.
[3]
孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47. Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47(in Chinese).
[4]
乔嘉赓,徐飞,鲁宗相,等.基于相关机会规划的风电并网容量优化分析[J].电力系统自动化,2009,32(10):84-87. Qiao Jiasai,Xu Fei,Lu Zongxiang,et al.Optimization analysis model of grid connected wind capacity based on dependent chance programming[J].Automation of Electric Power Systems,2009,32(10):84-87(in Chinese).
[5]
熊虎,向铁元,陈红坤,等.含大规模间歇式电源的模糊机会约束机组组合研究[J].中国电机工程学报,2013,33(13):36-44. Xiong Hu,Xiang Tieyuan,Chen Hongkun,et al.Research of fuzzy chance constrained unit commitment containing large-scale intermittent power[J].Proceedings of the CSEE,2013,33(13):36-44(in Chinese).
[6]
徐曼,乔颖,鲁宗相.短期风电功率预测误差综合评价方法[J].电力系统自动化,2011,35(12):20-26. Xu Man,Qiao Ying,Lu Zongxiang.A comprehensive error evaluation method for short-term wind power prediction[J].Automation of Electric Power Systems,2011,35(12):20-26(in Chinese).
[7]
丁华杰,宋永华,胡泽春,等.基于风电场功率特性的日前风电预测误差概率分布研究[J].中国电机工程学报,2013,33(34):136-144. Ding Huajie,Song Yonghua,Hu Zechun,et al.Probability density function of day-ahead wind power forecast errors based on power curves of wind farms[J].Proceedings of the CSEE,2013,33(34):136-144(in Chinese).
[8]
Siahkali H,Vakilian M.Stochastic unit commitment of wind farms integrated in power system[J].Electric Power Systems Research,2010,80(9):1006-1017.
[9]
Wang J,Shahidehpour M,Li Z.Security-constrained unit commitment with volatile wind power generation[J].IEEE Transactions on Power Systems,2008,23(3):1319-1327.
[10]
Bouffard F,Galiana F D.Stochastic security for operations planning with significant wind power generation[C]//Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century.Pittsburgh,PA:IEEE,2008:1-11.
[11]
艾欣,刘晓.基于可信性理论的含风电场电力系统动态经济调度[J].中国电机工程学报,2011,31(S1):12-18. Ai Xin,Liu Xiao.Dynamic economic dispatch for wind farms integrated power system based on credibility theory[J].Proceedings of the CSEE,2011,31(S1):12-18(in Chinese).
[12]
李群,张刘冬,殷明慧,等.基于模糊决策方法的含风电场电力系统机组组合[J].电网技术,2013,37(9):2480-2485. Li Qun,Zhang Liudong,Yin Minghui,et al.Fuzzy decision-making based unit commitment of power grid integrated with wind farms[J].Power System Technology,2013,37(9):2480-2485(in Chinese).
[13]
艾欣,刘晓,孙翠英.含风电场电力系统机组组合的模糊机会约束决策模型[J].电网技术,2011,35(12):202-207. Ai Xin,Liu Xiao,Sun Cuiying.A fuzzy chance constrained decision model for unit commitment of power grid containing large-scale wind farm[J].Power System Technology,2011,35(12):202-207(in Chinese).
[14]
张娜,吕泉,张显,等.含风电系统的多级机组组合协调制定策略[J].电力系统自动化,2013,37(11):39-45. Zhang Na,Lü Quan,Zhang Xian,et al.A multi-level unit commitment coordinated strategy for power system with wind power[J].Automation of Electric Power Systems,2013,37(11):39-45(in Chinese).
[15]
冯江霞,梁军,张峰,等.考虑调度计划和运行经济性的风电场储能容量优化计算[J].电力系统自动化,2013,37(1):90-95. Feng Jiangxia,Liang Jun,Zhang Feng,et al.An optimization calculation method of wind farm energy storage capacity[J].Automation of Electric Power Systems,2013,37(1):90-95(in Chinese).
[16]
黎静华,文劲宇,程时杰,等.基于p-有效点理论的含大规模风电电力系统最小储能功率配置方法[J].中国电机工程学报,2013,33(13):45-52. Li Jinghua,Wen Jinyu,Cheng Shijie,et al.Method of minimum energy storage power allocation for electric power systems with large-scale wind power based on p-efficient point theory[J].Proceedings of the CSEE,2013,33(13):45-52(in Chinese).
[17]
Bussar C,Moos M,Alvarez R,et al.Optimal allocation and capacity of energy storage systems in a future european power system with 100% renewable energy generation[J].Energy Procedia,2014(46):40-47.
[18]
谢石骁,杨莉,李丽娜.基于机会约束规划的混合储能优化配置方法[J].电网技术,2012,36(5):79-84. Xie Shixiao,Yang Li,Li Lina.A chance constrained programming based optimal configuration method of hybrid energy storage system[J].Power System Technology,2012,36(5):79-84(in Chinese).
[19]
Li W,Joós G,Bélanger J.Real-time simulation of a wind turbine generator coupled with a battery supercapacitor energy storage system[J].IEEE Transactions on Industrial Electronics,2010,57(4):1137-1145.
[20]
周孝信,陈树勇,鲁宗相.电网和电网技术发展的回顾与展望——试论三代电网[J].中国电机工程学报,2013,33(22):1-11. Zhou Xiaoxin,Chen Shuyong,Lu Zongxiang.Review and prospect for power system development and related technologies:a concept of three-generation power systems[J].Proceedings of the CSEE,2013,33(22):1-11(in Chinese).
[21]
陈大宇,张粒子,王澍,等.储能在美国调频市场中的发展及启示[J].电力系统自动化,2013,37(1): 9-13. Chen Dayu,Zhang Lizi,Wang Shu,et al.Development of energy storage in frequency regulation matket of Uited Sates and its enlightenment[J].Automation of Electric Power Systems,2013,37(1):9-13(in Chinese).
[22]
Eickmann J,Drees T,Sprey J D,et al.Optimizing storages for transmission system operation[J].Energy Procedia,2014(46):13-21.
[23]
周松林,茆美琴,苏建徽.风电功率短期预测及非参数区间估计[J].中国电机工程学报,2011,31(25):10-16. Zhou Songlin,Mao Meiqin,Su Jianghui.Short-term forecasting of wind power and non-parametric confidence interval estimation[J].Proceedings of the CSEE,2011,31(25):10-16(in Chinese).
[24]
Hodge B,Milligan M.Wind power forecasting error distributions over multiple timescales[C]//Power and Energy Society General Meeting.Detroit,Michigan,USA:IEEE,2011:1-8.
[25]
刘宝碇,瑞清,王纲.不确定规划及应用[M].北京:清华大学出版社,2003. Liu Baoding,Rui Qing,Wang Gang.Uncertain programming with applications[M].Beijing:Tsinghua University Press,2003(in Chinese).
[26]
Storn R,Price K.Differential evolution-a simple and e fficient adaptive scheme for global optimization over continuous spaces[M].Berkeley:ICSI,1995.