Shahidehpour M,Yamin H,Li Z Y.Market operations in electric power systems[M].New York:Wiley,2002:275-310.
[2]
Hobbs B F,Rothhopf M H,Oneill R P,et al.The next generation of electric power unit commitment models [M].Norwell,MA:Kluwer 1999:15-38.
[3]
Padhy N P.Unit commitment:A bibliographical survey [J].IEEE Trans. on Power Systems,2004,19(2):2047-2054.
[4]
Wu L,Shahidehpour M,Fu Y.Security-constrained generation and transmission outage scheduling with uncertainties[J].IEEE Trans. on Power Systems,2010,25(3):1674-1685.
[5]
Fu Y,Shahidehpour M, Li Z.Security-constrained unit commitment with AC constrains[J].IEEE Trans. on Power Systems,2005,20(3):1538-1550.
[6]
Fu Y,Shahidehpour M,Li Z.AC contingency dispatch based on Security-constrained unit commitment with [J].IEEE Trans. on Power Systems,2006,21(2):897-908.
[7]
Wang J,Shahidehpour M,Li Z.Security-constrained unit commitment with volatile wind power generation[J].IEEE Trans. on Power Systems,2008,23(3):1319-1327.
[8]
Guan X,Guo S,Zhai Q.The conditions for obtaining feasible solutions to Security-constrained unit commitment problems[J].IEEE Trans. on Power Systems,2005,20(4):1746-1756.
[9]
Zhai Q,Guan X,Cheng J S,et al.Fast identification of inactive security constrains in SCUC problems[J].IEEE Trans. on Power Systems,2010,25(4):1946-1954.
[10]
耿建,徐帆,姚建国,等.求解安全约束机组组合问题混合整数规划算法性能分析[J].电力系统自动化,2009,33(21):24-27. Geng Jian,Xu Fan,Yao Jianguo,et al.Performance analysis of mixed-integer programming based algorithm for security-constrained unit commitment[J].Automation of Electric Power Systems,2009,33(21):24-27(in Chinese).
[11]
李利利,管益斌,耿建,等.月度安全约束机组组合建模及求解[J].电力系统自动化,2011,35(12):27-31. Li Lili,Guan Yibin,Geng Jian,et al.Modeling and solving for monthly security-constrained unit commitment problem [J].Automation of Electric Power Systems,2011,35(12):27-31(in Chinese).
[12]
王毅,侯俊贤,马世英,等.用于调度计划安全稳定校核的潮流数据自动整合调整办法[J].电网技术,2010,34(4):100-104. Wang Yi,Hou junxian,Ma shiying,et al.A method for automatic integration and regulation of power flow data for security and stability check of generation scheduling analysis[J].Power System Technology,2010,34(4):100-104(in Chinese).
[13]
谢昶,刘文颖,文晶,等.基于多数据源的日前预报潮流自动生成方法[J].电力系统自动化,2012,36(21):87-92. Xie Chang,Liuwenyin,Wen Jin,et al.Auto-generation mothed of day-ahead forecast power flow based on multiple data sources[J].Automation of Electric Power Systems,2012,36(21):87-92(in Chinese).
[14]
林毅,孙宏斌,吴文传,等.日前计划安全校核中计划潮流自动生成技术[J].电力系统自动化,2012,36(20):68-73. Lin Yi,Sun Hongbin,Wu Wenchuan,et al.A schedule power flow auto generating technology in day-ahead security validation[J].Automation of Electric Power Systems,2012,36(20):68-73(in Chinese).
[15]
丁平,周孝信,严剑峰,等.大型互联电网多断面功率约束潮流算法[J].中国电机工程学报,2010,30(10):8-15. Ding Ping,Zhou Xiaoxin,Yan Jianfeng,et al.Algorithm of power flow for bulk interconnected grid with transmission interface power constrains[J].Proceedings of the CSEE,2010,30(10):8-15(in Chinese).
[16]
丁平,周孝信,严剑峰,等.考虑合理安全原则的大型互联电网在线传输极限计算[J].中国电机工程学报,2010,30(22):1-6. Ding Ping,Zhou Xiaoxin,Yan Jianfeng,et al.Calculation of online total transfer capability in bulk interconnected grid integrating rationality and security principle [J].Proceedings of the CSEE,2010,30(22):1-6(in Chinese).
[17]
Barcelo W R,Lemmon W W.Standardized sensitivity coefficients for power system networks[J].IEEE Trans. on Power Systems,1988,3(4):1591-1599.