Cheng Chuntian,Shen Jianjian,Wu Xinyu,et al.Operation challenges for fast-growing China’s hydropower systems and respondence to energy saving and emission reduction[J].Renewable and Sustainable Energy Reviews,2012,16(5):2386-2393.
张睿,周建中,肖舸,等.金沙江下游梯级和三峡梯级水电站群联合调度补偿效益分析[J].电网技术,2013,37(10):2738-2744. Zhang Rui,Zhou Jianzhong,Xiao Ge,et al.Analysis on complementary benefit from combined dispatching of cascaded hydropower stations at lower reaches of jinsha river with those at three gorges[J].Power System Technology,2013,37(10):2738-2744(in Chinese) .
[4]
申建建,程春田,李卫东,等.复杂时段耦合约束水电站群短期变尺度优化方法[J].中国电机工程学报,2014,34(1):87-95. Shen Jianjian,Cheng Chuntian,Li Weidong,et al.A mutative-scale optimization method for short-term operation of hydropower plants with complex temporal coupling constraints[J].Proceedings of the CSEE,2014,34(1):87-95(in Chinese) .
[5]
梅亚东,杨娜,翟丽妮.雅砻江下游梯级水库生态友好型优化调度[J].水科学进展,2009(20):721-725. Mei Yadong,Yang Na,Zhai Lini.Optimal ecological sound operation of the cascade reservoirs[J].Advances in Water Science,2009(20):721-725(in Chinese) .
[6]
裴哲义,伍永刚,纪昌明,等.跨区域水电站群优化调度初步研究[J].电力系统自动化,2010,34(24):23-27. Pei Zheyi,Wu Yonggang,Ji Changming,et al.Preliminary study on optimal dispatch of cross regional hydropower station group[J].Automation of Electric Power Systems,2010,34(24):23-27(in Chinese).
[7]
刘振亚.中国特高压交流输电技术创新[J].电网技术,2013,37(3):1-8. Liu Zhenya.Innovation of UHVAC transmission technology in China[J].Power System Technology,2013,37(3):1-8(in Chinese) .
[8]
赵洁,刘涤尘,雷庆生,等.核电机组参与电网调峰及与抽水蓄能电站联合运行研究[J].中国电机工程学报,2011,31(7):1-6. Zhao Jie,Liu Dichen,Lei Qingsheng,et al.Analysis of nuclear power plant participating in peak load regulation of power grid and combined operation with pumped storage power plant[J].Proceedings of the CSEE,2011,31(7):1-6(in Chinese).
[9]
刘拥军,王亮,王强,等.华东电网抽水蓄能电站电能计划安排方式优化算法[J].电力系统自动化,2009,33(3):104-107. Liu Yongjun,Wang Liang,Wang Qiang,et al.An optimization algorithm for determining pumped storage power stations energy schedule in the East China Grid [J].Automation of Electric Power Systems,2009,33(3):104-107(in Chinese).
[10]
何光宇,王稹,裴哲义,等.三峡电力系统调峰问题的研究[J].电网技术,2003,27(10):12-16. He Guangyu,Wang Zheng,Pei Zheyi,et al.Peak-load dispatching of three gorges power system[J].Power System Technology,2003,27(10):12-16(in Chinese).
[11]
马超.耦合航运要求的三峡-葛洲坝梯级水电站短期调度快速优化决策[J].系统工程理论与实践,2013,33(5):1345-1350. Ma Chao.Fast optimal decision of short-term dispatch of Three Gorges and Gezhouba cascade hydropower stations with navigation demand considered[J].Systems Engineering- Theory and Practice,2013,33(5):1345-1350(in Chinese).
[12]
唐海华,陈森林,赵宇.三峡梯级电站短期优化调度模型及算法[J].水电能源科学,2008,26(3):133-136. Tang Haihua,Chen Senlin,Zhaoyu.Model and algorithm of short-term optimal scheduling of Three Gorges cascaded hydropower stations[J].Water Resources and Power,2008,26(3):133-136(in Chinese) .
[13]
刘静,罗先觉.处理梯级水电站复杂约束的短期水火电系统环境经济优化调度[J].中国电机工程学报,2012,32(14):27-35. Liu Jing,Luo Xianjue.Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station[J].Proceedings of the CSEE,2012,32(14):27-35(in Chinese).
[14]
武新宇,程春田,李刚,等.水电站群长期典型日调峰电量最大模型研究[J].水利学报,2012,43(3):363-371. Wu Xinyu,Cheng Chuntian,Li Gang,et al.Research on long term typical day peak load regulation energy maximization model for hydropower systems[J].Journal of Hydraulic Engineering,2012,43(3):363-371(in Chinese) .
[15]
Cheng Chuntian,Shen Jianjian,Wu Xinyu.Short-term scheduling for large-scale cascaded hydropower system with multi-vibration zones of high head[J].Journal of Water Resources Planning and Management-ASCE,2012,138(3),257-267.
[16]
Cheng Chuntian,Shen Jianjian,Wu Xinyu.Short-Term hydro scheduling with discrepant objectives using multi- steps of progressive optimality algorithm[J].JAWRA- Journal of the American Water Resources Association,2012,48(3),464-479.
[17]
Barros M T L,Tsai F T C,Yang S L,et al.Optimization of large-scale hydropower system operations[J].Journal of Water Resources Planning and Management-ASCE,2003,129(3):178-188.
[18]
Jubril A M,Komolafe O A,Alawode K O.Solving multi-objective economic dispatch problem via semidefinite programming[J].IEEE Transactions on Power System,2013; 28(3):2056-2064
[19]
吴杰康,郭壮志,丁国强.采用梯级水电站动态弃水策略的多目标短期优化调度[J].中国电机工程学报,2011,31(4):15-23. Wu Jiekang,Guo Zhuangzhi,Ding Guoqiang.Short term multi-objective optimization scheduling with dynamic water spillage strategy for cascade hydroelectric plants [J].Proceedings of the CSEE,2011,31(4):15-23(in Chinese).
[20]
袁晓辉,袁艳斌,权先璋,等.基于混沌进化算法的梯级水电系统短期发电计划[J].电力系统自动化,2001,25(16):34-38. Yuan Xiaohui,Yuan Yanbin,Quan Xianzhang,et al.Hybrid chaotic/evolutionary algorithm to short-term cascaded hydroelectric scheduling[J].Automation of Electric Power Systems,2001,25(16):34-38(in Chinese) .
[21]
蔡建章,蔡华祥,洪贵平.电力电量平衡算法研究与应用[J].云南电力技术,1994(3):8-11 Cai Jianzhang,Cai Huaxiang,Hong Guiping.Application and study on electric power and energy balance [J].Yunnan Electric Power,1994(3):8-11(in Chinese) .