考虑日前计划的风储联合系统多目标协调调度

DOI: 10.13334/j.0258-8013.pcsee.2014.28.001, PP. 4743-4751

Keywords: 风储联合发电系统,动态经济调度,超短期预测,两阶段优化,滚动计划

Full-Text   Cite this paper   Add to My Lib

Abstract:

建立多时间尺度的风储发电系统协调调度模式,提出一种适用于风储联合发电系统的滚动协调调度方法。优化模型采用两阶段优化方法实现多目标决策和分层协调调度,第1阶段优化利用风电场储能系统和常规机组的协调调度最小化系统弃风电量和失负荷电量,第2阶段优化按照风电并网标准和系统调度需求在各风电场之间分配储能系统充放电任务和弃风功率。采用含3个实际风电场的IEEE30节点系统进行仿真分析,结果表明:基于风电场滚动上报的超短期风电功率预测信息,提出的风储联合发电系统日内滚动协调调度方法能够有效减少弃风,降低系统运行成本。

References

[1]  乔颖,鲁宗相.考虑电网约束的风电场自动有功控制[J].电力系统自动化,2009,33(22):88-93. Qiao Ying,Lu Zongxiang.Wind farms active power control considering constraints of power grids[J].Automation of Electric Power Systems,2009,33(22):88-93(in Chinese).
[2]  Ummels B C,Gibescu M,Pelgrum E,et al.Impacts of wind power on thermal generation unit commitment and dispatch[J].IEEE Transactions on Energy Conversion,2007,22(1):44-51.
[3]  Lee T Y.Optimal spinning reserve for a wind-thermal power system using EIPSO[J].IEEE Transactions on Power Systems,2007,22(4):1612-1621.
[4]  张伯明,吴文传,郑太一,等.消纳大规模风电的多时间尺度协调的有功调度系统设计[J].电力系统自动化,2011,35(1):1-6. Zhang Boming,Wu Wenchuan,Zheng Taiyi,et al.Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J].Automation of Electric Power Systems,2011,35(1):1-6(in Chinese).
[5]  张国强,张伯明,吴文传.考虑风电接入的协调滚动发电计划[J].电力系统自动化,2011,35(19):18-22.
[6]  Zhang Guoqiang,Zhang Boming,Wu Wenchuan.Coordinated roll generation scheduling considering wind power integration[J].Automation of Electric Power Systems,2011,35(19):18-22(in Chinese).
[7]  Daneshi H,Srivastava A K.Impact of battery energy storage on power system with high wind penetration[C]//Proceedings of 2012 Transmission and Distribution Conference and Exposition(T&D).CA,USA:IEEE,2012:1-8.
[8]  严干贵,冯晓东,李军徽,等.用于松弛调峰瓶颈的储能系统容量配置方法[J].中国电机工程学报,2012,32(28):27-35. Yan Gangui,Feng Xiaodong,Li Junhui,et al.Optimization of energy storage system capacity for relaxing peak load regulation bottlenecks[J].Proceedings of the CSEE,2012,32(28):27-35(in Chinese).
[9]  孙春顺,王耀南,李欣然.飞轮辅助的风力发电系统功率和频率综合控制[J].中国电机工程学报,2008,28(29):111-116. Sun Chunshun,Wang Yaonan,Li Xinran.Synthesized power and frequency control of wind power generation system assisted through flywheels[J].Proceedings of the CSEE,2008,28(29):111-116(in Chinese).
[10]  于芃,周玮,孙辉,等.用于风电功率平抑的混合储能系统及其控制系统设计[J].中国电机工程学报,2011,31(17):127-133. Yu Pen,Zhou Wei,Sun Hui,et al.Hybrid energy storage system and control system design for wind power balancing[J].Proceedings of the CSEE,2011,31(17):127-133(in Chinese).
[11]  Lee J,Kim J H,Joo S K.Stochastic method for the operation of a power system with wind generators and superconducting magnetic energy storages (SMESs)[J].IEEE Transactions on Applied Superconductivity,2011,21(3):2144-2148.
[12]  张谦,史乐峰,任玉珑,等.计及V2G备用服务的交易模式[J].中国电机工程学报,2012,32(31):59-67. Zhang Qian,Shi Lefeng,Ren Yulong,et al.The reserve trading model considering vehicle-to-grid reserve[J].Proceedings of the CSEE,2012,32(31):59-67(in Chinese).
[13]  张舒,胡泽春,宋永华,等.考虑电动汽车换电站与电网互动的机组组合问题研究[J].中国电机工程学报,2012,32(10):49-55. Zhang Shu,Hu Zechun,Song Yonghua,et al.Research on unit commitment considering interaction between battery swapping station and power grid[J].Proceedings of the CSEE,2012,32(10):49-55(in Chinese).
[14]  Tuohy A,Denny E,O'Malley M.Rolling unit commitment for systems with significant installed wind capacity[C]// Proceedings of 2007 IEEE Lausanne Power Technology.Lausanne:IEEE,2007:1380-1385.
[15]  GB/T 19963-2011.风电场接入电力系统技术规定[S].北京:中国质检出版社,2011. GB/T 19963-2011.Technical rule for connecting wind farm to power system[S].Beijing:China Quality Inspection Publishing House,2011(in Chinese).
[16]  黄杨,胡伟,闵勇,等.计及风险备用的大规模风储联合系统广域协调调度[J].电力系统自动化,2014,38(9):41-47. Huang Yang,Hu Wei,Min Yong,et al.Risk-constrained coordinative dispatching for large-scale wind-storage systems[J].Automation of Electric Power Systems,2014,38(9):41-47(in Chinese).
[17]  陈建华,吴文传,张伯明,等.消纳大规模风电的热电联产机组滚动调度策略.电力系统自动化,2013,36(24):21-27. Chen Jianhua,Wu Wenchuan,Zhang Boming,et al.rolling generation dispatch strategy for co-generation units accommondating large-scale wind power integration[J].Automation of Electric Power Systems,2013,36(24):21-27(in Chinese).
[18]  徐玖平,李军.多目标决策的理论与方法[M].北京:清华大学出版社,2005. Xu Jiuping,Li Jun.Multiple objective decision making theory and methods[M].Beijing:Tsinghua University Press,2005(in Chinese).
[19]  Cohen A I,Yoshimura M.A branch-and-bound algorithm for unit commitment[J].IEEE Transactions on power apparatus and systems,1983,PAS-102(2):444-451.
[20]  汪洋,夏清,康重庆.机组组合算法中起作用整数变量的辨识方法[J].中国电机工程学报,2010,30(13):46-52. Wang Yang,Xia Qing,Kang Chongqing.Identification of the active integer variables in security constrained unit commitment[J].Proceedings of the CSEE,2010,30(13):46-52(in Chinese).
[21]  Raglend I J,Padhy N P.Solutions to practical unit commitment problems with operational,power flow and environmental constraints[C]//Proceedings of 2006 IEEE Power Engineering Society General Meeting.Montreal, Canada:IEEE,2006:1-8.
[22]  Chen C L.Optimal wind-thermal generating unit commitment[J].IEEE Transactions on Energy Conversion,2008,23(1):273-280.