Billinton R,Allan R N.Reliability evaluation of power systems[M].2nd ed.New York:Plenum,1996:1-16,150-151,403-404,422-439.
[2]
Billinton R,Li W.Reliability assessment of electric power systems using Monte Carlo methods[M].New York:Plenum,1994:1-4,255-268.
[3]
李文沅,周家启,颜伟,等.基于可靠性的电力系统设备备用规划方法[J].中国电机工程学报,2006,26(15):7-11,45. Li Wenyuan,Zhou Jiaqi,Yan Wei,et al.Reliability based method for spare planning of power system equipment[J].Proceedings of the CSEE,2006,26(15):7-11,45(in Chinese).
[4]
da Silva A,Sales W S,da Fonseca Manso L A,et al.Long-term probabilistic evaluation of operating reserve requirements with renewable sources[J].IEEE Trans. on Power Systems,2010,25(1):106-116.
[5]
Ding Y,Wang P,Goel L,et al.Long-term reserve expansion of power systems with high wind power penetration using universal generating function methods [J].IEEE Trans. on Power Systems,2011,26(2):766-774.
[6]
薛志英,周明,李庚银.大规模风电接入电力系统备用决策评述[J].电力系统保护与控制,2013,41(4):148-155. Xue Zhiying,Zhou Ming,Li Gengyin.Survey on reserve decision of power systems with large scale wind power integration[J].Power System Protection and Control,2013,41(4):148-155(in Chinese).
[7]
王彩霞,乔颖,鲁宗相.考虑风电效益的风火互济系统旋转备用确定方式[J].电力系统自动化,2012,36(4):16-21. Wang Caixia,Qiao Ying,Lu Zongxiang.A method for determination of spinning reserve in wind-thermal power systems considering wind power benefits[J].Automation of Electric Power Systems,2012,36(4):16-21(in Chinese).
[8]
葛炬,王飞,张粒子.含风电场电力系统旋转备用获取模型[J].电力系统自动化,2010,34(6):32-36. Ge Ju,Wang Fei,Zhang Lizi.Spinning reserve model in the wind power integrated power system[J].Automation of Electric Power Systems,2010,34(6):32-36(in Chinese).
[9]
Vazquez M A,Kirschen D S.Optimizing the spinning reserve requirements using a cost/benefit analysis[J].IEEE Trans. on Power Systems,2007,22(1):24-33.
[10]
Ortega-Vazquez M A,Kirschen D S,Pudjianto D.Optimizing the scheduling of spinning reserve considering the cost of interruptions[J].IEE Proceedings:Generation,Transmission and Distribution,2006,153(5):570-575.
[11]
Ortega-Vazquez M A,Kirschen D S.Estimating the spinning reserve requirements in systems with significant wind power generation penetration[J].IEEE Trans. on Power Systems,2009,24(1):114-124.
[12]
张国全,王秀丽,王锡凡.电力市场中旋转备用的效益和成本分析[J].电力系统自动化,2000,24(21):14-18. Zhang Guoquan,Wang Xiuli,Wang Xifan.Studies on benefits and costs of spinning reserve capacity in power market[J].Automation of Electric Power Systems,2000,24(21):14-18(in Chinese).
[13]
王建学,王锡凡,张显.电力市场中弹性运行备用研究[J].中国电机工程学报,2005,25(18):20-27. Wang Jianxue,Wang Xifan,Zhang Xian.The flexible operating reserve in the power market[J].Proceedings of the CSEE,2005,25(18):20-27(in Chinese).
[14]
Analysis performed by PJM staff.2012 PJM reserve requirement study,11-year planning horizon:June 1st 2012-May 31st 2023[R/OL].2012[2013-07-.http:// www.pjm.com/~/media/planning/res-adeq/2012-pjm-reserve-requirement-study.ashx.
[15]
赵渊,谢开贵.电网可靠性指标概率密度分布的解析计算模型[J].中国电机工程学报,2011,31(4):31-38. Zhao Yuan,Xie Kaigui.An analytical approach to compute the probability density distributions of reliability indices for bulk power systems[J].Proceedings of the CSEE,2011,31(4):31-38(in Chinese).
[16]
Billinton R,Wangdee W.Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation[J].IEEE Trans. on Power Delivery,2006,21(2):909-917.
[17]
齐先军,丁明.发电系统中旋转备用方案的风险分析与效用决策[J].电力系统自动化,2008,32(3):9-13,25. Qi Xianjun,Ding Ming.Risk analysis and utility decision-making of spinning reserve scheme in power generating system[J].Automation of Electric Power Systems,2008,32(3):9-13,25(in Chinese).
[18]
张国强,吴文传,张伯明.考虑风电接入的有功运行备用协调优化[J].电力系统自动化,2011,35(12):15-19,46. Zhang Guoqiang,Wu Wenchuan,Zhang Boming.Optimization of operation reserve coordination considering wind power integration[J].Automation of Electric Power Systems,2011,35(12):15-19,46(in Chinese).
[19]
周辉,娄素华,吴耀武,等.发电系统一致性运行可靠性指标及其优化模型[J].中国电机工程学报,2009,29(13):72-79. Zhou Hui,Lou Suhua,Wu Yaowu,et al.Coherent reliability index for generation system operation and its optimization model[J].Proceedings of the CSEE,2009,29(13):72-79(in Chinese).
[20]
谢绍宇,王秀丽,王锡凡.电力系统的分割多目标风险分析框架及算法[J].中国电机工程学报,2011,31(34):53-60. Xie Shaoyu,Wang Xiuli,Wang Xifan.Risk assessment framework and algorithm of power systems based on the partitioned multi-objective risk method[J].Proceedings of the CSEE,2011,31(34):53-60(in Chinese).
[21]
Wang X,Xie S,Wang X,et al.Decision-making model based on conditional risks and conditional costs in power system probabilistic planning[J].IEEE Trans. on Power Systems,2013,28(4):4080-4088.
[22]
谢绍宇,王秀丽,曲翀,等.分割多目标风险分析框架下不同风速模拟方法对电力系统可靠性评估的影响[J].中国电机工程学报,2013,33(31):81-89. Xie Shaoyu,Wang Xiuli,Qu Chong,et al.Impacts of wind speed simulation methods on adequacy evaluation of power systems in the partitioned multi-objective risk analysis framework[J].Proceedings of the CSEE,2013,33(31):81-89(in Chinese).
[23]
谢绍宇.基于条件期望的电力系统可靠性分析与决策[D].西安:西安交通大学,2013. Xie Shaoyu.Conditional expectation based reliability assessment & decision making in power systems[D].Xi’an:Xi’an Jiaotong University,2013(in Chinese).
[24]
王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:64-88. Wang Xifan.Fundamentals of power system planning [M].Beijing:China Electric Power Press,1994:64-88(in Chinese).
[25]
曲翀,王秀丽,谢绍宇,等.含风电电力系统随机生产模拟的改进算法[J].西安交通大学学报,2012,46(6):115-121. Qu Chong,Wang Xiuli,Xie Shaoyu,et al.An improved algorithm for probabilistic production simulation of power systems with wind power[J].Journal of Xi’an Jiaotong University,2012,46(6):115-121(in Chinese).
[26]
IEEE Task Force.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,98(6):2047-2054.