Bi Tianshu,Li Wei,Xu Zhenyu,et al.First-zone distance relaying algorithm of parallel transmission lines for cross-country grounded faults[J].IEEE Transactions on Power Delivery,2012,27(4):2185-2192.
Hu Zhijian,Jiang Meiling.Setting of zero sequence current compensation coefficient for Four-Circuit transmission limestone in different voltage classes on same tower[J].Power System Technology,2012,36(7):60-66(in Chinese).
Hu Zhijian,Cheng Xiaomin.Measurement methods of zero-sequence impedance parameters for transmission lines[J].Journal of Electric Power Science and Technology,2010,25(3):25-31(in Chinese).
[6]
Kusic G L,Garrison D L.Measurement of transmission line parameters from SCADA data[C]//IEEE PES Power Systems Conference and Exposition.New York,USA:IEEE,2004:440-445.
[7]
Brandão Fari J A.Electric and magnetic coupling between neighboring multiconductor transmission lines considering short interaction lengths[J].IEEE Transactions on Power Delivery,2013,28(1):475-482.
Ban Liangeng,Wang Xiaogang,Bai Hongkun,et al.Simulative analysis of induced voltages and currents among multi circuit 220 kV and 500 kV transmission lines on same tower[J].Power System Technology,2009,33(6):45-49(in Chinese).
[10]
Hu Zhijian,Chen Yunping.New method of live line measuring the inductance parameters of transmission lines based on GPS technology[J].IEEE Transactions on Power Delivery,2008,23(3):1288-1295.
Hu Zhijian,Chen Yunping,Xu Wei,et al.Principles and realization of live line measurement of parameters of transmission lines with mutual inductance based on differential equations[J].Proceedings of the CSEE,2005,25(2):28-33(in Chinese).
Liu Zunyi,Lu Ming,Lü Zhongbin,et al.Power frequency parameter measurement technology for UHV transmission lines and its application[J].Power System Technology,2009,33(10):59-62(in Chinese).
Yuan Liangrong,Zhao Yinfeng,Li Long,et al.Adaptability study of parameters measuring principle for transmission lines based on nor-power frequency method[J].Water Resources and Power,2012,30(4):159-163(in Chinese).
Hu Zhijian.Live line measurement method of zero sequence parameters of transmission lines with mutual inductance by using an non-power frequency injection current:China,ZL 200910272500.X [P].2010-4-21.
Fang Lihua,Hu Zhijian.A new method for live line measurement of zero-sequence parameters of transmission line containing T-connection transmission line with mutual inductance and its engineering application[J].Power System Technology,2010,34(4):204-208(in Chinese).
[24]
傅知兰.电力系统电气设备选择与实用计算[M].北京:中国电力出版社,2004:204-211.
[25]
Fu Zhilan.Power system electrical equipment selection and practical calculation[M].Beijing:China Electric Power Press,2005:204-211(in Chinese).
[26]
Dommel H H.Overhead line parameters from handbook formulas and computer programs[J].IEEE Computer Applications in Power,1990,3(1):34.
[27]
李建明,朱康.高压电气设备试验方法[M].北京:中国电力出版社,2001:258-264.
[28]
Li Jiangmin,Zhu Kang.Test methods of high voltage electrical equipment[M].Beijing:China Electric Power Press,2005:258-264(in Chinese).
[29]
Kurokawa S,Asti G A,Costa E C M,Pissolato J.Simplified procedure to estimate the resistance parameters of transmission lines[J].Electrical Engineering,2013(95):221-227.
[30]
Dawidowski P,Izykowski J,Nayir A.Analytical synchronization of two-end measurements for transmission line parameters estimation and fault location[J].IU-Journal of Electrical & Electronics Engineering,2013,13(1):1569-1574.
[31]
Niu Shengsuo,Liang Zhirui,Zhang Jianhua,et al.Online measurement of T-Connection transmission line parameters based on multi-interval synchronized measurement information[J].Transactions of China Electrotechnical Society,2012,27(5):238-244(in Chinese).
Lu Deyin,Wu Zundong,Chen Xinhua.The analysis of measuring the power frequency parameters of transmission line with varying Frequency method[J].High Voltage Engineering,2008,34(6):1295-1297(in Chinese).